N-1Annual Report - Redacted 1 passage
Preamble p. p. 7
Cause Code 2 - NDN - NSP Energy System Operator initiated ramp Down Total Billed $ 100.85 Cause Code 3 - PFL - PHP Failure to Load due to equipment or process constraints ADC $ (2.20) Cause Code 4 - PNA - PHP and NSP Agreement to new dispa...

AI summary This text details various cause codes related to energy system adjustments and billing, including ramp down events, failure to load due to equipment constraints, and adjustments related to the Active Demand Control (ADC) program. It also provides information on the total cost to serve PHP in 2025.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →