Why do this project? The load on the 69kV system in the Annapolis Valley has increased to a level where a loss of selected elements (138kV line or 138-69kV transformer) in the area, under peak load conditions, causes the voltage on the 69k...
AI summary The project is necessary due to increased load on the 69kV system in the Annapolis Valley, which risks voltage drops below acceptable levels during peak conditions. The solution involves adding a new 138kV line and a 138kV-69kV autotransformer at the 51 V-Tremont Substation to ensure reliability.