Topic/Matter Intersection

Topic:"Stakeholder Engagement" in M03413

Matter: CI# 39323; CI# 39626; CI# 39627; & CI# 39628 - P-128.10 - NSPI WO - (Digby Wind Project) Application for approval of capital work orders  in the amount of $82.8 million for the acquisition, construction and interconnection of the Digby Wind Farm Project
34 passages 7 documents

Stakeholder Engagement across all matters →

N-1Application 1 passage
REDACTED (Certain Appendices Only) p. p. 17
REDACTED (Certain Appendices Only) 1  Engineering and Geotechnical reports 2  Wind data, reports and studies 3  Applicable permits; including NAV Canada, Transport Canada, 4 meteorological tower, wind turbine, building, breaking soil an...

AI summary The document outlines the community engagement efforts undertaken by NSPI for a project, including collaboration with local groups, participation in Community Liaison Committee meetings, and communication with the Digby County Municipality to address community concerns and provide updates.

N-3-(a)Redacted NSPI Response to UARB IR-1 to IR-12 (att 2) 6 passages
Chronology of Major Events for the Digby Wind Project p. p. 15
Chronology of Major Events for the Digby Wind Project Date Event Parties Explanation / Significance ments Docu mber 11, 2006 Dece ARB Staff Briefing U ARB NSPI/U ARB about the 2007 Request for Proposals Briefed U mber 19, 2006 Dece ment Pu...

AI summary This document outlines the chronology of major events related to the Digby Wind Project, including stakeholder engagement, the issuance of a renewable energy RFP, and interconnection feasibility studies conducted by NSPI and IPPs.

6.0 First Nation and Aboriginal Engagement p. p. 127
6.0 First Nation and Aboriginal Engagement 6.1 The Approval Holder must develop a plan, to engage interested Aboriginal Groups following receipt of the MEKS, to discuss any impacts on traditional Mi' kmaq resources, and to clarify project...

AI summary The Approval Holder is required to create a plan for engaging Aboriginal groups post-MEKS receipt, focusing on discussing impacts on traditional Mi'kmaq resources, clarifying project activities, and identifying mitigation measures.

Maximizing Community Involvement and Social Benefits p. p. 153
Maximizing Community Involvement and Social Benefits The plan offers opportunities for everyone – from community groups to First Nations, local not-for-profit organizations, businesses and individuals to actively participate in the develop...

AI summary The plan emphasizes inclusive participation in renewable energy development, inviting community groups, First Nations, not-for-profits, businesses, and individuals to engage and share benefits. Collaboration is framed as essential to achieving social and environmental outcomes.

First Nations p. p. 166
First Nations The Mi'kmaq have expressed interest in collaborating on the development of Nova Scotia's renewable energy sector.Continuing to build a positive relationship with the Mi'kmaq is a key priority for the province. Nova Scotia con...

AI summary The Mi'kmaq have shown interest in collaborating on Nova Scotia's renewable energy development. The province prioritizes engagement through consultation frameworks and offers programs like COMFIT and FIT to support Mi'kmaq participation. Early developer engagement with Mi'kmaq is emphasized as a commitment to inclusive energy project development.

Contents of application p. p. 180
Contents of application - 27 An application must be in the form prescribed by the Minister and must: - (a) contain the name, address, telephone, e-mail address and fax number of the applicant and where applicable, proof of current - regist...

AI summary The application requirements outline mandatory elements for project proposals, including applicant details, generator qualification, community engagement with Míkmaq communities, environmental approvals, financial viability, interconnection studies, and compliance with regulations. Emphasis is placed on demonstrating community support, environmental impact assessments, and alignment with municipal and heritage requirements.

6.0 First Nation and Aboriginal Engagement p. p. 24
6.0 First Nation and Aboriginal Engagement 6.1 The Approval Holder must develop a plan, to engage interested Aboriginal Groups following receipt of the MEKS, to discuss any impacts on traditional Mirkmaq resources, and to clarify project a...

AI summary The Approval Holder must engage Aboriginal Groups after receiving MEKS to discuss impacts on traditional Mirkmaq resources, clarify project activities, and identify mitigation measures.

N-3-(b)Redacted NSPI Response to UARB IR-12 (att 7-10) to IR-17 20 passages
Stakeholder Consultation and Aboriginal Engagement p. p. 0
Stakeholder Consultation and Aboriginal Engagement The consultation activities for the Digby Wind Power Project included a public Project announcement in the local community of Rossway (May 2008), a presentation to the Municipality of Digb...

AI summary The Digby Wind Power Project conducted stakeholder consultations including public meetings, council presentations, and direct engagement with the Mi'Kmaq community through mailouts and ecological studies. Future outreach plans include community newsletters, open houses, and ongoing engagement. SkyPower will implement a community liaison program for project operations.

2.5 Location of Project p. p. 24
2.5 Location of Project The proposed Project is to be located in the Municipality of Digby, near Gulliver's Cove, Nova Scotia. The wind energy facility will be constructed on undeveloped woodlands generally bounded to the north by the Bay...

AI summary The proposed Digby Wind Power Project is located in Digby, Nova Scotia, near Gulliver's Cove. The Study Area spans 1,132 ha, with turbines and a substation situated based on stakeholder input, including relocating turbines north of Highway 217 after community feedback. A 10.6 km transmission line connects to the Conway substation, with ongoing design optimization to minimize environmental and socioeconomic impacts.

3.2.2 Public and Stakeholder Consultation p. p. 24
3.2.2 Public and Stakeholder Consultation Over the course of Project planning, SkyPower representatives have consulted with the local community and stakeholders primarily through a public meeting at the Rossway Community Centre with repres...

AI summary SkyPower conducted public consultations for the Project through meetings with NSPI, municipal councils, and open houses in 2008. Additional outreach in 2009 included a website, newsletters, and community engagement. The EA process allows public input on the Project, with future phases continuing stakeholder consultation.

3.2.3 Regulatory Consultation p. p. 24
3.2.3 Regulatory Consultation Various regulatory and other agencies were consulted early in the planning process to provide input into the Project and the process, and advice in terms of likely approvals and considerations for environmenta...

AI summary SkyPower and the Jacques Whitford Stantec Limited Study Team consulted agencies including CEAA, CWS, NSE, NSDNR, and NRCan during project planning for environmental assessment input. A draft EA was submitted for regulatory review, with feedback incorporated into the final EA Registration document. Further regulatory consultation details are in Section 7.

3.2.4 First Nation and Aboriginal Engagement p. p. 24
3.2.4 First Nation and Aboriginal Engagement The Project Area consists of privately held land used primarily for forestry and residential uses and there is no known traditional use by First Nation people. SkyPower has commissioned the Conf...

AI summary The Digby Wind Power Project involves engaging First Nations through a Mi'kmaq Ecological Knowledge Study (MEKS) and consultations. SkyPower commissioned the Confederacy of Mainland Mi'kmaq (CMM) to conduct the study, while also participating in a scoping meeting with Nova Scotia Environment (NSE) and Mi'kmaq representatives to facilitate early consultation. Aboriginal communities will review the Environmental Assessment (EA) report.

Table 6.1 Environmental Monitoring Programs (Operations) p. p. 131
Table 6.1 Environmental Monitoring Programs (Operations) Component Method Timing Response-Action Plan visual impact of the wind turbines. Media comment on the wind turbines will also be collected and documented. If required, photographs wi...

AI summary The text outlines environmental monitoring programs for wind turbines, including visual impact assessments and media comment collection. It also mentions a complaint resolution system for electromagnetic interference. The section also references stakeholder consultation and Aboriginal engagement.

7 STAKEHOLDER CONSULTATION AND ABORIGINAL ENGAGEMENT p. p. 131
7 STAKEHOLDER CONSULTATION AND ABORIGINAL ENGAGEMENT Public consultation is an integral part of the environmental planning process and plays a key role in addressing potential public concerns identified in early stages of the Project. Publ...

AI summary Public consultation is a required part of the environmental planning process for the wind power project, involving activities like public announcements, open houses, and stakeholder meetings. Future consultations will occur during the EA review phase, with opportunities for public comment on the project and EA document.

7.1 Community Consultation p. p. 131
7.1 Community Consultation An Open House public meeting was held on November 17, 2008 from 5:00 pm to 8:00 pm at the Rossway Community Centre. The session was attended by more than 30 people. The intent of the Open House session was: - to...

AI summary An open house public meeting was held on November 17, 2008, to facilitate dialogue between the project team and the public regarding a wind energy project. Attendees were provided with information about the project, including turbine layouts, construction processes, and environmental assessments. Feedback forms were collected, and representatives from Skypower Corp., Scotian WindFields Inc., and Jacques Whitford Stantec Limited were present.

Table 7.1 Information Panels Presented at the Open House p. p. 131
Table 7.1 Information Panels Presented at the Open House Public Open Houses ƒ Corporate Information ƒ Potential Issues of Concern (e.g., birds and noise) ƒ Community Engagement Process ƒ Benefits of Wind Energy ƒ Project Description (inclu...

AI summary Table 7.1 outlines the information panels presented at the open house, covering topics such as corporate information, community engagement, project description, technical details, and regulatory approval. Few concerns were raised by the public, with feedback summarized in Table 7.2.

Table 7.2 Issues Raised at the November 17, 2008 Open House p. p. 131
Table 7.2 Issues Raised at the November 17, 2008 Open House Issue/ Comment SkyPower Response General Comments Thought it would be somebody speaking and answering The purpose of the community information session was to provide the most up-t...

AI summary The table outlines issues raised at an open house regarding the Digby Wind Power Project. Concerns include the project's location, decommissioning, and a lack of full information sharing. SkyPower responded by emphasizing the project's benefits, environmental compliance, and commitment to community engagement.

Section 409 p. p. 131
Stakeholder Consultation and Aboriginal Engagement

AI summary The text references the process of Stakeholder Consultation and Aboriginal Engagement, highlighting the importance of involving relevant parties in regulatory proceedings.

Section 411 p. p. 131
Stakeholder Consultation and Aboriginal Engagement

AI summary The text refers to the process of Stakeholder Consultation and Aboriginal Engagement, highlighting the importance of involving stakeholders and Aboriginal communities in regulatory proceedings.

Preamble p. p. 131
SkyPower will also develop and implement a community liaison and issues resolution program for Project construction and operation. This program will include company contacts as well as an issues resolution procedure for community members t...

AI summary SkyPower will develop a community liaison and issues resolution program for the Project, including procedures for documenting and resolving community concerns, as well as regular updates to stakeholders through various communication methods. The text also references stakeholder consultation and Aboriginal engagement.

7.3 Regulatory Consultation p. p. 131
7.3 Regulatory Consultation Various regulatory and other agencies were consulted early in the planning process to provide input into the Project and the process, and advice in terms of likely approvals and considerations for environmental...

AI summary SkyPower and the Jacques Whitford Stantec Limited Study Team consulted agencies like CEA, CWS, NSE, and NRCan during project planning. The project triggered CEAA due to federal funding under NRCan's EERP program, with a draft EA submitted for review. Ongoing regulatory engagement includes post-construction monitoring and permit applications.

7.4 First Nation and Aboriginal Engagement p. p. 131
7.4 First Nation and Aboriginal Engagement The Project site consists of privately held land used primarily for forestry and residential uses; there is no known traditional use by First Nation people. Letters containing general project deta...

AI summary SkyPower engaged First Nations and Aboriginal groups regarding the Digby Wind Power Project through letters, discussions, and an MEKS. The MEKS aimed to document Mi'kmaq ecological knowledge and resource use, with results shared with NSE and KMK. First Nations were invited to comment on the EA report during the registration process.

Some farmers look to establish trust to protect valuable farmland p. p. 169
Some farmers look to establish trust to protect valuable farmland ers are eyeing a unique way to protect valuable farm land from being gobbled up by development, while helping themselves at the same time. "This has been a challenge for a l...

AI summary Farmers in Nova Scotia, led by Patricia Bishop of the Kings County Federation of Agriculture, seek collaborative solutions to preserve farmland from development. They highlight the lack of tools for land protection, challenges to municipal planning, and economic pressures forcing land sales to developers.

COMMUNITY ENGAGEMENT p. pp. 176-177
COMMUNITY ENGAGEMENT ÇThe Partners are committed to ongoing communication with council, community and all stakeholders: ÇJuly, 2007, early engagement of 2007, Digby Municipal Council ÇMay 14, 2008, PPA Announcement in Announcement Digby ÇN...

AI summary The Partners emphasize ongoing communication with stakeholders, detailing community engagement efforts from 2007-2008, including municipal council meetings, PPA announcements, and distribution of wind power information packages to residents.

ENVIRONMENTAL ASSESSMENT PROCESS p. pp. 180-182
ENVIRONMENTAL ASSESSMENT PROCESS • The results are presently being compiled. The Ç The environmental assessment report will be submitted to regulators in December 2008. Ç Any comments or concerns regarding the environmental impact assessme...

AI summary The environmental assessment report will be submitted in December 2008, with opportunities for public comment directed to the Proponent or Jacques Whitford. Sound modeling is being used to minimize noise impacts from turbines on nearby residences.

Environmental Assessment for Return of Boat Harbour to a Tidal Estuary, Pictou County, NS, 2003-ongoing (Project Manager) p. p. 90
Environmental Assessment for Return of Boat Harbour to a Tidal Estuary, Pictou County, NS, 2003-ongoing (Project Manager) CEAA screening level assessment for the decommissioning of a portion of a wastewater treatment facility associated wi...

AI summary The Canadian Environmental Assessment Agency (CEAA) conducted a screening-level assessment for decommissioning part of a wastewater treatment facility linked to the Kimberly-Clark pulp and paper mill in Pictou County, NS. The project also involved developing a public consultation program as part of the environmental assessment process.

Environmental Assessment, Highway 104, New Glasgow to Sutherlands River, North, NS, 2003-2005 (Project Manager) p. p. 90
Environmental Assessment, Highway 104, New Glasgow to Sutherlands River, North, NS, 2003-2005 (Project Manager) CEAA assessment of a highway twinning project with potential bypass option. A community impact study including a full-day commu...

AI summary The Canadian Environmental Assessment Agency (CEAA) conducted an environmental assessment for a Highway 104 twinning project with a potential bypass option. A community impact study, including a full-day workshop and newsletters, was undertaken to evaluate route options and engage stakeholders.

N-6Proof of Advertising 2 passages
NOVA SCOTIA UTILITY AND REVIEW BOARD NOTICE OF PUBLIC HEARING NOVA SCOTIA POWER INC. DIGBY WIND PROJECT p. pp. 2-3
NOVA SCOTIA UTILITY AND REVIEW BOARD NOTICE OF PUBLIC HEARING NOVA SCOTIA POWER INC. DIGBY WIND PROJECT Notice is hereby given that Nova Scotia Power Incorporated ("NSPI") has made an Application to the Nova Scotia Utility and Review Board...

AI summary Nova Scotia Power Inc. (NSPI) has applied to the Nova Scotia Utility and Review Board for approval of capital work orders related to the Digby Wind Project, with a total cost of approximately $82.77 million. The hearing includes details about the timeline, submission of evidence, and procedures for public participation.

MONTH TO THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE P NOTICE OF PUBLIC HEARING MONANCE PROJECT p. p. 4
e public who have so written to the Clerk of the Board will be permitted to speak. In the absence of any registered speakers by the December 15th deadline noted above, no evening session will be held. ANYONE WISHING TO MAKE WRITTEN COMMENT...

AI summary The document outlines procedures for public participation in a regulatory proceeding, including deadlines for written comments and access to application materials. It also provides information on where and how to submit comments and access relevant documents.

05500Information Requests IR-1 to IR-20 issued to NSPI by the Consumer Advocate 2 passages
Section 3
Consumer Advocate Information Requests to NSPI

AI summary The document outlines information requests made by the Consumer Advocate to Nova Scotia Power Inc. (NSPI), indicating a regulatory process involving consumer interests and utility company obligations.

Section 5
Consumer Advocate Information Requests to NSPI

AI summary The document outlines information requests made by the Consumer Advocate to Nova Scotia Power Inc. (NSPI), indicating a regulatory process aimed at ensuring transparency and accountability in utility operations.

06132Closing Submission - NSPI 1 passage
Section 95
18 Transcript, page 80, line 18 – page 81, line 16.

AI summary The transcript excerpt discusses the regulatory process and the role of the Utility and Review Board in overseeing utility matters. It mentions the submission of evidence and the importance of stakeholder engagement in the proceedings.

06537Board Decision 2 passages
Preamble p. p. 0
n or Water Street) the Board, on its own initiative, will initiate a consultation process either by means of a public hearing or written submissions. [Board Letter to NSPI, November 26,2009, pp. 1-2] 5. Certain capital work order matters i...

AI summary The Board may initiate a consultation process for significant capital work orders exceeding $5 million or those increasing OM&G costs by more than $10 million annually. Stakeholders are invited to request formal participation within seven days of notification.

E. Renewable Energy Standards Requirements & ecoEnergy Incentive p. p. 0
ratepayers. V PUBLIC INPUT [157] Part of the Board's practice, when conducting public hearings, is to include an opportunity for the public to comment on cases before the Board. Notices on the subject of hearings, and the timeline establis...

AI summary The Nova Scotia Utility and Review Board received public input on a renewable energy project, with mixed reactions. Some residents expressed concerns about the inefficiency of wind projects and potential rate increases, while the Digby Area Board of Trade supported the project as a positive green energy development.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →