SPECIAL CONDITIONS
p. pp. 14-15
SPECIAL CONDITIONS (1) The Port Authority owns and is responsible for the maintenance and operation of all electrical equipment required for the supply of port electricity to docked ships other than the meters and - metering transformers s...
AI summary The Port Authority and NSPI have defined roles and responsibilities regarding electrical equipment, metering, and operational procedures for port electricity supply. Special conditions include metering responsibilities, staff availability, scheduling, metering costs, transformer losses, and power factor requirements.