HomeSystem ReliabilityM12149Evidence
Topic/Matter Intersection

Topic:"System Reliability" in M12149

Matter: Nova Scotia Power Inc. - Investigation arising from Joint Use Agreement between NS Power and Bell Aliant
1 passage 1 document

System Reliability across all matters →

N-1Joint Use Agreement between NS Power and Bell Aliant 1 passage
3.10.02General
3.10.02General - For the purpose of this procedure, Live Line Conditions shall be deemed to exist within a four foot radius from the nearest contact point of any energized line, apparatus or supporting structure carrying an energized line...

AI summary This section defines Live Line Conditions and emphasizes the importance of advance coordination between utilities to ensure safety, service continuity, and equipment protection during joint work operations involving energized lines above 300 volts to ground.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →