Matter: NSPI CI# 33525 - $8,016,435 - Canaan Rd. 43V to Tremont 51V Line
1 passage 1 document

System Reliability across all matters →

N-1Redacted Work Order 7/27/2010 1 passage
Why do this project now? p. p. 14
Why do this project now? The 2010/11 peak load on the 69kV system in the Annapolis Valley is forecasted to reach levels such that failure of selected elements (138kV line or 138-69kV transformer) during peak load conditions causes the volt...

AI summary The 2010/11 peak load on the 69kV system in the Annapolis Valley is forecasted to reach levels that could cause voltage drops below acceptable levels if certain system elements fail during peak conditions, potentially leading to outages.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →