Why do this project? In March 2010, the pump in location 3A failed and was removed from service. It is necessary to refurbish this pump and ret Jrn it to service as soon as possible to reduce the risk of unit de-rating or a forced outage w...
AI summary The pump in location 3A failed in 2010 and requires urgent refurbishment to prevent unit de-rating or outages. Each unit relies on two Circulating Water (CW) pumps for condenser cooling, critical for maintaining efficiency and vacuum levels. During warmer months, both pumps are necessary; failure of one could restrict load generation, while losing both would cause outages. The pumps, aged 18–23 years, suffer from wear and corrosion.