Request IR-2: - Reference to page 1 of 5, NS Power notes that "This work is crucial to maintaining safe and efficient boiler operation and minimizing the risk of unplanned outages. Refractory materials are - installed in the following key...
AI summary NS Power requests confirmation of work on refractory materials in boiler components, details of completed work, budget estimation methodology if no work was done, and supporting studies. The request emphasizes maintaining safe operations and preventing outages.
Request IR-6: - Reference to 2025 10-Year System Outlook (M12386), page 17 of 64 (Figure 7), NS Power notes that Point Aconi will be retired on 2029/2030. - a) How does the proposed boiler refractory system refurbishment align with NS Powe...
AI summary Request IR-6 queries NS Power about maintenance strategies for Point Aconi, alignment with 80% renewable energy goals by 2030, and plans for adjusting maintenance post-retirement (2029/2030). Questions focus on refurbishment alignment, regular maintenance procedures, and potential strategy revisions.