Matter: Nova Scotia Power Inc. - Application for Financing Order authorizing the Securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider
275 passages 39 documents

Securitization across all matters →

N-1Application - Redacted 104 passages
1 1.0 INTRODUCTION p. p. 4
1 1.0 INTRODUCTION 2 - 3 In order to reduce costs for customers, Nova Scotia Power Incorporated (NS Power, Company), - 4 pursuant to section 35G of the Public Utilities Act (PUA), hereby applies to the Nova Scotia - 5 Energy Board (Board,...

AI summary Nova Scotia Power Incorporated (NS Power) applies to the Nova Scotia Energy Board for a Financing Order to securitize certain costs and recover them through a Securitization Rider. The application is made under section 35G of the Public Utilities Act, which authorizes the Board to approve such orders and allows for the issuance of Securitized Bonds and the imposition of a Securitized Surcharge.

- 23 each of the prescribed requirements is addressed in this Application. p. p. 4
- 23 each of the prescribed requirements is addressed in this Application. Required Information under Section 3(3) of the Securitization Regulations Relevant Section of the Application (a) A description of the costs the Electric Utility is...

AI summary The document outlines NS Power's application for a financing order to reduce customer costs through securitization. It details the costs to be securitized, financing costs, surcharges for recovery, and a formula-based true-up mechanism for adjustments.

NS Power Application for Financing Order to Reduce Costs for Customers Redacted p. pp. 4-46
NS Power Application for Financing Order to Reduce Costs for Customers Redacted Required Information under Section 3(3) of the Securitization Regulations Relevant Section of the Application (C) Securitized Surcharges that have been collect...

AI summary NS Power has applied for a financing order to reduce customer costs. The application includes details on securitized surcharges, flexibility in bond terms, and fund allocation methods. These details are outlined in Section 11.0 of the application.

Section 8 p. pp. 4-6
2 This Application arises directly from the securitization framework contemplated during the 3 Company's 2026-2027 General Rate Application (GRA). Within that proceeding, the Board 4 considered extensive evidence concerning the potential u...

AI summary This Application is related to the securitization framework discussed in the 2026-2027 General Rate Application (GRA). The Board previously considered securitization as a method to finance the retirement of thermal generation assets, reduce customer costs, and improve credit metrics for the utility.

NS Power Application for Financing Order to Reduce Costs for Customers Redacted p. pp. 7-46
NS Power Application for Financing Order to Reduce Costs for Customers Redacted - 1 As detailed within this Application, the proposed securitization satisfies the requirements of the - 2 Securitization Regulations and will provide substant...

AI summary NS Power is requesting a Financing Order from the Board to authorize the securitization of Securitized Costs and Financing Costs, which is expected to reduce customer costs, facilitate the retirement of thermal generation assets, and moderate rate impacts over the recovery period.

1 2.0 SECURITIZED COSTS p. pp. 7-9
1 2.0 SECURITIZED COSTS 2 - 3 Pursuant to the Securitization Regulations, NS Power seeks a Financing Order authorizing the - 4 securitization of certain Securitized Costs and the recovery of those costs, together with associated - 5 Financ...

AI summary NS Power is requesting a Financing Order to securitize $987.5 million in Securitized Costs, including Retired Generation Costs, Unretired Generation Costs, and other eligible expenses, through a Securitized Surcharge collected via a Securitization Rider. The rationale and financial benefits of securitization are detailed in Section 5.0 and Appendix A.

17 Figure 1: Summary of Securitized Costs ($ million) p. p. 9
17 Figure 1: Summary of Securitized Costs ($ million) Securitized Costs Eligible Costs Thermal Assets¹ $ 713.0 Thermal Assets Financing Cost Deferral² 27.6 PHP Deferral² 12.2 IESO Deferral² 20.2 Fuel and Purchased Power – Q3 2026 FAM Asset...

AI summary The text presents a summary of securitized costs, including thermal assets, financing cost deferrals, and other eligible costs totaling $987.5 million, with additional financing fees bringing the total securitization bond proceeds to $1,000.0 million. NS Power will reclassify the thermal asset balance to the Securitization Regulatory Asset.

22 2.1 Thermal Assets p. pp. 9-10
22 2.1 Thermal Assets - 24 NS Power seeks to securitize $740.6 million, consisting of the unrecovered net book value of - 25 thermal generation assets within the scope of the DDA as at December 31, 2025, together with - 26 deferred financi...

AI summary NS Power is seeking to securitize $740.6 million, which includes the unrecovered net book value of thermal generation assets as of December 31, 2025, and deferred financing costs from May 1, 2026, to November 30, 2026, calculated at a 6.59% WACC. This approach aligns with the 2026-2027 GRA and excludes costs already recovered through customer rates to avoid duplication.

NS Power Application for Financing Order to Reduce Costs for Customers Redacted p. p. 10
NS Power Application for Financing Order to Reduce Costs for Customers Redacted - 1 The DDA Assets proposed for securitization include the Point Aconi Generating Station, Trenton - 2 Units 5 and 6, Trenton Common Assets, Point Tupper Marin...

AI summary NS Power is applying for a financing order to securitize the unrecovered net book value of several DDA Assets, including the Point Aconi Generating Station and various other facilities. The application aims to reduce costs for customers.

Preamble p. pp. 10-39
- 8 The unrecovered net book value of the thermal generation assets and the associated deferred - 9 financing costs constitute Unretired Generation Costs within the meaning of the Securitization - 10 Regulations and, accordingly, constitut...

AI summary The text discusses the transfer of $713.0 million in unrecovered net book value of thermal generation assets from Property, Plant and Equipment to a Securitization Regulatory Asset, as part of a securitization process under the Securitization Regulations. This is described as Unretired Generation Costs and Securitized Costs that are eligible for securitization.

16 2.2 Fuel and Purchased Power p. pp. 10-11
16 2.2 Fuel and Purchased Power - 18 The Company is proposing to securitize $214.5 million of fuel and purchased power costs. This - 19 amount consists of $149.6 million in forecast under-recovered fuel and purchased power costs as

AI summary The Company is proposing to securitize $214.5 million in fuel and purchased power costs, which includes $149.6 million in forecast under-recovered costs. This initiative aims to address financial shortfalls related to fuel and power expenses.

3.2 Ongoing Financing Costs p. pp. 17-20
3.2 Ongoing Financing Costs 2 1 - 3 Ongoing Financing Costs means Financing Costs incurred after the issuance of the Securitized - 4 Bonds. Ongoing Financing Costs include, but are not limited to, servicing fees, trustee fees and - 5 expen...

AI summary This section defines Ongoing Financing Costs as expenses incurred after the issuance of Securitized Bonds, including servicing fees, trustee fees, audit costs, and reserve fund replenishment. NS Power provides an estimate of these costs in Figure 4.

Section 37 p. p. 20
29 value implications of the proposed Securitized Surcharge are discussed further in Section 5.0.

AI summary The text references the value implications of the proposed Securitized Surcharge, which are discussed in Section 5.0 of the document.

7 Figure 5: Summary of Securitization Analysis (Partially Confidential) p. pp. 20-26
7 Figure 5: Summary of Securitization Analysis (Partially Confidential) Traditional Recovery Securitization 22 23 The total 2027 revenue requirement associated with the Securitized Costs of Fuel and Purchased 24 Power described in Section...

AI summary The document discusses the 2027 revenue requirement associated with securitization, splitting it into two components: under-recovered fuel and purchased power costs as of September 30, 2026, and prepayment of future fuel and purchased power costs. The split is proportional to their respective shares of the total securitized costs.

5 6.4 IESO-NS Deferral p. pp. 26-27
5 6.4 IESO-NS Deferral 6 - 7 The total 2027 revenue requirement associated with the securitization of the IESO-NS Deferral is - 8 allocated to customer classes based on each class's forecast 2027 share of sales. This methodology - 9 is con...

AI summary The text discusses the allocation of the 2027 revenue requirement from the securitization of the IESO-NS Deferral to customer classes based on their forecasted share of sales. It references Appendix H for detailed allocation information.

1 7.0 CALCULATION OF SECURITIZATION RIDER BY CUSTOMER CLASS p. pp. 27-28
1 7.0 CALCULATION OF SECURITIZATION RIDER BY CUSTOMER CLASS 2 - 3 The Securitization Rider for each customer class is expressed in cents per kilowatt-hour (\phi/kWh). - 4 The rider is calculated by dividing the class-specific revenue requi...

AI summary The document outlines the calculation of the Securitization Rider by customer class, expressed in cents per kilowatt-hour. The rider is calculated using class-specific revenue requirements divided by the class's 2027 forecast annual sales. Appendices D, F, G-1, and G-2 provide relevant data and tariff amendments, with specific mentions of pending applications affecting certain tariff classes.

1 8.0 RATE IMPACT p. pp. 28-29
1 8.0 RATE IMPACT 2 - 3 The four securitization components have an estimated total revenue requirement of approximately - 4 $67.2 million in 2027. Recovery of the portion allocated to the FAM customer classes, totaling - 5 approximately $6...

AI summary The estimated total revenue requirement for the four securitization components is approximately $67.2 million in 2027, with an average rate increase of 3.3 percent for FAM customer classes. Appendix E provides detailed impacts on class revenues for each component.

11 Figure 6: Impact of the Securitization Rider on FAM customer class revenues in 2027 p. p. 29
11 Figure 6: Impact of the Securitization Rider on FAM customer class revenues in 2027 Increases in Customer Class Revenues in 2027 Securitization Rider Customer Class Thermal Assets (%) Fuel & Purchased Power (%) PHP Deferral (%) IESO NS...

AI summary Figure 6 illustrates the impact of the Securitization Rider on FAM customer class revenues in 2027, showing percentage increases across various customer classes, with the highest increase observed in the Municipal class at 5.6%.

Section 50 p. p. 29
2 Figure 7 below illustrates the Securitization Rider for Below the Line (BTL) customer class in 3 2027. 4

AI summary Figure 7 illustrates the Securitization Rider for Below the Line (BTL) customer class in 2027.

5 Figure 7: Securitization Rider for Below the Line (BTL) customer class in 2027 p. p. 29
5 Figure 7: Securitization Rider for Below the Line (BTL) customer class in 2027 2027 Securitization Rider (c/kWh) Customer Class Thermal Assets Fuel & Purchased Power PHP Deferral IESO NS Deferral Total GEN.REPL./LOAD FOLL. 0.310 - 0.005...

AI summary Figure 7 presents the securitization rider rates for different customer classes in 2027, including components such as thermal assets, fuel and purchased power, and various deferrals. The rates vary across customer classes, with the highest rate for the BUTU class and the lowest for the REAL TIME PRICING class.

1 Year 2 p. p. 31
1 Year 2 2 • The BA will consist solely of BA1 , which reconciles the over-collection or under-collection 3 of Securitized Surcharges from Year 1.

AI summary In Year 2, the Balancing Adjustment (BA) will be composed solely of BA1, which reconciles the over-collection or under-collection of Securitized Surcharges from Year 1.

5 Year 3 and Subsequent Years p. p. 31
5 Year 3 and Subsequent Years - 6 The BA will consist of: - 7 o BA1 , which reconciles the over-collection or under-collection of Securitized 8 Surcharges from Year 2; and - 9 o BA2 , which reconciles the over-collection or under-collectio...

AI summary The Balancing Adjustment (BA) for Year 3 and subsequent years includes BA1, which reconciles over-collection or under-collection of Securitized Surcharges from Year 2, and BA2, which reconciles over-collection or under-collection related to the collection or refund of Year 1's BA1 amount.

11 p. p. 31
11 - 12 This process will continue annually to ensure that all variances associated with both the Securitized - 13 Surcharge and prior BA are fully reconciled over time. Figure 9 below illustrates the annual - 14 reconciliation timeline:

AI summary The text discusses an annual process to reconcile variances associated with the Securitized Surcharge and prior Balancing Adjustment (BA) over time, with Figure 9 illustrating the annual reconciliation timeline.

16 Figure 9: Annual Reconciliation Timeline p. p. 31
16 Figure 9: Annual Reconciliation Timeline Year 1 Year 2 Year 3 and Beyond Forecast Collection of Securitized Surcharge in Year 1 - [SS] Forecast collection of Securitized Surcharge in Year 2 – [SS] Forecast collection of Securitized Surc...

AI summary The document outlines a timeline for the annual reconciliation of securitized surcharges, detailing forecast collection and over/under-collection across multiple years. It references the Balancing Adjustment (BA) mechanism for reconciliation purposes, as outlined in section 3(3)(f) of the relevant legislation.

NS Power Application for Financing Order to Reduce Costs for Customers Redacted p. p. 31
NS Power Application for Financing Order to Reduce Costs for Customers Redacted - any difference between estimated Ongoing Financing Costs financed by Securitized Bonds and the actual Ongoing Financing Costs incurred by the Company or an A...

AI summary The document outlines the calculation of Balancing Adjustments (BA) and BA riders in relation to Securitized Surcharges and Financing Orders, including formulas for determining BA(t), BA1(t), BA2(t), and the BA rider based on forecast sales and reconciliation amounts.

1 11.0 OVERVIEW OF SECURITIZATION TRANSACTION p. p. 37
1 11.0 OVERVIEW OF SECURITIZATION TRANSACTION 2 3 The Securitized Bonds will be issued by a bankruptcy-remote limited partnership (LP) to be 4 formed by NS Power, the general partner of which will be a special purpose corporation wholly 5...

AI summary The document outlines the securitization transaction structure, where NS Power will issue Securitized Bonds through a bankruptcy-remote limited partnership. The LP will acquire the Securitized Property and issue bonds secured by that property, with proceeds used to repay NS Power's traditional debt, resulting in customer savings.

6 11.1 Creation of Securitized Property p. p. 38
6 11.1 Creation of Securitized Property 7 8 Upon issuance of the Financing Order, Securitized Property shall be created in favour of NS 9 Power, consisting of all rights and interests under the Financing Order, including the right to 10 im...

AI summary The text outlines the creation of Securitized Property in favor of Nova Scotia Power upon the issuance of the Financing Order, including the rights to impose, bill, charge, collect, and receive the Securitized Surcharge and to obtain periodic adjustments.

13 11.2 Transfer of Securitized Property p. p. 38
13 11.2 Transfer of Securitized Property 14 15 NS Power proposes to sell, assign and transfer to the LP (acting through its general partner) all of 16 NS Power's right, title and interest in, to and under the Securitized Property, pursuant...

AI summary NS Power proposes to transfer its Securitized Property to LP through a sale agreement, which will take place after the Financing Order becomes effective and the transfer documents are executed and delivered. The LP will issue limited partnership units in exchange for the Securitized Property.

NS Power Application for Financing Order to Reduce Costs for Customers Redacted p. p. 38
NS Power Application for Financing Order to Reduce Costs for Customers Redacted 1 which will constitute value received for, and the fair equivalent value of, the Securitized Property 2 for the purposes of section 16(c) of the Securitizatio...

AI summary NS Power is applying for a financing order to securitize certain assets, transferring ownership of the Securitized Property under the Securitization Regulations. The transfer is absolute, and NS Power will retain only limited rights as a servicer and limited partner. This process is consistent with regulatory provisions and will not be affected by various financial or legal factors.

18 11.3 Loan of Bond Proceeds p. pp. 38-39
18 11.3 Loan of Bond Proceeds 19 20 The advance of Securitized Bond proceeds by the LP to NS Power will be made under a loan 21 agreement that is separate from, and does not form part of the consideration for, the sale of the 22 Securitize...

AI summary The document outlines the terms of a loan agreement for the advance of Securitized Bond proceeds by the LP to NS Power, emphasizing that the loan is separate from the sale of the Securitized Property and that NS Power's obligations are general and not secured by the Securitized Property.

14 11.5 Servicer and Successor Servicer p. pp. 39-40
14 11.5 Servicer and Successor Servicer 15 - 16 NS Power will serve as the initial servicer, responsible for billing, collecting, and remitting the - 17 Securitized Surcharge, filing true-up adjustments, and performing other administrative...

AI summary NS Power is designated as the initial servicer for the Securitized Surcharge, with responsibilities including billing, collection, and administrative duties. A successor servicer may be appointed if NS Power is unable or unwilling to continue, to ensure uninterrupted collection for bondholders.

22 11.6 Priority of Payments p. p. 40
22 11.6 Priority of Payments - 24 Securitized Surcharge collections remitted to the LP or the indenture trustee are expected to be - 25 applied generally in the following order of priority, subject to the terms of the definitive transactio...

AI summary This section outlines the priority of payments for Securitized Surcharge collections, specifying that funds are applied in a defined order: Ongoing Financing Costs, interest on Securitized Bonds, principal on Securitized Bonds, replenishment of reserve accounts, and finally the release of any surplus.

10 11.7 Flexibility in Bond Terms p. pp. 40-41
10 11.7 Flexibility in Bond Terms 11 - 12 Pursuant to section 3(3)(g) of the Securitization Regulations, NS Power requests flexibility be - 13 afforded to it in establishing the terms and conditions of the Securitized Bonds, including but...

AI summary NS Power is requesting flexibility in bond terms under the Securitization Regulations, allowing for adjustments in repayment schedules, interest rates, and financing costs, provided the transaction remains aligned with prevailing interest rates and delivers quantifiable net present value benefits to customers.

21 11.8 Indemnity Agreement p. p. 41
21 11.8 Indemnity Agreement - 23 An essential part of the securitization transaction is the provision of an Indemnity Agreement by - 24 the Government of Nova Scotia. This is required by credit rating agencies because the security - 25 for...

AI summary The Indemnity Agreement provided by the Government of Nova Scotia is essential for the securitization transaction, as required by credit rating agencies to ensure bondholder protection in case of regulatory changes that could impact bond repayment.

1 13.0 IMPACT ON THE DECARBONIZATION DEFERRAL ACCOUNT (DDA) p. pp. 43-45
1 13.0 IMPACT ON THE DECARBONIZATION DEFERRAL ACCOUNT (DDA) 2 3 As described in Section 2.1, the proposed securitization applies to $740.6 million of unrecovered 4 net book value and deferred financing costs associated with thermal generat...

AI summary The document discusses the impact of securitization on the Decarbonization Deferral Account (DDA), noting that it would reduce the DDA balance significantly but still require recovery of decommissioning and sustaining capital costs. NS Power argues the DDA remains important for transparent and cost-effective recovery of thermal generation asset retirement costs.

1 14.0 RELIEF SOUGHT p. pp. 45-46
1 14.0 RELIEF SOUGHT 2 3 Pursuant to section 35G of the PUA, NS Power respectfully requests that the Board issue a 4 Financing Order, to take effect immediately upon issuance by the Board of its decision in this 5 matter, that is consisten...

AI summary NS Power is requesting the Board to issue a Financing Order under the Public Utilities Act, allowing for the interim approval of the Securitized Surcharge and its implementation via a Securitization Rider effective January 1, 2027. The request includes the allocation of the surcharge and a process to adjust it after a regulatory review.

23 p. p. 46
23 Financing Order Requirements Under Section 5(1) Application Reference (a) The amount and a breakdown by category of Securitized Costs to be financed using Securitized Bonds and a finding that recovery of those costs is just and reasonab...

AI summary The text outlines financing order requirements under Section 5(1), specifically addressing the amount and breakdown of Securitized Costs to be financed via Securitized Bonds, with a requirement to determine if recovery is just and reasonable for customers.

8 2.1 Proposed Solution to Address FAM AA/BA Balance p. pp. 55-56
8 2.1 Proposed Solution to Address FAM AA/BA Balance 9 NS Power is proposing to securitize the outstanding FAM AA/BA balance and recover the 10 associated costs over a 30-year period, rather than recovering the full balance in 2027. The 11...

AI summary NS Power proposes to securitize the outstanding FAM AA/BA balance and recover the associated costs over a 30-year period instead of in 2027. This approach includes both the current unrecovered balance and forecasted under-recovery to provide additional protection.

17 Power balance would result in an average rate increase of approximately 0.7 percent in 2027. p. p. 56
17 Power balance would result in an average rate increase of approximately 0.7 percent in 2027. 19 Figure 2 – Percentage increase in class revenues due to securitization of fuel and purchased 20 power balance 2027 FAM Riders – Percentage I...

AI summary The text discusses a projected average rate increase of approximately 0.7 percent in 2027 due to a power balance, as well as a table showing the percentage increase in class revenues due to the securitization of fuel and purchased power balance.

Appendix C: 2027 FAM AA/BA p. pp. 56-57
Appendix C: 2027 FAM AA/BA 2027 FAM Riders – Percentage Increase Customer Class AA BA FAM AA/BA Fuel & Purchased Power Securitization Rider Total Large General 0.0 0.0 0.0 1.6 1.6 Small Industrial 0.0 0.0 0.0 0.9 0.9 Medium Industrial 0.0...

AI summary This section outlines the repayment of $117 million to Invest Nova Scotia, likely related to a financial agreement or investment. The table presents the percentage increases for various customer classes under the 2027 FAM AA/BA riders, with the Fuel & Purchased Power Securitization Rider being the only non-zero value.

2026 Securitization Rider Application Appendix C Page 9 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 60
2026 Securitization Rider Application Appendix C Page 9 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Appendix C: 2027 FAM AA/BA 1 Item 1 in [Figure 5](#page-60-1) is September 30, 2025 BCF Balance amount with interest and can be found...

AI summary This appendix provides detailed breakdowns of the 2027 Fuel Adjustment Mechanism (FAM) Affordable Access/Bill Adjustment (AA/BA) rider, including balances, under-recoveries, interest calculations, and collections for specific time periods, referencing Attachment 1 for data.

2026 Securitization Rider Application Appendix C Page 10 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 60
2026 Securitization Rider Application Appendix C Page 10 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Appendix C: 2027 FAM AA/BA - 1 Item 11 in [Figure 5](#page-60-1) is the 2026 actual beginning of year BA amount, and can be found in...

AI summary This section of the 2026 Securitization Rider Application Appendix C outlines the calculation of the 2027 Fuel Adjustment Mechanism (FAM) Affordable Access/Bill Adjustment (AA/BA) amounts. It references specific line items in Attachment 1 and explains how various components, including interest and balances, are aggregated to determine the final 2027 BA amount.

9 Customer class p. p. 63
9 Customer class 10 [Figure 7](#page-64-1) below presents the proposed collection of the 2027 revenue requirement associated with 11 the securitization of Fuel and Purchased Power balance. The total 2027 revenue requirement of 12 approxima...

AI summary The text discusses the proposed 2027 revenue requirement of approximately $14.1 million related to the securitization of Fuel and Purchased Power balance, including both the existing balance as of September 30, 2026, and the forecasted balance expected from October 1, 2026, to December 31, 2027.

1 Figure 7 – Proposed 2027 Collection through Securitization Rider for Fuel and Purchased 2 Power Balance by Customer class p. pp. 63-64
1 Figure 7 – Proposed 2027 Collection through Securitization Rider for Fuel and Purchased 2 Power Balance by Customer class Customer class AA ($ Million) BA ($ Million) Collection through Securitization Rider for Fuel and Purchased Power i...

AI summary Figure 7 presents the proposed 2027 collection through securitization rider for fuel and purchased power balance by customer class, showing different amounts across various categories, with the total collection amount being $14.1 million.

2026 Securitization Rider Application Appendix C Page 13 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 64
2026 Securitization Rider Application Appendix C Page 13 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Appendix C: 2027 FAM AA/BA - 1 For the 2027 AA and BA calculations, the 2026 revenue-to-cost (R/C) ratio is applied to customer - 2...

AI summary This section outlines the methodology for calculating the 2027 Fuel Adjustment Mechanism (FAM) Affordable Access/Bill Adjustment (AA/BA), including the application of the 2026 revenue-to-cost ratio, allocation of fuel costs by customer class, deduction of base rate recoveries, and apportionment of interest adjustments and non-fuel-related costs based on rate base shares.

2026 Securitization Rider Application Appendix C Page 14 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 65
2026 Securitization Rider Application Appendix C Page 14 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Appendix C: 2027 FAM AA/BA - 1 NS Power is proposing to securitize the outstanding OATT MEUs FAM AA/BA balance and - 2 recover the a...

AI summary NS Power is proposing to securitize the outstanding OATT MEUs FAM AA/BA balance and recover the associated costs over a 30-year period instead of in 2027. The 2027 revenue requirement includes both the balance as of September 30, 2026, and the forecast balance expected through December 31, 2027.

9 p. pp. 65-66
9 10 Figure 9 – OATT MEUs Collection for Securitization of Fuel and Purchased Power Balance 11 in 2027 Collection for Securitization of Purchased Power Balance Fuel and in 2027 ($) OATT MEUs Annual Monthly Antigonish 257,580 21,465 Berwick...

AI summary This section presents a table showing the OATT MEUs collection for the securitization of fuel and purchased power balance in 2027, including annual and monthly figures for various locations. A confidential attachment related to the 2026 Securitization Rider Application is also mentioned.

REDACTED 2026 Securitization Rider Application Appendix C Attachment 2 Page 1 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 66
REDACTED 2026 Securitization Rider Application Appendix C Attachment 2 Page 1 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) FAM Rate Classes (ATL) Oct 2025-Sept 2026 GWh Energy Requirement Actual Fuel Costs Recovered Fuel Costs Recovere...

AI summary The table presents detailed financial data for the Fuel Adjustment Mechanism (FAM) across various rate classes in Nova Scotia for the period October 2025 to September 2026. It includes figures for energy requirements, actual and recovered fuel costs, variance, and the FAM AA rider in cents per kWh for 2027.

BUTU Capacity Credit Calc. p. p. 66
BUTU Capacity Credit Calc. Installed Capacity Capacity Credit Approved Contract Demands (kWs) FAM-related Demand Charge Gross Demand Payment Net Demand payment bfr Credits Capacity Credit Ellershouse Imports 23,500 20.5% 7,549 $1.456 Total...

AI summary This document presents a capacity credit calculation table for Ellershouse Imports, showing installed capacity, capacity credit percentage, approved contract demands, and a net demand payment of -$70,272. It is part of a redacted 2026 Securitization Rider Application Appendix C Attachment 2.

REDACTED 2026 Securitization Rider Application Appendix C Attachment 2 Page 8 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 66
REDACTED 2026 Securitization Rider Application Appendix C Attachment 2 Page 8 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Annual Peak of ATL Annual Energy Requirement of ATL 2,481,214 21,735,437,100 20,325,436,463 20,325,436,463 94% S...

AI summary The document presents detailed financial and operational data related to the 2026 Securitization Rider Application, including rate base calculations, plant costs, and generation-related assets. It includes tables with figures for various plants and their associated costs, as well as classifications for rate base components.

APPLICABILITY p. p. 66
APPLICABILITY The Securitization Cost Recovery Rider (SECRR) is non-bypassable, is imposed on, and is part of, all customer bills, and shall be collected in accordance with a Financing Order issued pursuant to section 35G of the Public Uti...

AI summary The Securitization Cost Recovery Rider (SECRR) is a non-bypassable charge applied to all customer bills from NS Power, regardless of whether customers switch to alternative suppliers. It is enforced under a Financing Order from the Public Utilities Act.

PURPOSE p. p. 66
PURPOSE The purpose of the SECRR is to provide for the recovery of the Securitized Surcharge approved by the Board in accordance with a Financing Order issued pursuant to section 35G of the Public Utilities Act.

AI summary The SECRR aims to recover the Securitized Surcharge approved by the Board under a Financing Order issued under section 35G of the Public Utilities Act.

ADJUSTMENTS p. p. 66
ADJUSTMENTS Subject to NS Power making application for recovery through the SECRR, recoverable amounts shall be limited to those approved by the Board in a Financing Order. The SECRR shall include: - a class-specific Securitized Surcharge...

AI summary The document outlines the structure and purpose of the Securitization Cost Recovery Rider (SECRR), including the Securitized Surcharge (SS) and Balancing Adjustment (BA), which are designed to recover financing and securitization costs from customer classes based on approved methodologies and effective from January 1, 2027.

CALCULATION OF THE SECRR p. p. 66
CALCULATION OF THE SECRR The monthly amount calculated under each applicable rate schedule shall be increased or decreased by the SECRR, expressed in cents per kilowatt-hour (¢/kWh), as follows: SECRR = SS + BA Where: BA = BA_1 + BA_2 and:...

AI summary The SECRR (Securitization Cost Recovery Rider) is calculated using SS and BA, which includes BA1 and BA2. BA1 accounts for over or under-collection of surcharges, while BA2 adjusts for prior year BA1 amounts. The calculation uses actual and forecast billing data, with annual updates based on the True-Up Mechanism approved by the Board.

Securitization Cost Recovery Rider Rates for 2027 p. p. 66
Securitization Cost Recovery Rider Rates for 2027 Securitization Cost Recovery Rider Customer Class SS (¢/kWh) BA1 (¢/kWh) BA2 (¢/kWh) SECRR (¢/kWh) Domestic Service, Domestic Service Time-of Day, Domestic Service Time-of-Use, Domestic 0.6...

AI summary The document outlines the Securitization Cost Recovery Rider (SECRR) rates for 2027, detailing the rates for various customer classes. These rates are effective from January 1, 2027, and are structured to recover costs associated with securitization.

SECURITIZATION COST RECOVERY RIDER p. pp. 15-197
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 84
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits applicable to the Tariff for the current rate year, in addition to the energy charge, shown in the rider.

SECURITIZATION COST RECOVERY RIDER p. p. 88
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits applicable to the Tariff for the current rate year, in cents per kilowatt-hour, which apply in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 88
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 97
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 101
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, in addition to the energy charge.

2026 Securitization Rider Application Appendix G-1 (Redline) Page 24 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 101
2026 Securitization Rider Application Appendix G-1 (Redline) Page 24 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) GENERAL TARIFF Page 2 of 3 Rate Code 11 Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) app...

AI summary This document outlines the application for a 2026 Securitization Rider, specifying that Securitization Cost Recovery charges or credits, as detailed in the Securitization Cost Recovery Rider, will apply in addition to the energy charge for the current rate year.

SECURITIZATION COST RECOVERY RIDER p. p. 107
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits applicable to the Tariff for the current rate year, in cents per kilowatt-hour, which are applied in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 111
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 111
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

2026 Securitization Rider Application Appendix G-1 (Redline) Page 38 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 111
2026 Securitization Rider Application Appendix G-1 (Redline) Page 38 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) LARGE GENERAL TARIFF Page 2 of 2 (2,000 kVA or 1,800 kW and over) Rate Code 12 Securitization Cost Recovery charges or c...

AI summary The document outlines the application of Securitization Cost Recovery charges or credits in cents per kilowatt-hour for the 2026 rate year, as part of the Securitization Rider, which applies in addition to the energy charge for large general tariff customers.

2026 Securitization Rider Application Appendix G-1 (Redline) Page 40 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 111
2026 Securitization Rider Application Appendix G-1 (Redline) Page 40 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) SMALL INDUSTRIAL TARIFF Page 2 of 2 (up to 249 kVA or 224 kW) Rate Code 21 Securitization Cost Recovery charges or credi...

AI summary This section of the 2026 Securitization Rider Application discusses the application of Securitization Cost Recovery charges or credits to the Small Industrial Tariff (Rate Code 21), which are applied in addition to the energy charge for customers with up to 249 kVA or 224 kW.

2026 Securitization Rider Application Appendix G-1 (Redline) Page 42 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 111
2026 Securitization Rider Application Appendix G-1 (Redline) Page 42 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) MEDIUM INDUSTRIAL TARIFF Page 2 of 2 (250 kVA or 225 kW to 1,999 kVA or 1,799 kW) Rate Code 22 Securitization Cost Recov...

AI summary This section of the 2026 Securitization Rider Application outlines the application of Securitization Cost Recovery charges or credits to the Medium Industrial Tariff Rate Code 22, which applies in addition to the energy charge for the current rate year.

SECURITIZATION COST RECOVERY RIDER p. p. 111
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits applicable to the Tariff in cents per kilowatt-hour for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 111
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

2026 Securitization Rider Application Appendix G-1 (Redline) Page 52 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 111
2026 Securitization Rider Application Appendix G-1 (Redline) Page 52 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) UNMETERED SERVICE RATES Page 1 of 12 Rate Code 41 Note: rates listed under 2026 shall be effective upon the date of the...

AI summary This document outlines the 2026 Securitization Rider Application Appendix G-1, which includes redacted information. It specifies that service rates under 2026 will be effective upon the Board's Order, while rates under 2027 will take effect on January 1, 2027.

SECURITIZATION COST RECOVERY RIDER p. p. 111
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, in addition to the energy charge.

(a) Continuous Burning – Operating Only p. pp. 83-155
(a) Continuous Burning – Operating Only Number of kWh per per month ($) Rate Code Bulb Length Bulbs per Unit month 2026 2027 Other 117 72 4 486 74.47 79.07 118 24 2 66 10.11 10.74 119 48 4 364 55.78 59.22 120 96 2 254 38.92 41.33 150 96 4...

AI summary The document presents tables detailing electricity usage and associated costs for different rate codes under Continuous Burning and Photocell Operation categories, with data provided for the years 2026 and 2027. The information is part of a securitization rider application and includes redacted confidential details.

Nova Scotia Power Incorporated Distribution Tariff p. pp. 83-111
Nova Scotia Power Incorporated Distribution Tariff 2026 Securitization Rider Application Appendix G-1 (Redline) Page 65 of 86

AI summary The document is a redline version of Appendix G-1 from the 2026 Securitization Rider Application by Nova Scotia Power Incorporated, focusing on the distribution tariff.

2026 Securitization Rider Application Appendix G-1 (Redline) Page 74 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 154-155
2026 Securitization Rider Application Appendix G-1 (Redline) Page 74 of 86 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Nova Scotia Power Distribution Tariff Page 9 of 10 APPENDIX A: DISTRIBUTION TARIFF RATE SCHEDULES

AI summary The document is a redacted section of an application for a 2026 Securitization Rider, focusing on the Nova Scotia Power Distribution Tariff. It includes Appendix A, which outlines Distribution Tariff Rate Schedules, though specific details are confidential and removed.

(a) Operating, Maintenance, and Capital (full charge) p. p. 155
(a) Operating, Maintenance, and Capital (full charge) kWh per per month ($) Rate Code Watts month 2026 2027 Other 100 100 43 10.44 11.17 101 125 52 11.31 12.07 2026 Securitization Rider Application Appendix G-1 (Redline) Page 79 of 86 REDA...

AI summary The text provides a table detailing operating, maintenance, and capital costs associated with different rate codes, including kWh per month and associated monthly costs for 2026 and 2027. The section is part of a securitization rider application and contains redacted confidential information.

SECURITIZATION COST RECOVERY RIDER p. p. 170
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 174
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. pp. 160-187
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, in addition to the energy charge.

LARGE GENERAL TARIFF Page 2 of 2 p. p. 197
LARGE GENERAL TARIFF Page 2 of 2 (2,000 kVA or 1,800 kW and over) Rate Code 12 Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cos...

AI summary The document outlines the application of Securitization Cost Recovery charges or credits in cents per kilowatt-hour for the Large General Tariff, applicable to Rate Code 12 in the current rate year, as specified in the Securitization Cost Recovery Rider.

SMALL INDUSTRIAL TARIFF Page 2 of 2 p. p. 197
SMALL INDUSTRIAL TARIFF Page 2 of 2 (up to 249 kVA or 224 kW) Rate Code 21 Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Re...

AI summary The document outlines the application of Securitization Cost Recovery charges or credits in cents per kilowatt-hour for the Small Industrial Tariff, Rate Code 21, which are applied in addition to the energy charge as part of the current rate year.

MEDIUM INDUSTRIAL TARIFF Page 2 of 2 p. pp. 170-197
MEDIUM INDUSTRIAL TARIFF Page 2 of 2 (250 kVA or 225 kW to 1,999 kVA or 1,799 kW) Rate Code 22 Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Se...

AI summary The document outlines the application of Securitization Cost Recovery charges or credits in cents per kilowatt-hour for Rate Code 22 under the Medium Industrial Tariff, which applies in addition to the energy charge.

1. DEFINITIONS p. p. 33
vider : NS Power. Securitization Cost Recovery Charges : Costs of Securitization that NS Power is entitled to recover from RtR Customers in accordance with the Securitization Cost Recovery Rider. Transmission Services : The services obtain...

AI summary This section defines key terms related to transmission services, securitization cost recovery charges, and wholesale customers within the context of Nova Scotia Power's operations and regulatory framework.

cents per kilowatt-hour p. pp. 41-56
cents per kilowatt-hour Interim Energy Charge During a Critical Peak Event Non-critical Peak Hours Effective upon the date of the Board's Order n/a 18.324 1 M12499 – Board Decision, 325286, page 5. October 28, 2025. 2026 Securitization Rid...

AI summary The document provides a table showing the interim energy charge during a Critical Peak Event and Non-critical Peak Hours, with a rate of 18.324 cents per kilowatt-hour. It also references a Board Decision (M12499) dated October 28, 2025, and is part of a 2026 Securitization Rider Application Appendix.

Interim Energy Charge (Non cents per p. pp. 56-60
Interim Energy Charge (Non cents per winter Period) kilowatt-hour April 1 through October 31 (all hours) Effective upon the date of the Board's Order 18.324 1 M12499 – Board Decision, 325286, page 5. October 28, 2025. 2026 Securitization R...

AI summary The document outlines the interim energy charge for the non-winter period, effective from April 1 to October 31, set at 18.324 cents per kilowatt-hour upon the date of the Board's Order. It also references a Board Decision (M12499) from October 28, 2025, and is part of the 2026 Securitization Rider Application Appendix G-2 (Clean).

SECURITIZATION COST RECOVERY RIDER p. p. 60
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, which are applied in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 60
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, in addition to the energy charge.

cents per kilowatt-hour p. pp. 60-69
cents per kilowatt-hour Interim Energy Charge During a For the first 200 For all Critical Peak kilowatt-hours per additional Event month kilowatt-hours Effective upon the date of the Board's Order n/a 18.919 17.112 1 M12499 – Board Decisio...

AI summary The document contains a table with energy charge rates and references a Board Decision (M12499) from October 28, 2025, related to a 2026 Securitization Rider Application. The table outlines interim energy charges, including rates for different kilowatt-hour thresholds and Critical Peak Events.

SECURITIZATION COST RECOVERY RIDER p. p. 69
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 73
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, in addition to the energy charge.

2026 Securitization Rider Application Appendix G-2 (Clean) Page 24 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 73
2026 Securitization Rider Application Appendix G-2 (Clean) Page 24 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) GENERAL TARIFF Page 2 of 3 Rate Code 11 Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) appli...

AI summary This section outlines the application of Securitization Cost Recovery charges or credits in cents per kilowatt-hour as part of the Tariff for the current rate year, as specified in the Securitization Cost Recovery Rider, which applies in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 79
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 83
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour applicable to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 83
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

2026 Securitization Rider Application Appendix G-2 (Clean) Page 38 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 83
2026 Securitization Rider Application Appendix G-2 (Clean) Page 38 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) LARGE GENERAL TARIFF Page 2 of 2 (2,000 kVA or 1,800 kW and over) Rate Code 12 Securitization Cost Recovery charges or cre...

AI summary This section of the 2026 Securitization Rider Application outlines the application of Securitization Cost Recovery charges or credits to the Tariff for the current rate year, specifically for large general tariff customers with a capacity of 2,000 kVA or 1,800 kW and over.

SECURITIZATION COST RECOVERY RIDER p. p. 83
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

2026 Securitization Rider Application Appendix G-2 (Clean) Page 42 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 83
2026 Securitization Rider Application Appendix G-2 (Clean) Page 42 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) MEDIUM INDUSTRIAL TARIFF Page 2 of 2 (250 kVA or 225 kW to 1,999 kVA or 1,799 kW) Rate Code 22 Securitization Cost Recover...

AI summary This document outlines the application for a 2026 Securitization Rider, detailing how Securitization Cost Recovery charges or credits are applied to the Medium Industrial Tariff Rate Code 22, in addition to the energy charge for the current rate year.

SECURITIZATION COST RECOVERY RIDER p. p. 83
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

SECURITIZATION COST RECOVERY RIDER p. p. 83
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits in cents per kilowatt-hour that apply to the Tariff for the current rate year, in addition to the energy charge.

2026 Securitization Rider Application Appendix G-2 (Clean) Page 68 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 119
2026 Securitization Rider Application Appendix G-2 (Clean) Page 68 of 87 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Nova Scotia Power Distribution Tariff Page 3 of 10 Retail Supplier : This term has the same meaning as under the Act. Reta...

AI summary The document outlines definitions related to the Nova Scotia Power Distribution Tariff, including terms such as Retail Supplier, Retail Customer, RtR Customer, and Transmission System. It also discusses cost recovery mechanisms such as Storm Cost Recovery Charges and Securitization Cost Recovery Charges.

SECURITIZATION COST RECOVERY RIDER p. p. 147
SECURITIZATION COST RECOVERY RIDER Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cost Recovery Rider, shall apply, in addition t...

AI summary The Securitization Cost Recovery Rider outlines charges or credits applicable to the Tariff for the current rate year, in cents per kilowatt-hour, which are applied in addition to the energy charge.

LARGE GENERAL TARIFF Page 2 of 2 p. p. 170
LARGE GENERAL TARIFF Page 2 of 2 (2,000 kVA or 1,800 kW and over) Rate Code 12 Securitization Cost Recovery charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the Securitization Cos...

AI summary The text outlines the application of Securitization Cost Recovery charges or credits in cents per kilowatt-hour for large general tariff customers with a capacity of 2,000 kVA or 1,800 kW and over, as specified in the Securitization Cost Recovery Rider.

Licenced Retail Supplier (LRS) : A Retail Supplier who: p. p. 6
ost Recovery Charges : Costs of Securitization that NS Power is entitled to recover from RtR Customers in accordance with the Securitization Cost Recovery Rider. Transmission Provider : NS Power. Transmission Services : The services obtain...

AI summary The text defines key terms related to the Nova Scotia Power Distribution Tariff, including Ost Recovery Charges, Transmission Provider, Transmission Services, Transmission System, and Wholesale Customer. These definitions outline the responsibilities and rights of NS Power and its customers under the tariff.

Dear Vivek Sood: p. p. 15
Dear Vivek Sood: In order to manage sharp increases to electricity costs for Nova Scotians, the Government of Nova Scotia has continued its engagement with Nova Scotia Power and other relevant stakeholders to develop an approach that would...

AI summary The Government of Nova Scotia is engaging with Nova Scotia Power and stakeholders to develop a financing order for securitization of prematurely retired coal assets. The process involves enacting regulations under the Public Utilities Act and providing a provincial indemnity to secure favorable credit ratings for bonds issued to securitize costs.

N-2Letters of Comment - Redacted 2 passages
Section 1
From: Energy and Regulatory Boards Tribunal To: Henwood, Crystal D Cc: Painting-MacLean, Kimberly Subject: FW: Letter of Comment –Nova Scotia Power Inc. Securitization and Rider Application (October 2026) Date: October 13, 2026 8:06:59 AM...

AI summary A residential customer of Nova Scotia Power expresses concern over a proposed 2.9% securitization rider to be added to electricity bills in 2027, which, combined with an existing 3.9% rate increase, would result in a 6.8% overall increase in energy costs. The customer highlights the financial burden on households and the lack of alternatives in a regulated monopoly.

Section 2
ption to choose another electricity provider. This rate increase will directly affect my household budget by adding an estimated $150 per year to our expenses, making it harder to afford home heating. I ask that the Board rigorously audit...

AI summary The letter from Daniel MacKinnon highlights concerns about an upcoming rate increase, estimating an additional $150 annual cost to his household. He requests a rigorous audit of Nova Scotia Power's assets and deferred costs to ensure ratepayers are not unfairly burdened and that the securitization mechanism provides maximum public savings.

N-3Transcript of Technical Conference held October 15, 2026 24 passages
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS - and - IN THE MATTER OF: AN APPLICATION by NOVA SCOTIA POWER INCORPORATED for approval of...

AI summary This proceeding involves Nova Scotia Power's application for a financing order to securitize $1 billion in costs collected via a Securitization Cost Recovery Rider, under the Public Utilities Act and related regulations.

Section 9
bviously the formal process - that's been outlined by the Board but, as has been the - case leading up to this and as will continue to be the - case, from our perspective, if there are questions or - discussions that any of you think would...

AI summary The speaker emphasizes the Board's formal process and encourages open communication beyond the Hearing Order. A decision on the application is expected within 60 days, with a financing order likely to include conditions related to securitization and customer benefits based on bond yields.

Section 10
ORTING INC. CERTIFIED COURT REPORTERS MS. RUBIN: Blake, sorry to interject. - You're really choppy. You're kind of going in and out and - I don't know if it's you're leaning back or turning back - around, but if you could position yourself...

AI summary The speaker discusses the financing order issued by the Board, which sets parameters for bond yields when going to market. Once assets transfer or bonds are issued, the financing order becomes irrevocable. The 60-day period is mentioned for decision-making, with the possibility of interim approval of the securitization rider.

Section 11
terim - basis. So what those rate impacts that flow from the - securitization may be for customers would be approved on a - I'll stop looking at the camera. - So it's anticipated that the Board - INTERNATIONAL REPORTING INC. CERTIFIED COUR...

AI summary The speaker discusses the interim approval of rate impacts from securitization by the Board, allowing for a further regulatory process to determine the final split of the securitized surcharge among customer classes. The process is compared to past regulatory proceedings, such as the 500 million LFG filing, but notes that the current situation involves only one applicant.

Section 16
he $500 million FLG - piece, was disappointed that after they had agreed with it - occurring, in the subsequent process something arose that - they did not anticipate whatsoever. So we have to make - sure that this is the process to deal w...

AI summary The discussion focuses on concerns about the securitization process and the allocation of funds, emphasizing the need to avoid disputes over how funds are distributed to different customer classes. The speaker highlights the importance of addressing these issues within the current proceeding to prevent future conflicts.

Section 19
ery - tight timelines that the Board's working under here. - INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS MS. RUBIN: We can send it - immediately. - MR. WILLIAMS: Okay. Any other - questions on what was intended to be the intro?...

AI summary The discussion focuses on the securitization of costs, including thermal assets and PHP deferral, as part of a bond transaction. The timeline for the financing transaction is highlighted, with deferred financing costs considered from May to November 2025. This is related to the General Rate Application and the GRA decision.

Section 22
e it facilitates the potential - transition of PHP to an above-the-line tariff that can - provide increased contribution towards fixed costs for - customers on a go-forward basis and assists in the - introduction of PHP's wind resource to...

AI summary The text discusses the securitization transaction involving the transition of the Public Health Program (PHP) to an above-the-line tariff, which would help cover fixed costs and integrate PHP's wind resource into the Nova Scotia grid. The International Energy Services Organization (IESO) deferral is also mentioned, with costs totaling $20.2 million. The IESO is described as a long-lived organization supporting energy transition goals.

Section 24
ar? Including FAM the FAM costs. - MR. FLEMMING: So Libby, I'll start, - and then maybe some folks in the room have something that - they want to add that and I do have some more detailed - fuel costs as well in the upcoming page here. - B...

AI summary The discussion revolves around the costs associated with the FAM and the IESO deferral balance, emphasizing the need to distribute these costs over current and future customers. The speaker highlights the long-term value of the energy transition and the securitization transaction, while a question is raised about the discrepancy between the IESO deferral balance and the submitted budget.

Section 27
oximate rate increase - of about seven to eight percent for an average across all - customer classes. - Securitization of unexpected fuel - balances has been employed in other jurisdictions and in - Nova Scotia previously. So that was with...

AI summary The text discusses the securitization of fuel costs, including a $500 million fuel balance from a previous proceeding, and argues that securitization allows for cost-effective recovery of these costs, benefiting both current and future customers and supporting Nova Scotia Power's credit ratings.

Section 28
d number and in terms of market - INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS interest, was there any discussion of other round numbers, - say, 900 million? Is there any practical sort of - considerations with going with a diffe...

AI summary The discussion revolves around the securitization of costs and the potential impact on customer rates. The participants consider a $1 billion cap as optimal for customer benefit and explore the feasibility of using a lower round number. There is also a question about the analysis behind the IR process and a discrepancy in the timing of cost recovery, with one participant noting a potential seven to eight percent rate increase if securitization is not used.

Section 32
lion. - MR. ROSCOE: Okay. That's 149, not - the 214. Okay. - MR. WILLIAMS: That's right. - So I that helps put all this into - context and then we're talking about big numbers here. - If these components are not included in securitization,...

AI summary The discussion highlights concerns about the potential for a significant rate increase if unrecovered fuel costs are not included in securitization. The speaker emphasizes the policy implications of including fuel costs and the impact on customers, noting recent government announcements that underscore the importance of this decision.

Section 34
crease really jeopardizes that policy objective, I - think. - So sorry. That was a bit of a - sidetrack, but Craig. - MR. FLEMMING: Yeah, so thank you. - So Daniel, I was going to start by - I was going to start my response the same way Bl...

AI summary The discussion centers on the potential rate increase of approximately 7 to 8 percent, with adjustments based on the balance of $150 million and expected under-recovery of about 2 percent. The conversation also touches on the role of the FAM and securitization in managing these financial aspects.

Section 36
u know, costs previous costs - incurred, so having that amortized over a long period at a - good interest rate is of benefit to those customers - switching. - Where we bristle at the suggestion - that now precedent has been set about finan...

AI summary The discussion highlights concerns about amortizing past fuel costs over long periods at favorable interest rates, and the potential negative impact of securitization on ratepayers. There is a disagreement over the inclusion of future fuel costs in the rate adjustment process, with one party arguing it may be inefficient and costly.

Section 38
ese types of balances that we need to deal with, - and we're certainly recognizing that it's not in - customers' best interests to have those types of balances, - and not in anyone's best interest. - And so I think ultimately that's the -...

AI summary The discussion revolves around the management of financial balances, particularly the FAM (Financial Accountability Mechanism) and securitization assets. There is a concern about how prepayment amounts are worded in the Application and their impact on reducing the FAM balance, which is a regulatory asset.

Section 41
l be less debt in Nova Scotia Power itself. - From an accounting perspective, Nova - Scotia Power will consolidate the limited partnership, but - the credit rating agencies will exclude the billion - dollars of securitization debt when the...

AI summary The discussion focuses on the financial structure and accounting considerations for Nova Scotia Power, including the consolidation of a limited partnership, the exclusion of securitization debt by credit rating agencies, and the establishment of a capital reserve account for credit enhancement purposes.

Section 42
ext slide, so we - have up front financing costs. We also do have some - ongoing financing costs. - Again, some of these would be similar - to what we've seen in other proceedings. So the allotted - fees, this limited partnership will requ...

AI summary The text outlines financing and tax considerations related to a limited partnership structure, including upfront and ongoing financing costs, servicing fees, and income tax implications. These costs include audit fees, rating agency fees, and administrative expenses, with servicing fees calculated as 0.05% of a billion-dollar bond issuance. Income tax is discussed in relation to the return of capital and customer savings.

Section 43
- on the equity component, so there's no income to pay tax - on in the securitization structure. - The last thing I wanted to highlight - here. We don't have any income tax in year one costs, and - so that's because although the limited pa...

AI summary The discussion focuses on the tax implications of a limited partnership structure in the context of a securitization transaction. It explains that while the limited partnership may generate taxable income, Nova Scotia Power intends to shelter this income using existing tax attributes, thereby deferring tax collection until a combined entity basis is applied.

Section 44
the transaction. The bond - is a 30-year mortgage style bond, so very similar to how a - mortgage would work. You pay more interest in the early - years and a lower amount of principal and as your - principal decreases, so does your intere...

AI summary The text discusses a 30-year mortgage-style bond and its impact on the net present value of revenue requirements under different interest rates. It also outlines assumptions about the recovery of deferred depreciation and financing costs if securitization does not proceed, including an annual depreciation expense of $26.8 million.

Section 46
that that - will be in 2028 through adjusted general rates and then - the IESO deferral assumed recovery in 2027, beginning in - 2027 through an IESO rider. - And so looking at all of that and so - comparing the 30-year securitization mort...

AI summary The discussion focuses on the financial implications of securitization, comparing a 30-year securitization mortgage-style bond with a scenario where assets are recovered over a 13-year period. The analysis shows a $265.6 million net present value decrease in customer payments, or an increase in customer benefits, representing a 21% savings.

Section 48
ost benefit from an - NPV and revenue requirements perspective and, as you can - see there, every one of these components, including them, - provides a reduced revenue requirement to customers on a - net present value basis with the inclus...

AI summary The discussion outlines a structure where Nova Scotia Power forms a limited partnership to securitize regulatory assets, issuing bonds and loaning proceeds to Nova Scotia Power. This approach is designed to defer taxes and avoid adverse consequences for customers. Revenue requirements and NPV are considered, with the FAM cost reducing revenue requirements by over $20 million.

Section 49
uld then use that money to pay bondholders. - The other pieces of the cashflow here - INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS relate to the intercompany loan, and so Nova Scotia Power - would pay interest to the limited part...

AI summary The discussion centers on the securitization process, focusing on the allocation of financing and ongoing costs to different components, and the treatment of revenue requirements for thermal assets using existing methodologies, including the 2027 total system coincident load factor and the 3 CP methodology for cost allocation.

Section 53
n't have a slide for it, but - the last item I'll discuss is oh, there's another - question. Rebekah? - MS. POWELL: Thanks, Mike. I have - just a quick question on the last slide because it - connects with Attachment Appendix H, where ELID...

AI summary The discussion centers on the classification of ELID as a below-the-line customer until an approved above-the-line tariff is in place, as well as the approval of securitization riders on an interim basis with potential revisions later. The application includes cost-of-service information and tariff details for future review.

Section 54
e - Application that the rider itself as well the red lines or - black lines for the tariffs. - James? - MR. MacDUFF: Yeah. And just to - follow up on that, Blake, like if there was like, you - know, a change to the amount of securitizatio...

AI summary The discussion revolves around the potential adjustment of a securitization rider based on the Board's approval amount, with considerations on whether the rider should be recalculated or applied as is, and whether true-up adjustments would occur as part of a final decision.

Section 56
- representation of the true-up. - For those of you familiar with the FAM - process, very similar to the FAM process regarding the - components of the true-up, there's instead of calling - it AA and BA, though, we have it called BA-1 and B...

AI summary The discussion revolves around the securitization surcharge and the true-up process, with emphasis on the timing and structure of filings, particularly the November 1st filing. The true-up is compared to the FAM process, with components referred to as BA-1 and BA-2. The conversation also considers the impact of regulatory decisions on rate adjustments.

N-4Proof of Advertisement 4 passages
NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING
NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider...

AI summary Nova Scotia Power Incorporated has applied for approval to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The costs include asset retirement, fuel and purchased power under-recoveries, and deferral account balances. The application is filed under the Public Utilities Act and Financing Orders and Securitized Bonds Regulations.

NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING
NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider...

AI summary Nova Scotia Power Incorporated has applied for approval to securitize $1 billion in costs through a Securitization Cost Recovery Rider, including costs related to thermal generation asset retirement, fuel and purchased power under-recoveries, and deferral accounts. The request is made under the Public Utilities Act and Financing Orders and Securitized Bonds Regulations.

NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING
NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider...

AI summary Nova Scotia Power Incorporated has applied for approval to securitize $1 billion in costs, collected through a Securitization Cost Recovery Rider. The costs include deferred financing costs, fuel and purchased power costs, and deferral account balances, among others.

NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING
NOVA SCOTIA ENERGY BOARD NOTICE OF PUBLIC HEARING Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider...

AI summary Nova Scotia Power Incorporated has applied for approval of a financing order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider. The costs include thermal generation asset retirements, fuel and purchased power costs, and deferral account balances.

103888Hearing Order 2 passages
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS - and - IN THE MATTER OF an application by NOVA SCOTIA POWER INCORPORATED for approval of a financing order authorizing the securitization of $1 billion in costs, coll...

AI summary Nova Scotia Power Incorporated has applied for approval of a financing order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider. The proceeding is before a panel of regulatory members.

HEARING ORDER
HEARING ORDER On October 9, 2026, NS Power filed an application for approval of a financing order authorizing the securitization of $1 billion in costs, collected from customers through a Securitization Cost Recovery Rider. Under s. 35G of...

AI summary NS Power has filed an application for approval of a financing order to securitize $1 billion in costs collected through a Securitization Cost Recovery Rider. The Board has set a paper hearing timetable and requires compliance with the Board's Regulatory Rules, including specific filing deadlines.

103889Notice of Paper Hearing 1 passage
Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider
Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider The Board has received an application from NS Pow...

AI summary Nova Scotia Power Incorporated has applied for approval of a financing order to securitize $1 billion in costs, collected through a Securitization Cost Recovery Rider. The costs include thermal generation asset retirements, fuel and purchased power costs, and deferral accounts.

103960Amended Hearing Order 2 passages
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS - and - IN THE MATTER OF an application by NOVA SCOTIA POWER INCORPORATED for approval of a financing order authorizing the securitization of $1 billion in costs, coll...

AI summary Nova Scotia Power Incorporated has applied for approval of a financing order to securitize $1 billion in costs collected through a Securitization Cost Recovery Rider. The proceeding is before the regulatory board.

AMENDED HEARING ORDER
AMENDED HEARING ORDER On October 9, 2026, NS Power filed an application for approval of a financing order authorizing the securitization of $1 billion in costs, collected from customers through a Securitization Cost Recovery Rider. Under s...

AI summary NS Power filed an application for approval of a financing order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The Board has set a paper hearing process with specific timelines for technical conferences, evidence submissions, and publication of the hearing order.

103854Confidential Undertaking 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act , R.S.N.S. 1989, c.380 as amended - and - IN THE MATTER OF: NS Power's Application for a Securitization Rider and Financing Order

AI summary This document pertains to a regulatory proceeding under the Public Utilities Act, involving NS Power's application for a Securitization Rider and Financing Order.

103859Board letter re: Filing and Confidential undertaking approval 1 passage
Section 1
October 9, 2026 [[email protected]](mailto:[email protected]) Blake Williams VP, Legal and Regulatory Nova Scotia Power Inc. PO Box 910 Halifax, NS B3J 2W5 Dear Mr. Williams: M13133 - Application for Financing Order authori...

AI summary NS Power has applied for a Financing Order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The application is subject to a 60-day review period, with a Technical Conference scheduled for October 15, 2026, and a paper hearing process to follow.

103888Hearing Order 2 passages
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS - and - IN THE MATTER OF an application by NOVA SCOTIA POWER INCORPORATED for approval of a financing order authorizing the securitization of $1 billion in costs, coll...

AI summary This document outlines an application by Nova Scotia Power Incorporated for approval of a financing order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider.

HEARING ORDER
HEARING ORDER On October 9, 2026, NS Power filed an application for approval of a financing order authorizing the securitization of $1 billion in costs, collected from customers through a Securitization Cost Recovery Rider. Under s. 35G of...

AI summary NS Power has filed an application for a financing order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The Board has approved a paper hearing process with specific deadlines for technical conferences, information requests, and submissions. The Public Utilities Act and Board's Regulatory Rules govern the proceeding.

103889Notice of Paper Hearing 1 passage
Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider
Application by Nova Scotia Power Incorporated For Approval of a Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider The Board has received an application from NS Pow...

AI summary Nova Scotia Power Incorporated has applied for approval to securitize $1 billion in costs, including thermal generation asset retirements, fuel and purchased power costs, and deferral accounts, through a Securitization Cost Recovery Rider. The application is under the Public Utilities Act and Financing Orders and Securitized Bonds Regulations.

103890Board letter re: Paper hearing/posting dates / confidential undertaking approved / Technical conference 1 passage
Section 1
October 13, 2026 [[email protected]](mailto:[email protected]) Blake Williams VP, Legal and Regulatory Nova Scotia Power Inc. PO Box 910 Halifax, NS B3J 2W5 Dear Mr. Williams: M13133 - Application for Financing Order author...

AI summary Nova Scotia Power Inc. has applied for a financing order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The Board has issued a Hearing Order and Notice of Paper Hearing, with the application subject to confidentiality requests under Rule 12 of the Board Regulatory Rules. A technical conference is scheduled for October 15, 2026, and the Board will issue its order within 60 days of the application filing.

103895Notice of Intervention - DOE 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act , RSNS 1989, c 380 as amended - and - IN THE MATTER OF: the Financing Orders and Securitized Bonds Regulations - and - IN THE MATTER OF: an application by Nova Scotia Powe...

AI summary This document pertains to an application by Nova Scotia Power Incorporated under the Public Utilities Act and Financing Orders and Securitized Bonds Regulations for the approval of a financing order authorizing the securitization of $1 billion in costs collected through a Securitization Cost Recovery Rider.

103897Notice of Intervention - Eastward Energy 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act, RSNS 1989, c.380, as amended - and - IN THE MATTER OF: NSEB Matter No. M13133 – Nova Scotia Power Inc. – Application for Financing Order authorizing the Securitization of...

AI summary This proceeding involves Nova Scotia Power Inc.'s application for a financing order to securitize $1 billion in costs through a Securitization Cost Recovery Rider, under the Public Utilities Act.

103899Notice of Intervention - SBA 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act - and - IN THE MATTER OF: The Financing Orders and Securitized Bonds Regulations - and - IN THE MATTER OF: An application by Nova Scotia Power Incorporated for approval of...

AI summary This document pertains to a regulatory proceeding involving Nova Scotia Power's application for approval of a financing order to securitize $1 billion in costs collected through a Securitization Cost Recovery Rider under the Public Utilities Act.

103942Letter from IG requesting clarification on Hearing process 3 passages
Delivered by Email
Delivered by Email Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Energy Board 3rd Floor, 1601 Lower Water Street PO Box 1692, Unit M Halifax, NS B3J 3S3 Dear Ms. Henwood: Re: M13133 – Application by Nova Scotia Power Incorpo...

AI summary The Industrial Group seeks clarification from the Nova Scotia Energy Board regarding procedural matters from the Hearing Order and a technical conference related to Nova Scotia Power's application for a financing order authorizing the securitization of $1 billion in costs.

T HE T WO -S TEP P ROCESS
T HE T WO -S TEP P ROCESS In section 10.0 of the Application, p. 37, NSPI requested: [T]hat the Financing Order become effective upon issuance by the Board and the Securitization Rider be approved on an interim basis effective January 1, 2...

AI summary NSPI requests that the Financing Order be effective upon issuance and that the Securitization Rider be approved on an interim basis starting January 1, 2027. The IG seeks clarification on whether the full $1 billion in proposed securitized costs is required and whether all proposed 'buckets' are appropriate for securitization, with some potentially needing exclusion or inclusion.

Scope of Information Requests
Scope of Information Requests The IG also respectfully requests clarification regarding the permissible scope of Information Requests directed to NSPI. In particular, the IG asks whether Information Requests in the first phase must be conf...

AI summary The Intervenor Group (IG) requests clarification on the scope of Information Requests directed to Nova Scotia Power Inc. (NSPI), specifically whether they should be limited to assessing the reasonableness of the proposed Financing Order or if they may also cover cost classification, future re-allocation approaches, and responsibility for securitized costs.

103952Letter from NS Power re hearing process 2 passages
Section 1
October 16, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax NS B3J 3S3 Re: M13133 – Application for Financing Order authorizing the Securitization of $1 billion in costs, collecte...

AI summary NS Power responds to the Industrial Group's request for clarification regarding the approval process for securitization cost buckets in the $1 billion financing application. NS Power clarifies that the breakdown of Securitized Costs must be approved in full, not on an interim basis, with only the allocation of surcharges between customer classes eligible for interim approval.

Section 2
er that may be approved on an interim basis is the "allocation of the securitized surcharges between customer classes" (see sections 4(1)(a)(ii) and 5(1)(h) and (j) of the Securitization Regulations). In relation to the process steps, NS P...

AI summary The text discusses the approval of securitized surcharges between customer classes on an interim basis and notes that NS Power views the process in M11902 as efficient. It also suggests a similar approach may be beneficial in the current context.

103953Letter from CA re: clarification on hearing process 1 passage
Section 1
Please refer to: David Roberts Email: [[email protected]](mailto:[email protected]) Assistant: Heidi Day Assistant's email: [[email protected]](mailto:[email protected]) October 16, 2026 VIA WEB PORTAL & EMAIL Crystal Henwo...

AI summary The Consumer Advocate, represented by David Roberts of Pink Larkin, is seeking clarification from the Nova Scotia Energy Board regarding the two-stage process for NSPI's application to securitize $1 billion in costs. They request confirmation on what matters the Board will address in each phase and whether intervenors can submit evidence in the second phase.

103954Letter from SBA re clarification of hearing process 1 passage
Section 1
October 16, 2026 VIA EMAIL Ms. Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax NS B3J 3S3 Dear Ms. Henwood: Re: M13133 – Application for Financing Order authorizing the Securitization...

AI summary The Small Business Advocate (SBA) supports the Industrial Group's request for further clarification on the procedure for allocating securitized costs to different rate classes. The SBA is concerned about the allocation of costs, particularly those related to the IESO-NS deferral, and suggests allowing a further process for intervenors to provide evidence and submissions.

103956Board letter re: Amended Hearing Order 3 passages
M13133 - Application for Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider
M13133 - Application for Financing Order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider This is further to the Industrial Group's letter dated October 16, 2026, requesting dire...

AI summary The document outlines a proceeding related to an application for a Financing Order authorizing the securitization of $1 billion in costs through a Securitization Cost Recovery Rider. The Industrial Group, Consumer Advocate, and Small Business Advocate have requested procedural clarifications, with NS Power responding to the Industrial Group's letter.

Two-step process
Two-step process The Industrial Group noted NS Power's intent to proceed with this matter in two steps: …first, an initial decision on the Financing Order, with a rider approved on an interim basis effective January 1, 2027 with the initia...

AI summary The Industrial Group has outlined a two-step process for NS Power's matter, with an initial decision on the Financing Order and a subsequent process for final cost-of-service treatment. The group requested clarification on the scope of the proceeding, specifically regarding the $1 billion requirement and the appropriateness of securitization 'buckets'.

Scope of Information Requests
Scope of Information Requests The Industrial Group asked whether Information Requests (IRs) in the first part of this proceeding "must be confined to matters necessary to assess the reasonableness of the proposed Financing Order, i.e., the...

AI summary The Industrial Group inquired about the scope of Information Requests (IRs) in the proceeding, specifically whether they could address cost classification, future re-allocation approaches, and responsibility for securitized costs. The Board indicated that all matters are within scope, but noted that interim allocation issues would be addressed in a second phase, with the interim allocation process needing approval in the Financing Order.

103960Amended Hearing Order 2 passages
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS - and - IN THE MATTER OF an application by NOVA SCOTIA POWER INCORPORATED for approval of a financing order authorizing the securitization of $1 billion in costs, coll...

AI summary Nova Scotia Power Incorporated has applied for approval of a financing order authorizing the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider. The proceeding is before a panel of regulatory members.

AMENDED HEARING ORDER
AMENDED HEARING ORDER On October 9, 2026, NS Power filed an application for approval of a financing order authorizing the securitization of $1 billion in costs, collected from customers through a Securitization Cost Recovery Rider. Under s...

AI summary NS Power has applied for approval of a financing order to securitize $1 billion in costs via a Securitization Cost Recovery Rider. The Board has set a paper hearing with a detailed timetable and will apply its Regulatory Rules, including Rule 7(3), to the proceeding.

104000Notice of Intervention - IESO NS 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utiltities Act -and- IN THE MATTER OF: The Financing Orders and Securitized Bonds Regulations -and- IN THE MATTER OF: an application by Nova Scotia Power Incorporated for approval of a...

AI summary The Nova Scotia Energy Board is considering an application by Nova Scotia Power Incorporated for approval of a financing order that would authorize the securitization of $1 billion in costs collected through a Securitization Cost Recovery Rider.

104024Notice of Intervention - KMKNO & ANSMC 3 passages
Preamble
October 21, 2026 Nova Scotia Energy Board 3rd Floor, Summit Place 1601 Lower Water Street Halifax, Nova Scotia B3J 3P6 ATTENTION: Crystal Henwood, Clerk of the Board Via Email: [email protected] and Via Fax: (902) 424-3919 Dear Panel Mem...

AI summary The document is a notice of intervention in M13133, an application by Nova Scotia Power Inc. for a Financing Order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The intervention is submitted on behalf of the Kwilmu'kw Maw-klusuaqn Negotiation Office and the Assembly of Nova Scotia Mi'kmaw Chiefs.

NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act -and- IN THE MATTER OF: The Financing Orders and Securitized Bonds Regulations -and- IN THE MATTER OF: An application by NOVA SCOTIA POWER INCORPORATED for approval of a f...

AI summary This proceeding involves Nova Scotia Power Incorporated's application for approval of a financing order to securitize $1 billion in costs through a Securitization Cost Recovery Rider, under the Public Utilities Act and Financing Orders and Securitized Bonds Regulations.

NOTICE OF INTERVENTION of KWILMU'KW MAW -KLUSUAQN NEGOTIATION OFFICE and ASSEMBLY OF NOVA SCOTIA MI'KMAW CHIEFS
NOTICE OF INTERVENTION of KWILMU'KW MAW -KLUSUAQN NEGOTIATION OFFICE and ASSEMBLY OF NOVA SCOTIA MI'KMAW CHIEFS TAKE NOTICE that Kwilmu'kw Maw-klusuaqn Negotiation Office (KMKNO) hereby seeks to intervene in the above Application and Proce...

AI summary Kwilmu'kw Maw-klusuaqn Negotiation Office (KMKNO) and the Assembly of Nova Scotia Mi'kmaw Chiefs (ANSMC) are intervening in a proceeding concerning Nova Scotia Power Incorporated's application for a financing order to securitize $1 billion in costs. They express concerns about potential impacts on Mi'kmaw rights, interests, and participation in Nova Scotia's energy system.

104027Notice of Intervention - NS NDP 2 passages
Crystal Henwood
Crystal Henwood Clerk of the Board Nova Scotia Energy Board Box 1692, Unit "M" Halifax, Nova Scotia B3J 3S3 October 21st, 2026 Dear Ms. Henwood, On behalf of Nova Scotia NDP Leader Ms. Claudia Chender, the Nova Scotia NDP caucus are applyi...

AI summary The Nova Scotia NDP caucus, on behalf of Ms. Claudia Chender, is seeking intervenor status in Matter No. M13133, which involves the approval of a financing order for the securitization of $1 billion in costs collected via a Securitization Cost Recovery Rider.

Issues we intend to address:
Issues we intend to address: - The already high and rising energy costs for Nova Scotians. - The valuation of the securitized assets, including whether they should be written down before they are securitized, at shareholder expense. - The...

AI summary The issues addressed include rising energy costs, valuation of securitized assets, potential overinvestment by utilities, allocation of climate policy risks, and the role of the Department of Energy and Governor-in-Council in authorizing the application via Order in Council 2026-349.

104035NSEB (NSPI) IR 1 to 41 28 passages
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS -and- IN THE MATTER OF: AN APPLICATION by NOVA SCOTIA POWER INCORPORATED for approval of a...

AI summary Nova Scotia Power Inc. has applied for a Financing Order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The Nova Scotia Energy Board has issued an information request to Blake Williams, VP, Legal and Regulatory at Nova Scotia Power Inc., seeking responses by October 29, 2026.

- 3 the main impacts of accounting for the transaction as applied for would be:
- 3 the main impacts of accounting for the transaction as applied for would be: Debit Securitization Regulatory Asset $ 1,000,000,000 Credit Thermal assets $ 740,600,000 FAM $ 214,500,000 PHP Deferral $ 12,200,000 IESO Deferral $ 20,200,00...

AI summary The text outlines the financial impacts of accounting for a transaction involving a securitization regulatory asset, thermal assets, FAM, PHP Deferral, IESO Deferral, and financing costs. It includes a detailed breakdown of debits and credits across various accounts, such as Investment in LP, Cash, and Loan Payable to LP, as well as the impact on Old debt and Retained Earnings.

Request IR-2:
Request IR-2: - On pg. 8 of its application, NS Power stated: "While NS Power originally contemplated during the 2026-2027 GRA that the proposed securitization might require two separate bond issuances, angling analysis and discussions wit...

AI summary NS Power's application discusses its revised plan for securitization, indicating that discussions with financial advisors suggest sufficient market interest to support a single bond issuance for the full amount proposed, rather than two separate issuances as initially contemplated.

11 [Emphasis added]
11 [Emphasis added] - a) What ongoing analysis was taking place and how did this analysis inform NS Power's view that market interest is expected to support the full amount requested in the application? - b) What information or advice did...

AI summary The questions focus on NS Power's financing strategy, specifically the rationale for requesting a $1 billion bond issuance, the basis for expecting sufficient market interest, and how this compares to a previous $500 million issuance. The questions also address the legal framework under the Securitization Regulations and the implications of not fully utilizing the requested amount.

25 Request IR-5:
25 Request IR-5: 26 Page 12 of the application presents Figure 12: Unrecovered Net Book Value of the Thermal 27 Assets as of December 31, 2025, and financing. Please provide an updated version of this table 28 using the forecasted values a...

AI summary The document requests an updated version of Figure 12, which shows the unrecovered net book value of thermal assets and financing, using forecasted values as of December 31, 2026, under the assumption that securitization does not occur.

31 Request IR-6:
31 Request IR-6: 32 NS Power proposes to "…securitize $214.5 million of fuel and purchased power costs. This 33 amount consists of $149.6 million in forecast under-recovered fuel and purchased power costs - 1 as at September 30, 2026, alon...

AI summary NS Power proposes to securitize $214.5 million in fuel and purchased power costs, including $149.6 million in under-recovered costs as of September 30, 2026, and a $64.9 million prepayment. Questions are raised about the appropriateness of spreading these costs over 30 years, the benefits to future ratepayers, the final balance of under-recovery, and the rationale for the additional $23.2 million prepayment.

15 Request IR-7:
15 Request IR-7: 14 26 - 16 On pp. 14 and 15 of its application, NS Power proposes that any difference between the forecast 17 balances and actual balances of the PHP Deferral and IESO Deferral be applied as adjustments 18 to the $64.9 mil...

AI summary NS Power proposes adjusting the $64.9 million FAM prepayment based on differences between forecast and actual balances of the PHP and IESO Deferrals, with offsets recorded to the Securitization Regulatory Asset and addressed through the Formula-based True-up Mechanism and Balancing Adjustment mechanism.

27 Request IR-8:
27 Request IR-8: - 28 Section 2.3 of the application addresses the PHP Deferral account. NS Power says the "…PHP 29 Deferral account was approved by the Board during the 2026-2027 GRA to address uncertainty 30 associated with the treatment...

AI summary The document discusses the PHP Deferral account and its approval by the Board during the 2026-2027 GRA. It requests confirmation regarding the forecast amount, the ELID tariff application, and how deviations from GRA assumptions will be handled in Securitized Costs.

8 Request IR-9:
8 Request IR-9: - 9 On pg. 16 of its application, NS Power stated: "As noted in the 2025 DDA Annual Report - 10 proceeding, while expanding the scope of a securitization transaction has the potential to increase - 11 customer benefits, pra...

AI summary NS Power's application mentions practical considerations in expanding a securitization transaction, including transaction size, financing costs, and certainty required by credit rating agencies and bond investors. The request asks for a detailed explanation of these considerations.

23 Request IR-10:
23 Request IR-10: - 24 a) How were the Upfront Financing Costs in Figure 3 of the application and the Ongoing 25 Financing Costs in Figure 4 of the application estimated? Please provide any available 26 back-up documentation. - 27 b) Pleas...

AI summary The request seeks clarification on the estimation of upfront and ongoing financing costs, as well as the rationale for including road show and marketing expenses in the Securitization rather than Operating expenses.

31 Request IR-11:
31 Request IR-11: - 32 a) Are there penalties associated with the early repayment of the ~$600,000,000 of debt that 33 currently funds the assets proposed to be securitized? - 34 b) If so, - 1 i) How much will the penalties be? - 2 ii) Hav...

AI summary The proceeding raises questions about potential penalties for early repayment of a $600 million debt related to securitization, and whether these penalties have been considered in the NPV analysis.

4 Request IR-12:
4 Request IR-12: - 5 On p. 15 of its application, with respect to the inclusion of Fuel and Purchased Power costs, the 6 PHP Deferral and the IESO Deferral in the transaction, NS Power states that "[t]he proposed 7 securitization is consis...

AI summary The document requests an explanation of how the Fuel and Purchased Power costs, PHP Deferral, and IESO Deferral in the current application align with the securitization approach discussed in the 2026-2027 GRA, which focused on the securitization of DDA assets that will become stranded.

1 Request IR-14:
1 Request IR-14: - 2 On p. 17 of its application, NS Power noted that, if not securitized, the September 2026 FAM - 3 balance would need to be collected through the existing FAM process resulting in an increase of - 4 about 7 8%. - 5 a) Wh...

AI summary The document outlines a series of questions regarding the securitization of the Fuel Adjustment Mechanism (FAM) balance by NS Power, including potential rate increases, customer impact, deferral of balances, and comparisons with other jurisdictions. It also asks about the scope of securitization and future rate adjustments.

32 Request IR-15:
32 Request IR-15: 33 With respect to the 0.5 percent or $5 million capital reserve: - 1 a) Page 22 states that this level is customary for utilities undertaking securitization in the 2 United States. Please identify the utilities applying...

AI summary The request IR-15 inquires about the 0.5 percent or $5 million capital reserve, asking for examples of utilities in the U.S. using similar securitization fees, whether this is industry standard, and how NS Power estimated this figure to cover temporary collection shortfalls.

16 Request IR-17:
16 Request IR-17: - 17 On pg. 23 of its application, NS Power states that the "requested Financing Order would include 18 a Formula-based True-up Mechanism to provide for periodic adjustments to the Securitized 19 Surcharge to correct any...

AI summary NS Power's application proposes a Formula-based True-up Mechanism to adjust the Securitized Surcharge periodically. The Board is requesting clarification on the definition of 'periodic adjustments' and whether they occur annually on November 1st or under other circumstances.

16 Request IR-20:
16 Request IR-20: 17 On p. 33 of the application, at lines 9-11, when discussing a Future Reconciliation and Process 18 Proposal, NS Power states there will be a calculation about: 19 (iii) approved deposits to, or withdrawals from, any re...

AI summary The document raises questions about reserve accounts mentioned in NS Power's Future Reconciliation and Process Proposal, specifically regarding their purpose, management, and impact on the Securitized Surcharge.

26 Request IR-21:
26 Request IR-21: 27 Section 9.0 of the application provides a brief summary of future reconciliation process proposed to be filed on November 1st 28 annually. 29 a) Assuming a securitization of $1 billion and other category amounts used f...

AI summary The text discusses a request for a sample spreadsheet or flowchart illustrating the annual reconciliation process for a $1 billion securitization, including how various items will be addressed by NS Power, assuming no change in cost allocation among classes.

Preamble
- 2 a) Has the sale agreement with respect to all of NS Power's right, title and interest in, to and 3 under the Securitized Property discussed in section 11.2 of the application been finalized. - 4 i) If so, please provide a copy.

AI summary The document inquires whether the sale agreement related to NS Power's right, title, and interest in the Securitized Property, as discussed in section 11.2 of the application, has been finalized and requests a copy if it has.

14 Request IR-28:
14 Request IR-28: 15 Section 11.7 of the application discusses the proposed flexibility in bond terms. This section says 16 (in the technical conference at pp. 10-12 of the transcript, NS Power also addressed flexibility): Pursuant to sect...

AI summary NS Power is requesting flexibility in the terms and conditions of Securitized Bonds under Section 3(3)(g) of the Securitization Regulations. It argues that the issuance should proceed as long as it reflects prevailing interest rates and provides quantifiable net present value benefits to customers. The Board is asked whether a threshold for these benefits should be included in the Financing Order and where the 'bookend' for the transaction's justness should be placed.

33 Request IR-29:
33 Request IR-29: - 34 Section 11.8 of the application addresses the requirement of an indemnity agreement from the - 35 Province of Nova Scotia to proceed with securitization. The letter from Deputy Minister Kelliann - 36 Dean dated Octob...

AI summary The document discusses Section 11.8 of an application related to an indemnity agreement from the Province of Nova Scotia for securitization. A letter from Deputy Minister Kelliann Dean dated October 8, 2026, is noted as not a commitment to provide the indemnity. The question asks when NS Power anticipates a definitive answer from the Province.

4 Request IR-30:
4 Request IR-30: - 5 On pg. 44 of its application, NS Power addresses Accounting and Tax Treatment. - 6 a) Does NS Power propose to prepare new accounting policies to address the accounting 7 matters resulting from the securitization trans...

AI summary The document outlines a regulatory request (IR-30) directed at NS Power, asking whether new accounting policies will be prepared to address the accounting and tax treatment of a securitization transaction, and clarifying the consolidation status of the LP and the impact of the securitization on total taxes.

18 Request IR-31:
18 Request IR-31: - 19 Using a $900 million figure as an alternative scenario for a securitized bond issuance (about equal 20 to excluding FAM prepaid balances, the PHP deferral and the IESO deferral): - 21 a) Please provide an NPV calcula...

AI summary The document requests an NPV calculation for a $900 million securitized bond issuance and asks for rate increases by customer class in 2027, including the general rate increase, securitization surcharge, IESO rider, forecasted Demand Side Management rider increase, and other anticipated rate impacts.

28 Request IR-32:
28 Request IR-32: - 29 During the technical conference, NS Power noted that it was unsure if the securitized bond term 30 could be set lower than 30 years and noted it would follow-up. - 31 a) Has NS Power inquired about this potential wit...

AI summary NS Power is uncertain about whether the securitized bond term can be set lower than 30 years and has asked for NPV calculations for 25 and 20-year terms, keeping other assumptions unchanged.

1 Request IR-33:
1 Request IR-33: - 2 On pg. 66 of the technical conference transcript, NS Power stated that rating agencies would omit 3 the securitized bonds in their calculations of credit metrics. - 4 a) Has NS Power confirmed this with credit rating a...

AI summary NS Power claims that credit rating agencies will omit securitized bonds from credit metric calculations. The request asks whether NS Power has confirmed this with the agencies and if there is a risk that the agencies may not omit the bonds.

14 Request IR-35:
14 Request IR-35: - 15 On pdf page 73 of the technical conference transcript, NS Power explained that the forecast 16 interest rate was set based on guidance from its financial advisors. On pdf page 45 of the 17 transcript it was explained...

AI summary The text discusses a regulatory inquiry (Request IR-35) regarding NS Power's interest rate for securitization, including whether financial advisors recommended the rate, if it reflects a ratepayer-backed bond issuance, and if they provided rate ranges for different securitization amounts.

5 Request IR-37:
5 Request IR-37: - 6 Appendix B appears to be missing a worksheet labeled as TABLE that is used to present the 7 values in the cells D123 to F140. - 8 a) Are the range of rates presented in the table in worksheet 'NPV Analysis Securitizati...

AI summary The text refers to a missing worksheet in Appendix B and asks whether the range of rates in a specific table reflects the interest rates recommended by financial advisors for a securitized bond issuance.

18 Request IR-39:
18 Request IR-39: 19 Please provide the total cost of securitization that customers will incur over the 30-year period. 20

AI summary The request seeks the total cost of securitization that customers will incur over a 30-year period, highlighting a focus on financial implications for customers related to securitization.

21 Request IR-40:
21 Request IR-40: - 22 If the securitization of the proposed costs proceeds, does NS Power expect it to have an effect 23 on NS Power's remaining borrowing costs (as new debt is issued)? - 24 a) If so, is NS Power able to provide an estima...

AI summary The text raises a question about whether the securitization of proposed costs will affect NS Power's remaining borrowing costs and whether an estimate of this impact can be provided.

104036Doane Grant Thornton (NSPI) IR 1 to 12 9 passages
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIED BONDS REGULATIONS - and - IN THE MATTER OF: an application filed by NOVA SCOTIA POWER INCORPORATED for approv...

AI summary Nova Scotia Power Incorporated has applied for approval to securitize $1 billion in costs through a Securitization Cost Recovery Rider under the Public Utilities Act and related financing regulations.

Request IR-1:
Request IR-1: - Reference: Sections 2.0-2.4; Figure 1; Appendices A-C; Appendix B, "Balances to Securitize". - Please provide NS Power's existing reconciliation of the approximately $987.5 million - Securitization Regulatory Asset to the m...

AI summary The document requests NS Power to provide a reconciliation of the $987.5 million Securitization Regulatory Asset, including balances from specific accounts, measurement dates, amounts included in securitization, and remaining balances. It also asks for a reconciliation of Fuel and Purchased Power balances, forecast under-recovery, and truing up procedures.

Request IR-2:
Request IR-2: - Reference: Sections 3.2, 5.0 and 12.2; Figures 4 and 5; Appendix B. - Please provide the following: - a) NS Power's existing tax memorandum, calculation, or other supporting analysis for the securitization transaction, incl...

AI summary Request IR-2 asks NS Power to provide detailed tax analysis related to a securitization transaction, including tax treatment, income-tax expense projections, and reconciliation to Appendix B. It also seeks an explanation of the 29% tax rate used and why no income-tax expense is forecasted for 2027 despite offsetting interest revenues and expenses.

Request IR-3:
Request IR-3: - Reference: Sections 2.0 and 3.1; Figure 3; Appendix A, Summary; Appendix B, "Balances to - Securitize". - Please reconcile the references to financing fees. Appendix A and Section 2.0 describe $12.5 - million as 1.25 percen...

AI summary The text requests clarification on discrepancies in financing fees referenced in Appendix A and Section 2.0 of Request IR-3, noting a difference between 1.25% and 1.35% of $1 billion. It asks for confirmation of the correct percentage, explanation of the discrepancy, identification of affected schedules, and whether other financial or accounting conclusions are impacted.

Request IR-4:
Request IR-4: - Reference: Section 9.0, including Figure 9; Section 12.1; Appendix F; Appendices A, B CONF, - C and C Attachment 1 CONF, E and H - Please provide, by securitized-cost component: - a) the forecast-to-actual differences expec...

AI summary Request IR-4 asks for detailed information on securitization cost components, including forecast-to-actual differences, recovery mechanisms, treatment of pre-bond-issuance collections, and reconciliation of calculations to confidential schedules.

Request IR-6:
Request IR-6: - Reference: Section 5.0; Figure 5; Appendix B. - Please provide the NPV of customer benefits by securitized-cost component, including Thermal - Assets, Thermal Asset Financing Cost Deferral, PHP Deferral, IESO-NS Deferral an...

AI summary Request IR-6 asks for the NPV of customer benefits by securitized-cost component, including Thermal Assets, Thermal Asset Financing Cost Deferral, PHP Deferral, IESO-NS Deferral, and Fuel and Purchased Power, reconciling to the $265.6 million total NPV benefit in Appendix B.

Request IR-8:
Request IR-8: - Reference: Sections 11.0 and 12.1; Figures 10-11; Appendix A - Please provide NS Power's existing accounting memorandum or other supporting analysis for the - proposed securitization transaction, including the applicable ac...

AI summary Request IR-8 asks NS Power to provide an accounting memorandum and supporting analysis for a proposed securitization transaction, covering recognition, reclassification, financing costs, asset transfers, consolidation, balance-sheet presentation, and illustrative journal entries.

Request IR-10:
Request IR-10: - Reference: Section 9.0, including Figure 9; Section 12.1; Appendix F - Please explain: - a) how Securitized Surcharge collections received before bond issuance will be reflected in the first balancing adjustment; - b) the...

AI summary Request IR-10 seeks clarification on securitization processes, including how surcharge collections are reflected in balancing adjustments, handling forecast-to-actual differences, controls to prevent duplicate recovery, and an illustrative calculation using Appendix F formulas.

Request IR-11:
Request IR-11: - Reference: N/A - Would there be any debt associated with any of the Securitized Property that would be assumed - by the partnership?

AI summary The text raises a question about whether any debt associated with the Securitized Property would be assumed by the partnership in the context of Request IR-11.

104037Notice of Intervention - CA 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: the PUBLIC UTILITIES ACT - and - IN THE MATTER OF: the FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS - and - IN THE MATTER OF: an application by NOVA SCOTIA POWER INCORPORATED for approval of...

AI summary Nova Scotia Power Inc. is seeking approval from the Nova Scotia Energy Board to securitize $1 billion in costs through a Securitization Cost Recovery Rider under the Public Utilities Act and Financing Orders and Securitized Bonds Regulations.

104038CA (NSPI) IR 1 to 6 8 passages
1 M13133
1 M13133 2 3 NOVA SCOTIA ENERGY BOARD 4 5 6 7 IN THE MATTER OF: the PUBLIC UTILITIES ACT 8 9 - and - 10 11 12 IN THE MATTER OF: the FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS 13 14 - and - 15 16 17 18 19 20 IN THE MATTER OF: an app...

AI summary The Nova Scotia Energy Board is handling a matter related to the Public Utilities Act and the Financing Orders and Securitization Bonds Regulations. Nova Scotia Power Inc. has applied for approval to securitize $1 billion in costs collected through a Securitization Cost Recovery Rider. The Consumer Advocate has sent information requests to Blake Williams of Nova Scotia Power Inc., with responses due by October 29, 2026.

Preamble
As noted in NSPI's Application: At the time of the 2026-2027 GRA, NS Power proposed to securitize a forecast amount of $704 million of the unrecovered net book value of thermal assets within the scope of the DDA ($500 million in 2025 and $...

AI summary NS Power proposes to securitize $1 billion of thermal asset liabilities, expecting $265.6 million in customer savings over 30 years. This change from the original $704 million proposal is due to ongoing analysis and discussions with financial advisors, suggesting a single bond issuance is feasible. Questions are raised about the NPV calculation and the pros and cons of single versus multiple bond issuances.

Request IR-2:
Request IR-2: NSPI states: NS Power's Q3 Forecast includes a forecast Fuel Adjustment Mechanism (FAM) under- recovery of $41.7 million, before interest, in Q4 2026 and 2027. The $64.9 million FAM prepayment consists of this forecast under-...

AI summary NSPI proposes a $23.2 million additional FAM prepayment to be securitized over 30 years, aiming to moderate fuel rate impacts in 2028 and manage transitional energy costs. This approach seeks to distribute costs across current and future customers and align with long-term energy transition goals.

NPSI provides the following summary of securitization analysis (N-1, page 25 of 51):
NPSI provides the following summary of securitization analysis (N-1, page 25 of 51): Traditional Recovery Securitization Eligible Costs 1,040,567,763 1,000,000,000 Recovery Period 13 Years (2027 - 2039) 30 years (2027-2056) Cost of Financi...

AI summary NPSI provides a comparison between traditional recovery and securitization, highlighting differences in eligible costs, recovery periods, financing costs, and customer savings. The eligible costs for traditional recovery are higher than those for securitization, and the analysis shows potential savings of 21% with securitization.

Request IR-4:
Request IR-4: Appendix D and Appendix E to the Application show proposed rate schedules with securitization rider and proof of revenue for 2026 and 2027 by customer class. The proposed securitization riders by customer class are also provi...

AI summary Appendix D and E of the Application present proposed rate schedules with securitization riders and proof of revenue for 2026 and 2027 by customer class. Figure 6 also outlines the proposed securitization riders.

Increases in Customer Class Revenues in 2027
Increases in Customer Class Revenues in 2027 Securitization Rider Customer Class Thermal Assets (%) Fuel & Purchased Power (%) PHP Deferral (%) IESO NS Deferral (%) Total Securitization Rider (%) Domestic Service 2.4 0.4 0.0 0.1 2.9 Small...

AI summary The document presents a table showing the distribution of the Securitization Rider across various customer classes in 2027, including percentages for Thermal Assets, Fuel & Purchased Power, PHP Deferral, IESO NS Deferral, and the total Securitization Rider. The table also includes specific values for different customer classes and a request to explain the Fuel and Purchased Power credit to BUTU and the associated amount.

Request IR-5:
Request IR-5: Section 2.3 PHP Deferral proposes that $12.2 million as of December 31, 2026 is proposed for securitization made up of the actual deferral account balance as at August 30, 2026; the forecast deferrals from September 1, 2026 t...

AI summary Request IR-5 seeks clarification on NSPI's proposal to securitize a PHP deferral balance, including the timing of the deferral balance reference, the interest portion, and the justification for securitizing accrued interest under the Public Utilities Act.

Request IR-6:
Request IR-6: Section 2.4 IESO Deferral states that $20.2 million as of December 31, 2026 is proposed for securitization made up of the actual deferral account balance as at August 30, 2026; the forecast deferrals from September 1, 2026 th...

AI summary The document requests clarification on the proposed securitization of $20.2 million as of December 31, 2026, including the reference date for the deferral account balance and the treatment of accrued interest under the Public Utilities Act.

104039SBA (NSPI) IR 1 to 12 8 passages
1 M13133 p. p. 5
1 M13133 2 3 NOVA SCOTIA ENERGY BOARD 4 5 6 IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380, as amended 7 8 9 IN THE MATTER OF: An Application by Nova Scotia Power Inc. for approval of a financing order authorizing the sec...

AI summary The Nova Scotia Energy Board is handling an application by Nova Scotia Power Inc. for approval of a financing order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. The Small Business Advocate has been requested to provide responses by October 29, 2026.

Preamble p. p. 5
Please refer to M13133, Exhibit N-1, NS Power Application for a Financing Order to Reduce Costs for Customers (the "Application") Figure 1: Summary of Securitized Costs ($ million), Page 10 of 51, Line 17: a) When does NS Power anticipate...

AI summary The text includes a series of questions related to NS Power's upcoming filings, the reset of the Base Cost of Fuel (BCF) for 2028, the impact of limited approval of securitized costs, and the reclassification of Thermal Assets following Board approval of the Application.

Request IR-3: p. p. 5
Request IR-3: Refer to Exhibit N-1 the Application, Section 3.1, Figure 3 Estimate of Upfront Financing Costs, page 20 of 51, line 13, which includes $825,000 for Rating Agency Fees, and Figure 4. Estimate of Ongoing Financing Costs, page...

AI summary The document requests explanations regarding financing costs related to securitization, including the calculation of cost reductions, the breakdown of rating agency fees, the services provided for these fees, regulatory limits on such fees, the selection of financial advisors, and whether other Canadian utilities have incurred similar fees.

Request IR-5: p. p. 5
Request IR-5: Refer to Exhibit N-1, the Application, Section 5.0 Net Present Value Comparison, page. 24 of 51, lines 11-14, which states: The Company's financial advisor for the transaction has recommended against publicly disclosing the b...

AI summary The Company's financial advisor has recommended against disclosing the base case financing rate for Securitized Bonds due to concerns that it may influence market pricing expectations and prejudice the rate achieved at issuance.

Request IR-8: p. p. 5
Request IR-8: Refer to N-1, the Application, Section 10.0 Effective Date and Termination, page. 37 of 51, lines 10-24, which states: Once the final terms of the Securitized Bonds have been established, NS Power will file an issuance advice...

AI summary The text outlines provisions related to the Securitized Bonds and Financing Order under the Securitization Regulations, including the conditions for their issuance, irrevocability, and termination. It also raises questions about the use of the term 'defeased,' potential refinancing or transfer of bonds, the impact of the Indemnity Agreement on bond transfers, and the sharing of bond terms with stakeholders.

Request IR-9: p. p. 5
Request IR-9: Please refer to Exhibit N-1, the Application, Section 2.4 IESO Deferral, page. 15 of 51, lines 3-9, which sets out the proposed deferral of the IESO-NS account, including the actual deferral amount up to Augst 20, 2026 and th...

AI summary The document refers to Exhibit N-1 and requests clarification on the deferral of the IESO-NS account, including the actual and forecasted deferral amounts. It also asks how cost overruns from the 2025/2026 period, which have been securitized, will be addressed, and what happens if the approved 2026/2027 revenue requirement is less than the securitized amount, depending on the timing of the decision.

Request IR-10: p. p. 5
Request IR-10: As part of IESO-NS's 2027/2028 Fee Recovery Mechanism Application (M13007), IESO-NS is proposing for IESO-NS' collection 2025/2026 and 2026/2027 Fees (including the $950,000/month paid by NS Power from February to November 2...

AI summary IESO-NS is proposing to collect fees for the 2025/2026 and 2026/2027 periods from load serving entities, including NS Power. Questions are raised about securitization, cost allocation, adjustments due to load changes, and potential interest and financing costs if fees are later deemed not owed.

Request IR-12: p. p. 5
Request IR-12: a) Please refer to Exhibit N-1, the Application, Page 22 of 51, Lines 12-13 and confirm that the statement "In future GRAs, NS Power will include a revenue credit of the servicing fees that NS Power collects as a servicer of...

AI summary The request seeks clarification on whether NS Power will reduce future revenue requirement applications by $500,000 annually while securitization bonds are in place, based on a statement in Exhibit N-1 of the Application.

104044Notice of Intervention - Renewall 1 passage
Nova Scotia Utility and Review Board
Nova Scotia Utility and Review Board IN THE MATTER OF: The Public Utilities Act IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS IN THE MATTER OF: An application by NOVA SCOTIA POWER INCORPORATED for approval of a f...

AI summary Nova Scotia Power Incorporated has applied for approval of a financing order that would authorize the securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider.

104046Renewall (NSPI) IR 1 to 7 6 passages
Preamble
1 2026 2 3 4 IN THE MATTER OF: 5 6 IN THE MATTER OF: 7 8 IN THE MATTER OF: 9 10 11 12 13 To: From: Responses Due: Contact Person NOVA SCOTIA ENERGY BOARD The Public Utilities Act - and - M13133 The Financing Orders and Securitized Bonds Re...

AI summary The document outlines an information request regarding the failure to recover an outstanding forecast under-recovered FAM balance from September 2025 in 2026, as per the FAM Plan of Administration (POA), and its impact on the proposed $149.6 million securitization balance and accrued interest by customer class.

6 Reference: Exhibit N-1, Section 2.2, pp. 12-13.
6 Reference: Exhibit N-1, Section 2.2, pp. 12-13. - 7 (a) Please explain and confirm whether forecast future fuel and purchased 8 power costs that have not yet been paid or incurred by NSPI (including the $23.2 million additional buffer pr...

AI summary The text requests clarification on whether forecast future fuel and purchased power costs, including a buffer prepayment and potential fuel shortfall, qualify as 'Unrecovered Fuel Costs' under the Financing Orders and Securitized Bonds Regulations, and whether such costs can be securitized. It also asks for examples of similar approvals in other jurisdictions.

4 Reference: Exhibit N-1, Section 5.0, pp. 24-25; and Confidential Appendix B.
4 Reference: Exhibit N-1, Section 5.0, pp. 24-25; and Confidential Appendix B. - (a) Please provide a revised version of Appendix B (Confidential), that removes 2027 and future fuel costs from both the traditional recovery and securitizati...

AI summary The text requests a revised version of Appendix B that excludes 2027 and future fuel costs from securitization scenarios and asks whether removing these amounts would affect the requested bond issuance and financing costs.

17 Reference: Exhibit N-1, Appendix F, Securitization Cost Recovery Rider (SECRR); and 18 Appendix G-1, Distribution Tariff, Section 11.2
17 Reference: Exhibit N-1, Appendix F, Securitization Cost Recovery Rider (SECRR); and 18 Appendix G-1, Distribution Tariff, Section 11.2 - (a) Please explain how the SECRR will be billed to and collected from RtR Customers or Licensed Ret...

AI summary The document requests clarification on how the Securitization Cost Recovery Rider (SECRR) will be billed and collected from customers or licensed retail suppliers, and whether it will be included in 'DT Charges' under the Distribution Tariff. It also asks about necessary amendments to agreements and billing systems, along with associated costs and timelines.

29 Request IR-6:
29 Request IR-6: - 1 2 3 4 (a) Please explain whether and how NSPI has considered the requirements and policy objectives of the More Access to Energy Act, including its purpose of encouraging competition in the Nova Scotia electricity mark...

AI summary The request asks NSPI to explain how it considered the More Access to Energy Act's objectives, particularly competition in the electricity market, in its proposal to securitize future fuel costs. It also inquires about the impact of securitization on customers switching to Licensed Retail Suppliers under the RtR program and whether this approach aligns with or hinders competition.

17 Request IR-7:
17 Request IR-7: 13 14 22 23 24 30 31 - (a) Please confirm whether the costs associated with RTR Implementation Costs (Cl C0053699) would constitute an "Unrecovered Regulatory Asset" as defined in s. 1 of the Financing Orders and Securitiz...

AI summary The text requests clarification on whether RTR Implementation Costs qualify as an Unrecovered Regulatory Asset under the Financing Orders and Securitized Bonds Regulations, and if so, how much of these costs could be included in a securitization financing package for recovery from RTR market participants.

104047BW (NSPI) IR 1 to 20 11 passages
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS -and- IN THE MATTER OF: AN APPLICATION by NOVA SCOTIA POWER INCORPORATED for approval of a...

AI summary The Nova Scotia Energy Board is considering an application by Nova Scotia Power Incorporated for approval of a Financing Order to securitize $1 billion in costs through a Securitization Cost Recovery Rider, under the Public Utilities Act and related regulations.

Request IR-1:
Request IR-1: - Please provide "PARTIALLY CONFIDENTIAL 2026 Securitization Rider Application - Appendix C Attachment 2," found at PDF pages 69 to 76 of the Application, in electronic, - Excel format with all formulas intact.

AI summary The request is for a partially confidential 2026 Securitization Rider Application, specifically Appendix C Attachment 2, which is located on PDF pages 69 to 76 of the Application and needs to be provided in electronic Excel format with all formulas intact.

Request IR-2:
Request IR-2: - Preamble: - Some data in "2026 Securitization Rider Application Appendix C Att 01 CONF EO.xlsx", - on worksheet "Schedule 7 AA by Class" appears to be mis-aligned in worksheet rows - 83/84 (table rows 65/66) between Column...

AI summary The document highlights an issue with the alignment of data in the '2026 Securitization Rider Application Appendix C Att 01 CONF EO.xlsx' file, specifically in the 'Schedule 7 AA by Class' worksheet. Rows 65/66 show a current interest line with all zeros in columns A through N, but the line disappears from column O onwards. A corrected version of the file is requested.

Request IR-4:
Request IR-4: - References: - A. Securitization Eligible Costs: - i. "2026 Securitization Rider Application Appendix A EO.xlsx", "Summary" - worksheet, Cells F8 to F10, Fuel and Purchased Power Eligible Costs - B. The following values for...

AI summary The document outlines references to various Excel worksheets and cells containing data related to securitization eligible costs, specifically focusing on fuel and purchased power costs for December 2026 and a value for December 2027 from a 2026 Securitization Rider Application.

Request:
Request: - a) Please confirm that the value of the "COS Adjustment" found on "2026 Securitization Rider Application Appendix A EO.xlsx," "Schedule 7 – AA by Class" worksheet, Cell HL74 (hard-coded value) reflects the sum of eligible costs...

AI summary The request seeks confirmation and explanation regarding the 'COS Adjustment' values in specific worksheets of the 2026 Securitization Rider Application, focusing on whether these values accurately reflect the sum of eligible costs for securitization related to Fuel and Purchased Power, and the differences between them.

Request:
Request: a) Please confirm if the values shown on the "Summary" worksheet of "2026 Securitization Rider Application Appendix A EO.xlsx" are fixed or if they will change. If values are expected to change, please provide an overview of what...

AI summary The text requests confirmation on the fixed nature of values in a securitization rider application, potential changes to costs, and the role of specific prepayment amounts in adjusting the total securitization issuance value. It references multiple applications and regulatory matters, including the ELID tariff and AAR application.

Request IR-12:
Request IR-12: - Reference: N-1, page 13 lines 11-13. - a. Please explain the meaning of the phrase "a more efficient execution of the Securitized Bond issuance in the capital markets." - b. Please provide any evidence that supports NS Pow...

AI summary Request IR-12 seeks clarification on the securitization of unrecovered fuel costs through a $1 billion bond issuance, including the efficiency of the process, evidence supporting customer savings and risk reduction, and the rationale for not proposing a higher bond amount.

Request IR-13:
Request IR-13: - Reference: N-1, page 13 lines 11-13. - a. Please explain the meaning of the phrase "a more efficient execution of the Securitized - Bond issuance in the capital markets." - b. Please provide any evidence that supports NS P...

AI summary Request IR-13 asks NS Power to explain the meaning of 'a more efficient execution of the Securitized Bond issuance in the capital markets,' and to provide evidence supporting claims that a $1 billion bond issuance will lead to increased customer savings and reduced transactional risk.

Request IR-14:
Request IR-14: - Reference: N-1, Figure 5. - a. Please confirm that the "Cost of Financing" under the "Securitization" scenario is an - estimate that is subject to risk of change once NS Power pursues the Securitized Bond - issuance. If no...

AI summary The request IR-14 asks NS Power to clarify the estimated 'Cost of Financing' under the Securitization scenario, how they would address discrepancies, if there is a maximum cost they would accept, and whether they have proposed risk mitigation measures for the Securitized Bond issuance.

Request IR-15:
Request IR-15: - Reference: N-1, Section 9.0 and page 33 lines 7-11. - a. Please confirm that the actual, final "(i) scheduled principal and interest payments on the Securitized Bonds" is not currently known and will remain uncertain and s...

AI summary The text requests confirmation and clarification regarding the uncertainty of scheduled principal and interest payments on Securitized Bonds and Ongoing Financing Costs, as well as the Board's ability to review these values before they are included in customer rates. It also inquires about proposed guardrails to manage associated risks.

Request IR-19:
Request IR-19: - Reference: N-1, Section 7.0. - a. Under NS Power's proposal in the Application, will PHP pay its portion of the Securitization - Rider on its actual load, or its net load (net of generation from Goose Harbour wind farm)? -...

AI summary The text asks NS Power to clarify whether PHP will pay its portion of the Securitization Rider based on actual load or net load, and requests an explanation, including references to current or past matters before the Board.

104048IG (NSPI) IR 1 to 34 25 passages
Section 2
- 8 (b) Please provide a version of Appendix D with this alternative securitization 9 scenario. - 10 (c) Please explain and quantify any financial or capital-market implications of 11 issuing approximately $750 million rather than $1 billi...

AI summary The text requests detailed financial and market analysis regarding the issuance of securitized bonds, including implications of varying issuance sizes, investor demand, credit ratings, interest rates, and cost comparisons between different scenarios.

Preamble
- 2 Reference: N-1, Application, Appendix H, '2027 Securitization Rider Therm' tab, cells D4 - 3 F4 & N-92, SR-01 Attachment 3, page 7 of 102 & Exhibit N-92 from M12451, SR-01 - 4 Attachment 3, page 7 of 102. - 5 Preamble: The System Load...

AI summary The document requests an explanation and reconciliation of changes in the system load factor and demand/energy classification between the 2026/27 GRA Compliance Filing and the current Application. It also asks about the impact of securitization of thermal assets on these calculations and requests revised appendices in Excel format using the updated load factor.

17 Request IR-7:
17 Request IR-7: 18 Reference: N-1, Application, page 17, lines 20-23 Furthermore, if the Unrecovered Fuel Costs are not securitized, they will need to be collected through the existing FAM process, which, for only those costs up to the en...

AI summary The text discusses the potential impact of not securitizing Unrecovered Fuel Costs, which could lead to significant rate increases of 7 to 8% for customers in 2027 if recovered through the existing FAM process. The request asks for workpapers and a breakdown of rate increases by customer class, as well as recovery proposals if the Financing Order is not approved.

14 Request IR-8:
14 Request IR-8: 15 Reference: N-1, Application, page 13, lines 8-16 and lines 22-28. "NS Power's Q3 Forecast includes a forecast Fuel Adjustment Mechanism (FAM) under-recovery of $41.7 million, before interest, in Q4 2026 and 2027. The $6...

AI summary The document raises questions about Nova Scotia Power Inc.'s (NSPI) justification for an additional $23.2 million prepayment under the Fuel Adjustment Mechanism (FAM), its basis for determining the size of the buffer, and whether the amount was influenced by the desire to reach a $1 billion securitization issuance. It also requests details on the financial benefits of the round-number issuance and the role of financial advisors.

24 Request IR-9:
24 Request IR-9: 25 Reference: N-1, Application, page 13, line 17. "The inclusion of the additional $23.2 million prepayment…provides a buffer against fuel cost volatility…The application of this additional balance to the FAM will assist i...

AI summary The text discusses a request for clarification regarding NSPI's use of a $23.2 million prepayment as a buffer against fuel cost volatility, asking about its impact on customers, financial benefits, and its role in reconciling forecast-to-actual variances from multiple sources.

17 Request IR-10:
17 Request IR-10: - 18 Reference: N-1, Appendix C, Figure 3 (pg. 6) and Figure 5 (pg. 8) - 19 Preamble: Figures 3 and 5 show that no collections through AA riders have occurred 20 to FAM balances for 2026 (January to September). - 21 (a) P...

AI summary The request asks for an explanation of the basis for deferring recovery and the applicable Board approval, as well as a breakdown by customer class of the effect on securitization balances for 2026, including deferred collections and additional interest.

13 Request IR-12:
13 Request IR-12: - 14 For the proposed recovery of the $149.6 million under-recovered fuel balance, allocated using 15 customer classes' shares of balances as of September 30, 2026, please explain how the closure 16 of a large industrial...

AI summary The text contains several requests for clarification regarding fuel balance recovery and an Excel attachment explanation. It asks how changes in large industrial customers would affect fuel balance recovery and seeks an instructional explanation of an Excel file related to AA/BA balances and securitization rider fuel.

14 Request IR-15:
14 Request IR-15: 15 Reference: N-1, Application, page 14, lines 9-13; and Appendix A, tab "2 - PHP Deferral." "The balance of the Port Hawkesbury Paper (PHP) Deferral account, forecast to be $12.2 million as of December 31, 2026, is propo...

AI summary The document discusses the proposed securitization of the Port Hawkesbury Paper (PHP) Deferral account, which is forecast to be $12.2 million as of December 31, 2026. It also requests clarification on why the 'Fuel' variance, totaling $3.6 million, is excluded from the deferral and securitization process, while interest is applied only to the 'Non-fuel' variance.

14 Request IR-17:
14 Request IR-17: 15 Reference: N-1, Application, page 14, lines 21-25. "[A]ny difference between the forecast balance of $12.2 million and the actual PHP Deferral account balance at December 31, 2026 be applied as an adjustment to the $64...

AI summary The text discusses the adjustment of the Fuel Adjustment Mechanism (FAM) prepayment based on the forecast and actual balance of the PHP Deferral account by December 31, 2026. It requests an explanation of how discrepancies would be applied through the Balancing Adjustment (BA) mechanism, including customer class impacts and timing, and why the adjustment is applied to the FAM prepayment rather than the PHP Deferral account itself.

8 Request IR-18:
8 Request IR-18: - 9 Reference: N-1, Application, page 31, Figure 7: Securitization Rider for Below the Line 10 (BTL) customer class in 2027. - 11 Preamble: Figure 7, lists the Extra Large Industrial Dispatchable ("ELID") rate class as 12...

AI summary The text requests an explanation of why the ELID rate class is classified as Below-the-Line for the 2027 Securitization Rider, why it lacks a Fuel & Purchased Power rider despite future costs, and why certain costs should not be charged to the ELID class if incurred while it is taking service.

2 Reference: Matter M12661, ELID Application
2 Reference: Matter M12661, ELID Application - 3 (a) Please confirm whether any of the matters in dispute in the ELID 4 application affect, or are expected to affect, the amount of the PHP Deferral 5 balance, the $12.2 million forecast bal...

AI summary The document contains questions related to the ELID application, specifically concerning the impact of disputed matters on deferred balances, the calculation of securitization balances, the basis for recovery of deferred costs, and a request for NPV analysis of different recovery timelines.

21 Request IR-20:
21 Request IR-20: - 22 Reference: N-1, Application, page 15, lines 3-8; and Appendix A, tab "3 NSIESO - 23 Deferral." "The balance of the Nova Scotia Independent Energy System Operator (IESO-NS) Deferral account, forecast to be approximate...

AI summary The document discusses the proposed securitization of a $20.2 million IESO-NS Deferral account balance, including questions about the impact of a potential Board determination, the breakdown of the deferral balance by month, consideration of under-spend from 2025-2026, and the rationale for requiring ratepayers to pay accrued interest at 6.59%.

21 REASONS FOR INCLUSION AS SECURITIZED COSTS
21 REASONS FOR INCLUSION AS SECURITIZED COSTS - 22 Request IR-21: - 23 Reference: N-1, Application, Section 2.5, pages 15 18; - 24 Preamble: NSPI discusses its rationale for including the proposed costs in the 25 securitization transaction...

AI summary Nova Scotia Power Inc. (NSPI) outlines 21 reasons for including certain costs in a securitization transaction, emphasizing lower financing costs, intergenerational cost sharing, rate stability, and support for the Province's energy transition. The request references sections of an application and asks for an explanation of relevant utility rate-setting principles, including Bonbright's principles and cost causation.

1 intergenerational equity, the matching of costs and benefits, and the used
1 intergenerational equity, the matching of costs and benefits, and the used 2 and useful principle. 3 (b) For each component of the proposed securitization (thermal assets and 4 associated financing costs, under-recovered fuel and purchas...

AI summary The text requests an explanation of how the proposed securitization and 30-year recovery period align with principles of intergenerational equity, cost-benefit matching, and the nature of costs, benefits, and responsible customers for various components of the securitization.

10 Request IR-22:
10 Request IR-22: - 11 Reference: N-1, Application, Section 6.4, page 28, lines 7-10; and M13007, IESO-NS (IG) - 12 IR-1, Attachment 1 (Illustrative NS Power Bill Impact Model). "The total 2027 revenue requirement associated with the secur...

AI summary The document discusses the allocation methodology for the IESO-NS Deferral securitization revenue requirement, referencing the illustrative NS Power Bill Impact Model. It requests NSPI to confirm agreement with the fee recovery calculation and clarify IESO-NS's current responsibilities.

12 Reference: N-1 Application, page 21, Figure 4 and page 22, lines 4-13
12 Reference: N-1 Application, page 21, Figure 4 and page 22, lines 4-13 "NS Power proposes an annual servicing fee of 0.05 percent of the initial principal amount of the Securitized Bonds to cover costs and expenses in servicing the Secur...

AI summary NS Power proposes a 0.05% annual servicing fee on Securitized Bonds to cover costs of servicing, which includes billing and collecting the Securitized Surcharge. The Board is asked to confirm if these functions overlap with current activities, whether the fee is justified, and how it will be accounted for in future GRAs.

1 NET PRESENT VALUE
1 NET PRESENT VALUE - 2 Request IR-26: - 3 Reference: N-1, Application, Section 5.0, page 25, Figure 5. - 4 Preamble: Figure 5 shows Eligible Costs of $1,040,567,763 under "Traditional - 5 Recovery" and $1,000,000,000 under "Securitization...

AI summary The text requests clarification on the Net Present Value (NPV) of customer benefits in a rate proceeding, specifically regarding the inclusion of financing costs for a FAM prepayment, recovery periods for different cost components, and the breakdown of NPV attributable to each component.

7 Reference: N-1, Confidential Appendix B (Net Present Value Calculations).
7 Reference: N-1, Confidential Appendix B (Net Present Value Calculations). - 8 (a) Please provide, in Excel format, a version of Appendix B, for with and 9 without securitization benefits, that splits the NPV customer savings 10 benefits...

AI summary The text requests detailed explanations and modifications to Appendix B of a regulatory proceeding, focusing on securitization benefits, recovery periods, income tax assumptions, and cost deferrals. It asks for Excel versions of the appendix with and without securitization benefits, different recovery periods, and explanations of tax-related assumptions.

2 Request IR-28:
2 Request IR-28: - 3 (a) Absent securitization, please identify the recovery period NSPI would 4 expect to seek for each of: (i) the thermal asset balance; (ii) existing 5 unrecovered fuel and purchased power costs; (iii) forecast fuel and...

AI summary The request asks NSPI to identify recovery periods for various cost components, explain how these periods were determined, and provide financial impacts. It also asks for quantification of credit metric effects and supporting materials for credit-rating benefits from proposed securitization.

20 Reference: N-1, Confidential Appendix B, "NPV Analysis - Securitization" tab, NPV 21 Sensitivity & Section 5.0, pages 24–25
20 Reference: N-1, Confidential Appendix B, "NPV Analysis - Securitization" tab, NPV 21 Sensitivity & Section 5.0, pages 24–25 - 22 (a) Please provide the resulting annual revenue requirements and customer-23 class Securitization Riders (i...

AI summary The text requests detailed information on the financial implications of securitization under different bond interest rates and repayment periods. It specifically asks for revenue requirements, customer-class rider impacts, and NPV customer savings under various scenarios, including 6.50% and 7.00% interest rates, and repayment periods of 20 and 25 years.

7 Request IR-30:
7 Request IR-30: - 8 Reference: N-1, Application, page 14, lines 21-25 (PHP Deferral); page 15, lines 17-21 - 9 (IESO-NS Deferral); page 20, lines 15-21 (Upfront Financing Costs); page 26, lines 3-6 - 10 (Financing Costs allocation); page...

AI summary The document discusses the allocation methodologies for various deferrals and financing costs, including PHP Deferral, IESO-NS Deferral, and Upfront Financing Costs, and their application to the FAM prepayment. It requests confirmation that the described allocation methods are accurate.

11 Request IR-31:
11 Request IR-31: - 12 Reference: N-1, Application, page 29; Appendix D, tab "2027 With Securitization"; - 13 Appendix H. - 14 "Securitization Rider (¢/kWh) = [Revenue Requirement / Forecast Sales] x 15 100." - 16 Appendix H (tabs "2027 Se...

AI summary The text requests confirmation and reconciliation of the 2027 Securitization Rider calculations for Large Industrial and Medium Industrial rate classes, referencing specific appendices and figures for verification.

1 FUTURE RECONCILIATION PROPOSAL
1 FUTURE RECONCILIATION PROPOSAL - 2 Request IR-32: - 3 Reference: N-1, Application, Section 9.0, page 33. Preamble: NSPI proposes a Formula-based True-up Mechanism and notes it will annually calculate the required Securitized Surcharge re...

AI summary NSPI proposes a Formula-based True-up Mechanism to annually calculate the required Securitized Surcharge revenue based on forecast financing costs, reserve account activity, and earnings. The mechanism includes provisions for reviewing adjustments and addressing scenarios where fuel costs are lower than forecast, as well as handling potential reductions in IESO Deferral balance costs.

8 Request IR-33:
8 Request IR-33: 9 Reference: N-1, Application, page 36, Section 9.0. "BA1(t) = Approved Securitized Surcharge (t-1) - Actual Securitized Surcharge Collections (t-1) ± Other Reconciliation Amounts" and "BA2(t) = Approved BA1 (t-1) - Actual...

AI summary The text outlines a regulatory inquiry (Request IR-33) regarding the Balancing Adjustment (BA) formulas and mechanisms, including their application on a customer-class basis, interest treatment, handling of customer changes, and responsibility for Securitized Costs after departure from the NSPI system.

7 Request IR-34:
7 Request IR-34: - 8 Reference: M12451 Board GRA Decision, March 25, 2026, paragraphs 157–189 and 268– - 9 269. - 10 Preamble: The Board's 2026–2027 GRA decision identifies substantial uncertainty - 11 concerning hydroelectric refurbishmen...

AI summary The request IR-34 asks NSPI to provide forecasts of hydro-related expenditures from 2027–2031, assess the use of securitization for financing these costs, and compare securitization with an alternative that prioritizes hydro-related costs over other balances.

104049Notice of Intervention - PHP 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act – and – IN THE MATTER OF: The Financing Orders and Securitized Bonds Regulations – and – IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for approval of...

AI summary This document outlines an application by Nova Scotia Power Incorporated to the Nova Scotia Energy Board under the Public Utilities Act and Financing Orders and Securitized Bonds Regulations for approval of a financing order authorizing the securitization of $1 billion in costs via a Securitization Cost Recovery Rider.

104050Notice of Intervention - MEUs 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act – and – IN THE MATTER OF: The Financing Orders and Securitized Bonds Regulations – and – IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for approval of...

AI summary The Nova Scotia Energy Board is considering an application by Nova Scotia Power Incorporated for approval of a financing order that would authorize the securitization of $1 billion in costs collected through a Securitization Cost Recovery Rider.

104051MEUs (NSPI) IR 1 to 6 2 passages
NOVA SCOTIA UTILITY AND REVIEW BOARD
NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT and IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS and IN THE MATTER OF: An application by NOVA SCOTIA POWER INCORPORATED for approva...

AI summary The Nova Scotia Utility and Review Board is considering an application by Nova Scotia Power Incorporated to approve a financing order authorizing the securitization of $1 billion in costs collected through a Securitization Cost Recovery Rider.

(NSUARB M13133) MEU Information Requests to NS Power
(NSUARB M13133) MEU Information Requests to NS Power IR-6 Reference: Section 8.0, Rate Impact, Figure 7: Securitization Rider for Below the Line (BTL) customer class in 2027, page 31. Reference: Appendix H, Tab 2027 Securitization Rider IE...

AI summary The document contains information requests from MEU to NS Power regarding the 2027 kWh sales forecasts for OATT MEUs and the inclusion of BUTU Tariff load in the IESO Securitization Rider calculation. The requests aim to clarify the inclusion of BUTU forecast sales and to recalculate the rider without these sales.

104052PHP (NSPI) IR 1 to 3 2 passages
NOVA SCOTIA UTILITY AND REVIEW BOARD
NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT and IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS and IN THE MATTER OF: An application by NOVA SCOTIA POWER INCORPORATED for approva...

AI summary Nova Scotia Power Inc. has applied for approval of a financing order authorizing the securitization of $1 billion in costs collected through a Securitization Cost Recovery Rider under the Public Utilities Act and related regulations.

Question:
Question: With respect to the Thermal Assets, please confirm that NS Power intends to calculate the annual class-specific revenue requirement of the Securitization Cost Recovery Rider each year based on the class's share of demand and ener...

AI summary The question asks NS Power to confirm whether it intends to calculate the annual class-specific revenue requirement of the Securitization Cost Recovery Rider based on the class's share of demand and energy expenses forecast for each year.

104060Morrison Park (NSPI) IR 1 to 7 5 passages
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS -and- IN THE MATTER OF: AN APPLICATION by NOVA SCOTIA POWER INCORPORATED for approval of a...

AI summary Nova Scotia Power Inc. has applied for a Financing Order to securitize $1 billion in costs through a Securitization Cost Recovery Rider. Morrison Park Advisors has been requested to provide information by October 29, 2026, as part of the regulatory process.

Request IR-1:
Request IR-1: - References: Application Appendix B (Confidential) - Please provide supporting analysis for the estimated "Securitization Bond Interest Rate". In that - analysis, please make reference to: - Prevailing Government of Canada a...

AI summary The document requests supporting analysis for the estimated 'Securitization Bond Interest Rate', referencing prevailing government bond rates, expected credit ratings, and credit spreads for similar bonds in Canada.

Request IR-4:
Request IR-4: - Nova Scotia Power has previously made arrangements to (effectively) securitize FAM balances - with external parties. $500 Million of FAM balances were previously securitized with the - assistance of a Government of Canada l...

AI summary Nova Scotia Power previously securitized $500 million and $117 million of FAM balances over 28 and 10 years, respectively. The request asks for the reasoning behind these terms, the choice of a 30-year term in the current proposal, and the impact of even-annual versus mortgage-style repayment on ratepayers and debt costs.

Request IR-6:
Request IR-6: - References: Application page 21 - Nova Scotia Power has requested "Annual Servicing Fees" of $500,000, because "As servicer, - NS Power will be responsible for determining customers' electricity usage; billing, collecting a...

AI summary Nova Scotia Power is requesting annual servicing fees of $500,000 for administrative duties related to the Securitized Surcharge. The request seeks confirmation of current responsibilities and an estimate of incremental costs for these tasks.

Request IR-7:
Request IR-7: - References: Application page 25 and Appendix B (Confidential) - Nova Scotia Power has calculated a Net Present Value difference as between the proposed plan - and the assumed "Traditional Recovery" of more than $265 Million...

AI summary Nova Scotia Power has calculated a $265 million Net Present Value difference between a proposed plan and the 'Traditional Recovery' approach. The request asks for an analysis of how much of this difference is due to the lower cost of capital and the longer 30-year term of the Securitized Financing, as well as a comment on the inter-generational fairness implications of the term choice.

104073Participant List 1 passage
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS
IN THE MATTER OF THE FINANCING ORDERS AND SECURITIZED BONDS REGULATIONS - and – IN THE MATTER OF an application by NOVA SCOTIA POWER INCORPORATED for approval of a financing order authorizing the securitization of $1 billion in costs, coll...

AI summary This document pertains to an application by Nova Scotia Power Incorporated for approval of a financing order to securitize $1 billion in costs through a Securitization Cost Recovery Rider.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →