Topic/Matter Intersection

Topic:"System Benefits Charge" in M12619

Matter: Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million
2 passages 2 documents

System Benefits Charge across all matters →

N-3NSPI (CA) RIR 1 to 32 - Redacted 1 passage
CONFIDENTIAL (Attachment Only) p. p. 26
CONFIDENTIAL (Attachment Only) 1 necessary to account for the potential additional costs associated with potential, necessary 1.9 X Winding Voltage 13.2 kV 13.2 1.10 X Winding Connection Wye-gnd Wye-gnd 1.11 X Winding BIL Line End 95 kV 95...

AI summary The text provides technical specifications and compliance details for a transformer, including voltage, winding connections, losses, and adherence to industry standards. It includes cost estimates for load and no-load losses, as well as details about the load tap changer and noise ratings.

100706CA (NSPI) IR 1 to 32 - Word 1 passage
Section 22
ghts; and 4. External factors driving costs, including supply chain issues, shifts in the regular/overtime labour breakdown due to other utility programs. 2. In the referenced RIR, NS Power stated: NS Power has data on single-family and mu...

AI summary The text discusses NS Power's data tracking challenges, specifically regarding residential additions and internal work orders. It requests information on changes to work orders since 2025, updates on a continuous improvement initiative, and plans for future system upgrades.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →