Topic:"Standardized Filing" in M12619

Matter: Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million
2 passages 1 document

Standardized Filing across all matters →

N-6NSPI (NSEB) RIR 1 to 202 - Redacted 2 passages
Preamble p. p. 37
Comprehensive Hazard Assessments have been completed and are available for the following operations: - − Asphalt Plant Operations - − Asphalt Operations - − Blasting Operations - − Concrete Operations - − Demolition Operations - − Drilling...

AI summary The text lists various operations for which comprehensive hazard assessments have been completed, including asphalt, blasting, concrete, and snow and ice control operations, among others. The document is part of a standardized filing and is on page 27 of 89.

5.5 Standard Operating Procedures (SOPs) p. p. 39
5.5 Standard Operating Procedures (SOPs) Standard Operating Procedures (SOPs) are administrative controls that determine the actions and precautions that should be taken while performing a task to prevent a potential loss or minimize its e...

AI summary Standard Operating Procedures (SOPs) are administrative controls that outline actions and precautions to prevent potential losses or minimize their effects. SOPs must include sections such as introduction, life-saving commitments, personal protective equipment requirements, training, process steps, and amendments. They are made accessible to all relevant employees and facilities.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →