Why do this project now?
p. p. 14
Why do this project now? The 2010/11 peak load on the 69kV system in the Annapolis Valley is forecasted to reach levels such that failure of selected elements (138kV line or 138-69kV transformer) during peak load conditions causes the volt...
AI summary The 2010/11 peak load on the 69kV system in the Annapolis Valley is forecasted to reach levels that could cause voltage drops below acceptable levels if certain system elements fail during peak conditions, potentially leading to outages.