N-12023 Load Forecast Report + Appendecies - Redacted
3 passages
1 The Board directs NS Power to evaluate the model’s economic inputs, 2 including the COVID-19 variable and the assumptions and calculations 3 used to assess the impact of DSM, Solar PV, EVs, battery storage, and 4 weather. 5 6 The Board a...
AI summary The NSUARB directs NS Power to evaluate economic inputs in its load forecast model, including COVID-19 impacts, DSM, Solar PV, EVs, battery storage, and weather. It emphasizes stakeholder engagement and recommends refining elasticity assumptions, residential model variables, and housing completion data to improve forecast accuracy.
. 26 • A summary of the Smart Grid and Demand Response projects is provided in 27 Sections 4.4 and 10. 28 • A discussion of the economic inputs, including housing completions and median 29 income, is provided in Section 4.3. 30 4 Ibid, pag...
AI summary NS Power held a stakeholder session on March 31, 2023, discussing updates to the 2023 Load Forecast, including impacts of COVID-19, EV growth, space heating, peak temperature assumptions, renewable-to-retail effects, and small-scale solar trends. The session addressed stakeholder questions about a new system peak set in February 2023.
of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 Load Forecast Report Appendix E Page 1 of 21 MARCH 31, 2023 2023 10yr Preliminary Forecast . REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 Load Forecast Report Appendix E Page 2 of 2...
AI summary This document outlines the timeline and purpose of the 2023 10-year preliminary load forecast report, including stakeholder engagement and submission to the NSUARB. It provides an overview of the forecast updates and improvements, and sets the stage for feedback and discussion.
N-7NSPI (Synapse) RIR-1 to RIR-46 - Redacted
5 passages
ew product this year, report on the $2,000,000 in sales this year. Also note that revenues should also be reported for products that are being licensed out. For cost savings from process innovation, provide an estimate of the percentage of...
AI summary The text outlines reporting requirements for sales, revenue, and cost savings related to process innovation, as well as training activities undertaken by the client, including on-the-job training and co-op programs. It references guidelines from Statistics Canada.
s began on the job 1,951 training? a) Of 1), how many began training directly related to the project? 0 2) Between Jan 2020 and Dec 2020, what is the total number of hours of on the job training 12 provided to employees? a) Of 2), what is...
AI summary The text provides data on training and co-op placements between January 2020 and December 2020, including the number of employees trained, hours of on-the-job training, and expenses incurred. It also asks whether any co-ops were hired specifically for the SIF-funded project.
Residential and Business, Nonprofit and Institutional (BNI) Climate Single Weather Zone Time Horizon 2021- 2045 (25 years) 1.2 Stakeholder Engagement EfficiencyOne engaged stakeholders beginning in the fall of 2018 to encourage input into...
AI summary EfficiencyOne engaged stakeholders starting in the fall of 2018 for the 2019 Electricity Demand Side Management Potential Study. The process included webinars, technical conferences, and multiple review periods to incorporate feedback and improve the study's accuracy and relevance to Nova Scotia.
odelling Scenarios’ Assumptions WebEx Presentation held May 28, 2019 • 2019 Potential Study Technical Conference held July 16, 2019 • Three formal stakeholder review and comment periods: o On March 22, 2019, EfficiencyOne shared draft Pote...
AI summary The document outlines stakeholder engagement activities related to a study on energy efficiency potential in Nova Scotia, including review periods and feedback opportunities with the DSMAG. It also highlights caveats and limitations of the study, particularly regarding program design and measure characterization.
1 Request IR-46: 2 3 General Forecast Report Improvements – The Board Decision of October 31, 2022 Includes 4 the following findings (pp 5-6): 5 6 The Board notes that NS Power has agreed to many of the intervenors’ 7 recommendations and a...
AI summary The Board directed NS Power to implement intervenors' recommendations in the Load Forecast report, including detailed analysis of electrification impacts, new technologies, and weather-normalized calculations. It also encouraged continued stakeholder engagement and early sharing of forecast evaluations.