HomeSystem ReliabilityM08888Evidence
Topic/Matter Intersection

Topic:"System Reliability" in M08888

Matter: E-ENS-G-18 - EfficiencyOne - Evaluation of DSM Programs - Application to allow inclusion of Non-Energy BenefitsEfficiencyOne - Application for approval of the use of Non-Energy Benefits within Cost-Effectiveness Testing
4 passages 2 documents

System Reliability across all matters →

E-10-(i)Book of Authorities 3 passages
Performance standards for adverse weather conditions p. p. 312
Performance standards for adverse weather conditions - 52A (1) The Board shall establish performance standards for Nova Scotia Power Incorporated in respect of reliability and response to adverse weather conditions. - (2) For the purpose o...

AI summary The Nova Scotia Utility and Review Board (UARB) is mandated to establish performance standards for Nova Scotia Power Incorporated (NSPI) regarding reliability and response to adverse weather conditions. Standards must align with North American utility industry benchmarks, adjusted for provincial conditions, and ensure consistency with North Atlantic seaboard utilities. Regulations and other factors also influence these standards, as per 2015 legislation.

Appointee to investigate safety or adequacy of service p. p. 312
Appointee to investigate safety or adequacy of service 82 The Board may, either with or without notice to a public utility, make an order appointing a person to make at any time or from time to time any examinations, investigations or test...

AI summary The Nova Scotia Utility and Review Board (UARB) has the authority to appoint investigators to assess the safety and adequacy of public utility services. The Board may set remuneration for appointees, which public utilities must pay upon certification. This power is codified in R.S., c. 380, s. 82.

II. Post-2015 Goal Allocation Methodologies p. p. 414
sembly enacted an energy conservation measure, then codified in Article 78, §28(g) of the Maryland Annotated Code, and later re-codified as PUA § 7-211. & lt;sup>84 PUA § 7-211(b)(1). & lt;sup>85 This study concluded that electric utility...

AI summary The text discusses the cost-effectiveness of energy efficiency programs, highlighting their lower lifecycle costs compared to traditional energy sources. It emphasizes the importance of continuing these programs to avoid increased load on the PJM system and higher reliability risks. The analysis also notes that energy efficiency remains less costly for ratepayers than paying for electricity directly.

E-13-(i)Book of Authorities 1 passage
en appel de la cour d'appel de l'alberta p. p. 125
de la Commission sont inhérentes à sa principale fonction qui consiste à fixer des tarifs justes et raisonnables et à préserver l'intégrité et la fiabilité du réseau d'alimentation. [7] [41] [43] [46]

AI summary The document discusses the Alberta Energy and Utilities Board's (AEUBA) role in setting fair rates and ensuring grid reliability. It references legal citations [7], [41], [43], and [46], emphasizing the commission's core functions related to utility regulation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →