N-1Application - Redacted
150 passages
1 2 In preparing its capital plans, NS Power utilizes its established asset management approach, and 3 considers safety, reliability, climate change adaptation, and affordability, while incorporating the 4 Company’s decarbonization targets...
AI summary NS Power uses an asset management approach to prepare capital plans, focusing on reliability, resiliency, and affordability. The 2026 ACE Plan includes investments in reliability-focused improvements to the T&D system, addressing challenges from severe weather events through vegetation management, storm hardening, and grid modernization.
1 4.0 2025 ANNUAL CAPITAL EXPENDITURE PLAN FOLLOW-UP 2 3 This section addresses items arising from the 2025 ACE Plan. These items include a list of 4 subsequent submittal capital items from the 2025 ACE Plan that are planned to be submitte...
AI summary This section outlines follow-up actions related to the 2025 Annual Capital Expenditure (ACE) Plan, including updates on the Five-Year Reliability Plan, removal of SAIDI reporting, and initiation of a third-party review process under matter M12558.
CI# Project Title 2026 Budget ($) Project Total ($) and intermediate pressure steam from the boiler to produce power through the generator. C0082195 LIN2 2025/26 Capacity Requirement 299,478 3,162,203 This project is for the component refu...
AI summary The document outlines several infrastructure and maintenance projects across Nova Scotia's energy sector, including asset refurbishment, replacement of equipment, and system upgrades to ensure operational reliability and compliance with environmental regulations.
CI# Project Title 2026 Budget ($) Project Total ($) C0071888 New Tidewater Substation 4,119,741 4,141,223 This project is to build a new Tidewater Substation to address increased residential electricity demand, improve system reliability,...
AI summary The document outlines several capital projects aimed at improving electricity infrastructure in Nova Scotia, including new substations, transformer replacements, and transmission line upgrades to enhance system reliability and meet growing demand.
eliver and manage data integrations in a more timely and cost effective manner. C0047278 IT - Oracle MDM Upgrade 4,684,089 7,949,409 The Meter Data Management (MDM) System is nearing end-of-life and requires an upgrade to maintain vendor s...
AI summary The text discusses the need to upgrade the Meter Data Management (MDM) System and the Advanced Distribution Management System (ADMS) to ensure vendor support, cybersecurity, and compatibility with emerging technologies. These upgrades are part of the 2026 ACE Plan and involve significant financial investments.
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan CONFIDENTIAL (Attachments Only) 1 For additional detail on NS Power’s reliability strategy, including metrics and resilience planning, 2 please refer to Section 11.1.4. 3 4 The focu...
AI summary The 2026 ACE Plan outlines NS Power’s transmission capital investments, totaling approximately $241.1 million, with a focus on system reliability, energy storage, and synchronous condensers. The plan includes spending for projects over $1 million, with some approvals sought after the filing of the ACE Plan.
1 11.1.4 Impact of Reliability Projects 2 3 The Board’s 2013 ACE Plan Decision provided the following directive: 4 5 …the Board expects NSPI to monitor the impact of the deferral of reliability 6 projects in the original 2013 ACE Plan clos...
AI summary The document outlines the Board's directives related to the impact of reliability projects in the Annual Capital Expenditure (ACE) Plan. It emphasizes NSPI's responsibility to monitor deferrals, report on reliability performance, and align capital investments with performance standards.
1 are necessary. This approach is driven by and aligned with NS Power’s asset management strategy 2 for T&D assets and includes implementation by the Reliability team. In addition to the dedicated 3 areas of scope and responsibilities for...
AI summary The document discusses NS Power's reliability initiatives, including updates on the Reliability Team's progress and alignment with the company's asset management strategy. The Board directed NS Power to provide updates on the Reliability Director's implementation progress as part of the ACE Plan, with a focus on reducing outage frequency and duration in 2025.
1 Details regarding the execution of year one of the Five-Year Reliability Plan and anticipated 2 activities in year two can be found in Appendix G. 3 4 The combined benefits of these programs and the positive impacts on the reliability of...
AI summary The document discusses the execution of the Five-Year Reliability Plan, including benefits and anticipated activities. It also outlines the establishment and progress of the CEATI Grid Resiliency Working Group, including survey development, terms of reference, and planning for a resiliency workshop.
to look for 30 ways to update its risk-based asset management approach to give consideration to 31 the economic impact of outages. Therefore, the Board directs NS Power to study 32 and report on the potential use of the VoLL metric in the...
AI summary The Board directs NS Power to study and report on the potential use of the VoLL metric in its reliability investment planning and capital approvals process, citing the need to consider the economic impact of outages. References are made to Board Orders related to the 2025 Annual Capital Expenditure Plan and Storm Cost Recovery Rider.
1 Plan, which is to be filed with Board by December 31, 2024. Similarly, it is likely 2 too late for the study report to be included with the 2025 ACE Plan application. As 3 such, the Board directs NS Power to provide a report on this VoLL...
AI summary The document discusses the need for NS Power to provide a Value of Lost Load (VoLL) assessment in its 2026 ACE Plan application and outlines NS Power's position on reliability metrics used in its Performance Standards reporting, emphasizing their effectiveness and industry standardization.
1 Electricity Canada which have included resiliency as a key focus for collaboration. An update on 2 CEATI’s Grid Resiliency working group, which NS Power is participating in, is provided above. 3 4 Based on the preliminary work for the CE...
AI summary NS Power is participating in the CEATI Grid Resiliency working group to develop metrics for system resiliency, such as Energy Not Supplied and Time to Restore Customers. While existing metrics like SAIDI and SAIFI are considered sufficient for now, NS Power supports the development of new metrics and engagement in the third-party review of the Five-Year Reliability Plan.
13 Date: December 12, 2025 Page 102 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan CONFIDENTIAL (Attachments Only) 1 Figure 60: Annual Atlantic Canada Outage Duration Annual Atlantic Canada Outage Duration 80.00...
AI summary The document presents a graph titled 'Annual Atlantic Canada Outage Duration' showing average outage duration in hours from 2015 to 2024. The data illustrates trends in outage durations over time, which may be relevant to energy reliability and infrastructure planning.
10.00 0.00 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 NS Power Atlantic Utilities 2 3 4 Figure 61 and Figure 62 below represent NS Power’s reliability statistics with Major and Extreme 5 Events (such as Hurricanes Dorian, Fiona, and...
AI summary The document discusses NS Power’s reliability statistics, showing improvements in SAIFI and SAIDI metrics due to reduced severe weather events and effective outage prevention initiatives. It also mentions the 2026 ACE Plan, which is marked as confidential.
N REMOVED) 2026 ACE Plan CONFIDENTIAL (Attachments Only) 1 Figure 61: NS Power Annual SAIFI (Major/Extreme Events Excluded) NS Power Annual SAIFI Major/Extreme Removed System Average Outage Frequency 3.00 2.50 2.00 1.50 1.00 0.50 0.00 2016...
AI summary The document presents figures showing NS Power's Annual SAIFI and SAIDI metrics from 2016 to 2025, excluding major and extreme events, illustrating trends in outage frequency and duration over time.
NS Power Annual SAIDI Major/Extreme Removed System Average Outage Duration (Hrs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 (Oct YTD) 5 6 7 Figure 63 and Figure 64 below represent NS Power’s r...
AI summary The document presents NS Power's reliability statistics, including SAIDI and SAIFI values, with and without Major/Extreme Events. It notes that no such events occurred between January 1 and October 31, 2025, resulting in identical SAIFI and SAIDI values for 2025. The 2026 ACE Plan is also mentioned as a confidential attachment.
ts Included) NS Power Annual SAIFI 7.00 System Average Outage Frequency 6.00 5.00 4.00 3.00 2.00 1.00 0.00 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 (Oct YTD) 3 4 5 Figure 64: NS Power Annual SAIDI (Major and Extreme Events Include...
AI summary The document presents graphical data on NS Power's annual SAIFI and SAIDI metrics from 2016 to 2025, highlighting system average outage frequency and duration, including major and extreme events.
cluded) NS Power Annual SAIDI 80.00 System Average Outage Duration (Hrs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 (Oct YTD) 6 7 8 The reliability performance for overall SAIFI and SAI...
AI summary The document discusses NS Power's reliability performance, noting that SAIDI and SAIFI are influenced by severe weather events. It also references the 2026 Annual Capital Expenditure (ACE) Plan, which is marked as confidential.
f 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan CONFIDENTIAL (Attachments Only) 1 2023) as a trend which is expected to continue into the future. However, NS Power’s typical 2 performance compares favourably with t...
AI summary The 2026 ACE Plan discusses NS Power's performance in terms of outages, noting that tree contacts and failed equipment are the leading causes of customer outages. Continued investment in vegetation clearing and other capital initiatives is expected to improve system reliability and resiliency.
1 2 Significant amount of customer hours from non-MED days due to adverse weather in certain years, 3 such as 2021 and 2022 are not excluded above and do contribute to the volume of tree contacts 4 experienced. Despite the increased freque...
AI summary The text discusses the impact of severe weather on power outages and NS Power's efforts to improve reliability through vegetation management and equipment upgrades. Despite increased weather challenges, there is a positive trend in reducing customer impact. Investments in transmission and distribution rights-of-way are highlighted as part of the 2026 ACE Plan.
and duration of outages caused by failed 29 equipment when compared to recent history. These years were also the most challenging years for 30 severe weather events. The increase in failed primary aerial conductors is believed to be attrib...
AI summary The 2026 ACE Plan discusses the impact of severe weather events on infrastructure reliability, noting increased failures in primary aerial conductors due to high wind stress. However, NS Power's targeted asset investments have improved equipment reliability, with 2025 showing a positive trend in reducing customer interruptions.
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 (Oct YTD) 12 13 Date: December 12, 2025 Page 110 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan CONFIDENTIAL (Attachments Only) 1 Figure 70: Annual Failed Equipme...
AI summary The document presents data on annual failed equipment and customer hours of interruption, with a focus on 2025 reliability data. It highlights the classification of outages caused by equipment failure by device type, as illustrated in Figure 71.
further look into the 2025 reliability data, outages caused by equipment failure can be 5 classified by device type. This is shown in Figure 71 below. 6 7 Figure 71: Customer Hours of Interruption Customer Hours of Interruption Device Type...
AI summary The document discusses outage data from October 2025, classifying customer hours of interruption by device type, with pin insulators and crossarms being the leading causes. It also references the 2026 Annual Capital Expenditure (ACE) Plan, which is marked as confidential.
1 All distribution capital projects and routines that replace deteriorated equipment are aimed at 2 sustaining or improving system reliability and contribute to the reduction of customer impacts due 3 to device failures referenced in the t...
AI summary The document discusses NS Power's efforts to improve system reliability through capital projects and storm response, addressing the impacts of changing weather patterns and climate risks. It outlines the use of the 2.5 Beta Method for classifying storm events and highlights the current performance metrics and capital programs for 2026.
1 level aimed at providing safe and reliable service, while ensuring affordability. To sustain or 2 improve reliability performance, NS Power follows its asset management principles to prioritize 3 investments in Energy Delivery equipment...
AI summary NS Power prioritizes capital investments in Energy Delivery equipment based on asset management principles, risk ratings, and asset condition to ensure safe, reliable, and affordable service. Replacement decisions are guided by asset age, performance degradation, and system reliability.
2026 ACE Plan C0080206 Page 2 of 5 JUSTIFICATION: Justification Criteria: Thermal Sub Criteria: Equipment Replacement/ Refurbishment Why do this project? NS Power conducts condition and risk assessment and analysis based on the annual boil...
AI summary NS Power is proposing the replacement of boiler components such as tubes, tube shielding, and tube locks to enhance system reliability, mitigate the risk of unplanned outages, and ensure safe and cost-effective operation. The project is necessary due to the increased risk of failures from degraded components and the potential for higher costs from emergency repairs.
ficient, and cost-effective operation of the boiler, while supporting sustained asset integrity and reliability of the asset and maintaining the operating license compliance. Why do this project now? The inspection, refurbishment, and repl...
AI summary The project involves the inspection, refurbishment, and replacement of boiler tubes and tube shields during scheduled outages to ensure safe, efficient, and reliable operation while maintaining compliance with industry standards. This is necessary due to the high temperatures, pressures, and abrasive conditions these components operate under, which make regular maintenance essential.
REDACTED 2026 ACE Plan C0080133 Page 2 of 5 excess of 50,000 hours since its last major inspection and will be due for overhaul in 2027 based on NS Power’s asset management strategy. Completing this project in a planned manner, assessing c...
AI summary The document discusses the planned refurbishment of the Intermediate Pressure (IP) turbine at Tufts Cove 3 (TUC3) during the 2027 outage to ensure continued safe and reliable operation, mitigate risks of unplanned outages, and align with NS Power’s asset management strategy. The project aims to reduce operational risks and maintain system reliability.
black start capability, 10-minute reserve, Volt-Ampere Reactive support and additional firm energy capacity to the NS Power electrical system. The unit was originally commissioned by NS Power in 1976 Summary of Related CIs +/- 2 years: Pur...
AI summary The document discusses the refurbishment of a gas turbine at Burnside to maintain essential ancillary services, citing wear and damage identified in a 2025 borescope inspection. The project is justified based on thermal criteria and equipment replacement needs to prevent unplanned outages and ensure system reliability.
ur operating units, which provide multiple benefits to NS Power and its customers. This unit, along with all the other combustion turbines, provides essential ancillary services to the system such as: • Peaking capacity – generation used t...
AI summary The text discusses the importance of maintaining four operational units at Burnside, highlighting their role in providing peaking capacity, black start capability, and fast-acting generation to support system reliability, especially with the integration of variable renewable energy sources like wind.
Original Equipment Manufacturer (OEM) procedures. Without this teardown, there remains a significant risk that hidden defects could evolve into unplanned unit failures. Why do this project this way? A “run to failure” strategy is not appro...
AI summary The document discusses the decision to refurbish an existing engine rather than replace it, citing risks of unplanned failures and the cost-effectiveness of refurbishment. It references the 2025 10-Year System Outlook and the Evergreen IRP scenario, emphasizing the need to maintain system reliability and align with the Province’s Clean Power Plan.
replace deteriorated assets that have been identified through NS Power’s transmission line inspection program. This project includes the replacement of deteriorated assets on a total of 72 structures. The project scope includes: - Structur...
AI summary The project involves replacing deteriorated assets on 72 transmission line structures to ensure the reliable operation of the transmission line and mitigate the risk of unplanned interruptions. The work is prioritized based on the condition of the assets and the criticality of the line to the overall system.
General Project Data A. Scope Project Scope of Work Description Defined (D) P P D D D Site Infrastructure (Access, Construction Power, Camp, etc.) Preliminary (P) NR P B. Capacity Voltage (kV) and Circuits Defined (D) P P D D D C. Project...
AI summary The document outlines general project data for an infrastructure project, detailing scope, capacity, location, requirements, technology selection, strategy, and planning. It specifies the status of various project components as defined or preliminary, and includes information on environmental monitoring and logistics.
result, the Bridgewater system continues to operate with both 4 kV and 12 kV networks, and the scope defined in this addendum remains essential to complete the transition initiated in the 2006 study. 4.0 SYSTEM CONDITIONS 4.1 Feeder Voltag...
AI summary The Bridgewater Area distribution system operates with a mix of 4 kV and 12 kV feeders, supplied from two substations. The mixed-voltage configuration increases maintenance complexity and limits operational flexibility. Nova Scotia Power aims to standardize the distribution system to 12 kV and 25 kV as part of its long-term strategy.
iorated transmission assets that have been identified through NS Power’s transmission line inspection program. This project includes the replacement of deteriorated assets on a total of 59 structures. The project scope includes: - Structur...
AI summary This project involves replacing deteriorated transmission assets identified through NS Power’s inspection program, including 12 structure replacements and others. The work is necessary to maintain system reliability and redundancy, and the project is prioritized based on asset condition and system criticality.
icates that replacing the unit with a new, higher-capacity transformer is the best approach. Overall, this project is crucial to maintain reliable, safe, and efficient power delivery to Mahone Bay. Date: December 12, 2025 Page 389 of 782 R...
AI summary This project involves replacing a transformer (76W-T1) to prevent unplanned failure and ensure reliable power delivery to Mahone Bay. The presence of ethylene in the main tank indicates internal degradation, and delaying replacement increases the risk of sudden failure. The project also aligns with the Town of Mahone Bay’s planned low-voltage infrastructure upgrades and NS Power’s asset management strategy.
f Retirement: Accounting Policy 6420 – Retirement and disposal of Capital Assets • Percentage of Asset Pool: 0.23% JUSTIFICATION: Justification Criteria: Transmission Plant Why do this project? The installation of the new switches will ena...
AI summary The project involves replacing two end-of-life switches (22N-603 and 22N-604) to enable live-line operation, reducing outages and improving reliability. The current switches are difficult to operate and their failure could lead to unplanned outages. A new ground grid and switches will allow more efficient operations and mitigate risks.
ng Station to the transmission grid, enabling the delivery of renewable hydroelectric energy. Its continued degradation poses operational, financial, and environmental risks. Why do this project now? The 96H-T1 transformer is consistently...
AI summary The document discusses the need to replace a transformer due to oil leaks and its location near a river, which poses environmental risks. Replacement is deemed necessary due to the transformer's degraded condition, lack of OEM support, and the cost-effectiveness of replacement over refurbishment.
for specific risks associated with additional overtime work that may be required to complete the project within the available outage window, and any unforeseen material or contract cost increases. Date: December 12, 2025 Page 406 of 782 RE...
AI summary This document discusses the replacement of four Pennsylvania circuit breakers on NS Power’s system, including the risks associated with additional overtime work and unforeseen cost increases. The project involves replacing one 69 kV and three 138 kV circuit breakers, which are considered high risk due to reliability concerns.
• 2025 CI C0061521 New Distribution Rights-of-Way Phase 10 $20,890,176 • 2027 CI TBD New Distribution Rights-of-Way Phase 12 $TBD • 2028 CI TBD New Distribution Rights-of-Way Phase 13 $TBD Depreciation Class: Distribution Plant - Land Righ...
AI summary This project involves establishing new distribution rights-of-way to support storm hardening and vegetation management, reducing outages by mitigating tree contact issues, particularly outside existing corridors. It aligns with NS Power’s Five-Year Reliability Plan and aims to improve system resilience during normal and extreme weather conditions.
outside existing corridors and contributes to the Plan’s goal of reducing SAIDI through targeted vegetation strategies that improve system resilience during both normal and extreme weather conditions. Tree contacts are a leading cause of o...
AI summary The text discusses the impact of tree contacts on power outages, highlighting that 80% of these contacts occur from trees outside the right-of-way. It outlines how establishing new rights-of-way can reduce such incidents by increasing the separation between trees and distribution feeders, contributing to the Plan’s goal of reducing SAIDI through improved vegetation management strategies.
Page 414 of 782 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan C0080266 Page 3 of 6 Completing this project has a direct, and immediate impact on the vegetative condition of the feeder being worked on. As the vegetative conditio...
AI summary This project improves the vegetative condition of distribution feeders, reducing the likelihood of tree-caused outages. The improvement is assessed using a 1 to 5 scale and is linked to reliability indicators like SAIFI and SAIDI. The project was recommended following a review of Post-Tropical Storm Arthur to enhance reliability during major storm events.
ility benefits during major storm events. As set out in NS Power’s February 13, 2015 Stakeholder Consultation Report, there was general stakeholder support for accelerating the sustainability program. A focus on removing trees within and a...
AI summary The document discusses a vegetation management program by NS Power to improve reliability during major storms by clearing trees in and along distribution rights-of-way. It outlines initiatives to widen and establish new rights-of-way, with a focus on enhancing reliability through proactive measures. The project is expected to be in-service by January 2026, with the final cost date set for August 2027.
General Project Data A. Scope Project Scope of Work Description Defined (D) P P D D D Site Infrastructure (Access, Construction Power, Camp, etc.) Defined (D) NR P D D D B. Capacity Voltage (kV) and Circuits Defined (D) P P D D D C. Projec...
AI summary The document outlines general project data, including scope, capacity, location, requirements, technology selection, strategy, and planning for a project. Key details cover infrastructure, voltage, environmental monitoring, right-of-way, and logistics planning, with various sections defined or not applicable.
Retirement and Disposal of Capital Assets • Percentage of Asset Pool: 0.01% JUSTIFICATION: Justification Criteria: Distribution System Sub Criteria: Deteriorated Conductor Why do this project? This project is designed to mitigate the circu...
AI summary This project aims to replace a severely deteriorated conductor and associated overhead components on a distribution line to mitigate circuit risk, improve reliability, and prevent unplanned outages. The conductor has reached the end of its service life and poses increased operational risks.
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan C0080612 Page 5 of 5 Legend: Inclusions: Date: December 12, 2025 Page 430 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan C0080111 Page 1 of 5 CI Number: C...
AI summary This document outlines the 2026 RTU Deployment project, which involves installing 21 Remote Terminal Units (RTUs) in Nova Scotia substations to improve grid operation and emergency response times. The project is part of General Plant function and has a forecasted cost of $8,322,655.
o Section 11.2 of the CEJC, related CIs for General Plant projects include “Work completed on the same asset (application, building, etc.).” • No other projects in 2024, 2025, 2026, 2027, or 2028 Depreciation Class: General Plant - Communi...
AI summary This text discusses a project to deploy RTUs as part of the Advanced Grid Modernization program, aimed at improving real-time visibility and remote operability, reducing SAIDI, and enhancing grid resilience. The project aligns with NS Power’s Five-Year Reliability Plan and contributes to improved outage response and system performance.
functionality and reducing time to restore through access to remote operations. Overall, this contributes to sustaining improvements achieved in customer reliability on NS Power’s distribution system. During severe weather events and other...
AI summary NS Power is implementing a project to improve system visibility and enable remote control of switching operations, enhancing reliability and response during severe weather events. This contributes to more efficient operations and faster restoration of services.
prietary Information Includes Description, PowerPlant (PP), Detailed Cost Estimate (DCE), and Economic Analysis Model (EAM) (or Total Cost of Ownership (TCO) for IT projects). (3) = System Security
AI summary The text references proprietary information related to power plant details, cost estimates, and economic analysis models. It also mentions system security as a key consideration.
ve advantages over other suppliers, and that could be advantageous in bidding or negotiation. Higher prices, or avoidable contractual constraints, will result in unnecessary higher costs to customers. NS Power seeks to keep the terms and c...
AI summary NS Power argues that keeping supplier pricing and arrangements confidential protects customers from higher costs and ensures competitive terms. Additionally, third-party proprietary information and system security, including one-line diagrams, are kept confidential for reliability and security reasons.
conomics (based on payback period, and revenue requirement); requirement to serve. Month DD, YYYY Page 13 of 54 Date: December 12, 2025 Page 478 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix D Page 26 o...
AI summary Nova Scotia Power Inc. evaluates technically justified IT projects based on customer impact, financial impact, compliance with regulations, and operational sustainability. The capital program includes essential projects for health, safety, regulatory compliance, service delivery, and risk mitigation. Projects improving customer reliability are assessed based on performance metrics like SAIDI, SAIFI, and CAIDI.
179 Nova ScoƟa Power Inc. Capital Planning & Capital Expenditure JusƟficaƟon Criteria Summary Document 17.0 Capital Expenditure JusƟficaƟon Criteria 17.1 IntroducƟon - General ConsideraƟons The following considera ons are used to evaluate...
AI summary Nova Scotia Power outlines criteria for justifying capital expenditures, emphasizing evaluation of alternatives, technology suitability, cost-effectiveness, compliance with reliability standards, and minimizing operational costs. The approach prioritizes meeting industry performance norms and selecting the least-cost option that satisfies requirements.
2026 ACE Plan Appendix D Page 61 of 179 Nova ScoƟa Power Inc. Capital Planning & Capital Expenditure JusƟficaƟon Criteria Summary Document Forced Outage Rate Unplanned outages result in replacement genera on, o en at a higher cost than the...
AI summary Nova Scotia Power Inc. outlines capital expenditure justification criteria, emphasizing unplanned outages' cost impacts via probabilistic production models. System design adheres to NPCC and NERC standards, with NERC requirements enforced through NSEB regulatory approval. Transmission criteria combine protection performance and system dynamics, ensuring compliance with single contingency design principles.
cts including project scope, jus fica on, budget, approvals and actual project informa on. The so ware can be used to research informa on on past projects and forecast project ac vity into the future. ProducƟon CosƟng Model: A system model...
AI summary The text defines key terms related to project management, capital expenditures, and system stability in energy operations. Concepts include routine capital items, safety projects, scope definitions, and the Special Protection System (SPS), which maintains system stability through load adjustments. A Production Costing Model is also described for forecasting energy costs.
istribu on, and Informa on Technology (IT), the process begins at the start of each year with the func onal groups compiling informa on about projects that require considera on for the following year. As this informa on is gathered, each f...
AI summary NS Power compiles project information annually into PowerPlan, a capital management system, with projects ranked using criteria like health and safety, environmental compliance, and system reliability. Projects are evaluated based on metrics such as SAIDI, SAIFI, and CAIDI, alongside regulatory and economic factors.
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix D Page 80 of 179 Nova ScoƟa Power Inc. Capital Planning & Capital Expenditure JusƟficaƟon Criteria Detailed Document Technically jus fied IT projects are broadly ranked usi...
AI summary Nova Scotia Power Inc. evaluates IT projects using criteria including customer impact, financial implications, compliance with regulations (e.g., NERC/CIP), and operational sustainability. Capital programs prioritize health/safety, regulatory compliance, service delivery, and risk mitigation, with economic initiatives assessed via performance metrics (SAIDI, SAIFI, CAIDI). Constraints include resource availability, maintenance cycles, and cash flow. Executive approval involves reviewing the ACE Plan.
ss than 1 in 75 operating years. Failure or occurrence is possible (26-75% ). Available data, past experience and Moderate Risk Acceptable Possible 3 or subject matter expert input indicates an expected occurrence rate between 1 in 10 and...
AI summary The text presents a risk assessment framework categorizing failure probabilities into high (1 in 75 to 1 in 1000), moderate (1 in 100 to 1 in 75), and low (1 in 10 to 1 in 100) operating years, with all risk levels marked as 'Acceptable'.
efit to customers while allowing NS Power to meet its objec ves. The capital planning cycle for any given year typically begins early in the preceding year and concludes at the filing of the ACE Plan. Although the oversight and management...
AI summary Nova Scotia Power Inc. (NS Power) outlines its capital planning process, emphasizing centralized oversight and annual ranking of projects based on health and safety, regulatory compliance, customer reliability (SAIDI, SAIFI), requirement to serve, and economic factors (NPV, ACHI). Projects are reviewed to align with strategic goals and ensure justification.
data and learnings, or aid in the development of business cases where applicable. Sub-JusƟficaƟon Criteria Innova on capital projects may be jus fied under one or more of the following sub-criteria: • reduce upward pressure on revenue requ...
AI summary The text outlines sub-justification criteria for innovation capital projects, focusing on reducing revenue requirement pressure, enhancing grid reliability, and improving customer experience. It emphasizes deploying proven technologies to lower operational costs, manage renewable integration challenges, and address reliability risks from weather events and power quality issues.
crea ng reliability and grid stability challenges that are difficult to address with tradi onal grid Month DD, 2025 Page 61 of 113 Date: December 12, 2025 Page 580 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan App...
AI summary Nova Scotia Power Inc. outlines capital expenditure criteria for addressing grid reliability challenges through innovative technologies like grid automation and energy storage. Projects must demonstrate potential to improve system stability or provide data for future deployment of new technologies.
dro, Wind and Biomass The principles set out hereunder shall be used by NS Power in determining the methods used and ming of purchase and replacement of its hydro, wind and biomass produc on assets. These produc on assets shall be purchase...
AI summary NS Power outlines principles for managing hydro, wind, and biomass production assets, including replacement conditions to address safety, legal compliance, economic benefits, reliability, and optimized investment timing. Economic justification procedures prioritize cost-effective solutions meeting operational and financial criteria.
wherein single con ngencies can poten ally adversely affect the interconnected NPCC system, are designed and operated in accordance with NPCC Directory 1, Design and Opera on of the Bulk Power System. NS Power is required to follow the stan...
AI summary NS Power adheres to NERC and NPCC standards for its Bulk Electric System, ensuring compliance through regulatory approval processes. System design criteria, including transmission and clearance times, are updated to meet evolving standards and are documented in report NS Power-TPR-003-6.
To maintain reliability and quality of supply to the distribu on bus. CondiƟons for Replacement Transmission plant shall be replaced, if s ll required to meet system design requirements, as follows: • Transmission poles which fail the test...
AI summary The text outlines conditions for replacing transmission infrastructure, including poles failing overturning moment tests, specific insulator types with cemented joints, and substation apparatus based on insulation degradation or calibration issues. Regular inspections and testing intervals are specified to ensure system reliability and safety.
er a significant por on of the circuit. Conductor replacement will be planned on the basis of predicted remaining life as established from experienced deteriora on rates. Note 1 – A database of conductor test results will be established. T...
AI summary The document outlines conductor replacement planning based on life expectancy analysis and environmental factors, and emphasizes annual outage data analysis to prioritize reliability improvements. It details Nova Scotia Power Inc.'s capital expenditure justification criteria for infrastructure upgrades.
2026 ACE Plan Appendix D Page 144 of 179 Nova ScoƟa Power Inc. Capital Planning & Capital Expenditure JusƟficaƟon Criteria Detailed Document The protec on of the distribu on plant and public and employee safety is provided in Distribu on E...
AI summary Nova Scotia Power Inc. outlines criteria for capital expenditures to protect distribution systems, ensuring safety, service continuity, and economic justification. The process evaluates costs for solutions like protective devices, reconductoring, and system upgrades, emphasizing cost-effective measures to prevent transformer/capacitor failures.
cepted based on system studies. System studies to determine adequacy and investment requirements must be conducted using the actual characteris cs (se ng and opera ng me) of exis ng protec on systems. DEFINITIONS 1. Normal system condiƟons...
AI summary The document defines technical terms related to system reliability, including normal system conditions, system elements, breaker backup, and single contingency. It is part of Nova Scotia Power Inc.'s 2026 ACE Plan Appendix D, focusing on capital planning and expenditure justification criteria.
protec on opera on. The term “Breaker failure protecƟon” is used interchangeably in this document. 4. Single conƟngency is defined as loss of one system element with or without a fault. Month DD, 2025 Page 105 of 113 Date: December 12, 202...
AI summary Nova Scotia Power Inc. outlines criteria for capital expenditure justification, emphasizing redundancy in primary transmission system protection, adherence to industry standards, and fault clearing times. Deviations require approval from the system planning group, with reliance on transient stability studies for exceptions.
nt stability studies, the following fault clearing mes will be applied to the Primary Transmission system. Any devia ons from these criteria must be submi ed to the system planning group for approval. a. For a three phase or phase to groun...
AI summary The text outlines fault clearing time criteria for the Primary Transmission system, specifying 4-16 cycle intervals based on fault type and protection requirements. Breaker failure protection is mandated for all Primary Transmission, with varying clearing times for local and remote breaker tripping scenarios.
e the fault described in item (d), the fault contribu on clearing me will be 16 cycles. Breaker failure protecƟon will be applied to all Primary Transmission. The design criteria are: 1. From normal system condiƟons, the Interconnected Tra...
AI summary The document outlines breaker failure protection for Primary Transmission and specifies design criteria ensuring system stability post-faults. It references Nova Scotia Power Inc.'s 2026 ACE Plan Appendix D and a detailed capital expenditure justification document.
2026 ACE Plan Appendix D Page 173 of 179 Nova ScoƟa Power Inc. Capital Planning & Capital Expenditure JusƟficaƟon Criteria Detailed Document No cascade tripping beyond elements cleared by the opera ve back-up protec on shall occur. 4. From...
AI summary Nova Scotia Power Inc. outlines capital expenditure justification criteria for system reliability, including no cascade tripping, voltage ranges within 90-110% nominal, fault management ensuring minimum post-fault voltage sags above 70% nominal, and automated tap-changer corrections. These criteria aim to maintain grid stability and reliability under contingency conditions.
ill be 14 cycles. c. Where breaker failure protec on is required to trip remote breakers to isolate the fault described in item a), the fault clearing me will be 16 cycles. d. For a three phase or phase to ground fault on any element direc...
AI summary The document outlines technical requirements for breaker failure protection, fault clearing times, and system stability criteria for the Interconnected Transmission System. It references the 2026 ACE Plan and Nova Scotia Power Inc.'s capital expenditure justification criteria, emphasizing system reliability and dynamic response standards.
2026 ACE Plan Appendix D Page 175 of 179 Nova ScoƟa Power Inc. Capital Planning & Capital Expenditure JusƟficaƟon Criteria Detailed Document line-to-ground fault on any one system element cleared in prime me. No cascade tripping shall occu...
AI summary The 2026 ACE Plan Appendix D outlines Nova Scotia Power Inc.'s capital planning and expenditure justification criteria, emphasizing system stability, fault clearance, and voltage management. Requirements include preventing cascade tripping, maintaining voltage within 90-110% of nominal, and ensuring load reduction within 10 minutes post-fault. These criteria aim to ensure grid reliability and compliance with operational standards.
shall be within 110% of their thermally limited ra ngs under the condi on that the System Operator can take ac on within a 10 minute period to reduce load on the element. 3. From normal system condiƟons, for any single conƟngency, steady-s...
AI summary The document outlines technical requirements for system reliability, including voltage limits (90-110% of nominal), fault management provisions, breaker backup for remote transmission, and transformer capacity standards to meet daily load demands under normal conditions and during generation outages.
adial transmission line results in loss of supply with no other way to connect the radial load to the grid. A single transmission line may have more than one radial load connected to it. A lone substa on, which is dedicated to a single cus...
AI summary The document outlines procedures for managing radial loads exceeding 40 MW, including planning studies, load reduction measures, line upgrades, and the evaluation of a second transmission line for loads over 60 MW to enhance reliability.
ependent Electricity System Operator (IESO Nova Scotia). This next IRP will provide an 26 updated framework for evaluating the MHS, incorporating refreshed assumptions on load growth, 27 emissions targets, resource costs, and system integr...
AI summary The upcoming 2025/2026 Integrated Resource Plan (IRP) will evaluate the Mersey Hydro Station (MHS), incorporating updated assumptions on load growth, emissions targets, resource costs, and system integration. No final decisions on decommissioning or redevelopment of MHS will be made until the IRP provides direction, ensuring alignment with provincial energy policy and system reliability needs.
2026 ACE Plan Appendix F Page 4 of 55 The Path to 2030 – 2025 Update Non-Confidential 1 TABLE OF FIGURES 2 3 Figure 1 - 2030 Clean Power Plan Resources ................................................................................. 6 4 F...
AI summary The appendix lists figures related to Nova Scotia's 2030 Clean Power Plan, including project statuses for renewable energy initiatives, battery storage (Bridgewater BESS), and coal retirement timelines. It outlines the 2025 10-Year System Outlook Report and tracks progress on the Green Choice Program, PHP Wind, and Minas Highlands Wind projects.
: 30 31 • The 2030 Decarbonization Goals 32 • The Province of Nova Scotia’s 2030 Clean Power Plan 33 • Creation of the Independent Energy System Operator of Nova Scotia (IESO-NS) Page 8 of 55 Date: December 12, 2025 Page 661 of 782 REDACTE...
AI summary The document outlines Nova Scotia's 2030 Clean Power Plan, the Integrated Resource Plan (IRP) Action Plan, and the creation of the Independent Energy System Operator of Nova Scotia (IESO-NS). It details resource development, project management, and timelines for meeting decarbonization goals.
2026 ACE Plan Appendix F Page 36 of 55 The Path to 2030 – 2025 Update Non-Confidential 1 2 The 2025 10-Year System Outlook reinforces that the phase-out of coal generation continues to 3 be dependent on the successful procurement and commi...
AI summary The 2025 10-Year System Outlook emphasizes reliance on new firm capacity resources like combustion turbines to phase out coal generation. Specific units (Lingan 1, 2, 3; Trenton 5, 6; Point Aconi) have defined retirement or conversion dates, with Lingan 1 and 3 converting to HFO operation and Lingan 2 in Cold Reserve. Dates will be re-evaluated as resource timing, demand, and policy evolve.
2030 Accountability NS Power Key Action IESO-NS NS Government Partner Key Projects Items Action Items Key Action Items Action Items • Implementation of TPIF and associated Network Upgrades. Battery IESO-NS and • Procure and finance • Procu...
AI summary The document outlines key actions by NS Power and IESO-NS for 2030, including implementing TPIF and network upgrades, procuring 150 MW/600 MWh battery storage via regulated utility models, and transitioning grid stability responsibilities. Partnerships with IPPs and the NS Government are emphasized for energy storage procurement and grid-scale projects.
2030 Accountability NS Power Key Action IESO-NS NS Government Partner Key Projects Items Action Items Key Action Items Action Items procurements for required products and services. Hybrid NS • Provide detailed load • Participate in • Deliv...
AI summary The text outlines collaborative efforts between NS Power, IESO-NS, and the NS Government on projects like Hybrid Peak management, load studies, and reliability initiatives. Key actions include load management studies, participation in sector studies, and development of demand response programs. NB Power is noted for enabling reliability work.
1 project delays. Talent shortages have the potential to affect NS Power, its partners 2 across the province, and its contractors and suppliers. 3 4 4. Project Approvals 5 • 2025 Trend: No Change 6 • The 2030 Clean Power Plan requires the...
AI summary The text highlights project delays due to talent shortages impacting NS Power and partners, the need for approvals under the 2030 Clean Power Plan, risks in transitioning to fast-acting generation by 2027-28, and the publication of the Clean Electricity Regulations (CER) aligning with Nova Scotia policy. Key issues include environmental and regulatory approvals, procurement challenges, and renewable energy targets.
2026 ACE Plan Appendix G Page 2 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The 2026 Annual Capital Expenditure (ACE) Plan Appendix G outlines NS Power's Five-Year Reliability Plan update, focusing on infrastructure and system reliability measures.
1 TABLE OF CONTENTS 2 3 1.0 INTRODUCTION .............................................................................................................. 6 4 1.1 Five-Year Reliability Plan Commitment.............................................
AI summary The document outlines a five-year reliability plan focusing on vegetation management, storm hardening, and targeted equipment upgrades. It emphasizes wildfire mitigation, corridor widening, and tree trimming to enhance grid resilience. Section 3.0 highlights the 2025 overview as the first year of the plan, while sections 4.0–4.5 detail vegetation management strategies and infrastructure improvements.
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix G Page 3 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The document is a non-confidential appendix to the 2026 Annual Capital Expenditure (ACE) Plan, focusing on an update to Nova Scotia Power's Five-Year Reliability Plan. The content is redacted, but the title indicates a regulatory proceeding related to reliability planning and capital expenditures.
2026 ACE Plan Appendix G Page 3 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The 2026 ACE Plan Appendix G outlines an update to NS Power's Five-Year Reliability Plan, focusing on capital expenditures and system reliability. The document is non-confidential and part of a broader regulatory proceeding related to Nova Scotia's energy infrastructure.
1 6.1.2 Downline Connectivity ............................................................................. 45 2 6.2 Fault Location Isolation and Service Restoration ................................................. 47 3 6.3 Distributed En...
AI summary The document outlines Nova Scotia Power's 2026 Five-Year Reliability Plan, focusing on storm hardening through vegetation management, corridor widening for distribution/transmission lines, equipment upgrades, and advanced grid modernization programs including connected assets and infrastructure improvements.
................................ 62 17 7.3.1 Connected Assets ...................................................................................... 62 18 7.3.2 Fault Location Isolation and Service Restoration ................................
AI summary The document outlines sections of a reliability plan update by NS Power, focusing on connected assets, fault location isolation, and distributed energy resources (DERs). Appendices detail priority feeders and pole monitoring projects, while the 2026 ACE Plan Appendix G is referenced as part of the non-confidential update.
1 LIST OF FIGURES 2 3 Figure 1: Forecast Investment by Reliability Program 2025-2029 ($ millions) ............................. 7 4 Figure 2: Contribution to CHI by Outage Cause (2020 – 2024) Performance Standards ............11 5 Figure 3...
AI summary The document outlines a list of figures related to reliability programs, vegetation management, corridor widening, and rights-of-way establishment in Nova Scotia. Key themes include reliability investments, outage cause analysis, customer interruption metrics (CHI), SAIDI improvement targets, and infrastructure planning initiatives for 2025.
............................... 26 18 Figure 13: Map of 2025 Completed and Planned Establishment of New Rights-of-Way ........... 27 19 Figure 14: Trimming and Removal of Trees Around Existing Powerlines - 2025 ....................... 28 2...
AI summary The document outlines NS Power's 2025 infrastructure projects, including rights-of-way establishment, tree trimming, equipment upgrades, and transmission work. It references the Five-Year Reliability Plan update and the 2026 ACE Plan Appendix G, focusing on grid modernization and reliability improvements.
2026 ACE Plan Appendix G Page 5 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The 2026 ACE Plan Appendix G outlines updates to NS Power's Five-Year Reliability Plan, focusing on reliability improvements and infrastructure planning. The document is part of a non-confidential regulatory proceeding.
hase Extension Projects by Region .............................. 58 17 Figure 42: Illustration of Targeted NS Power Transmission Projects Planned for 2026 ............. 61 18 Figure 43: 2026 Substation Transformers Planned Replacement/Addi...
AI summary NS Power outlines its commitment to improving grid reliability and resiliency through a $1.3 billion five-year investment plan, with $206 million allocated for 2025. The plan aims to reduce outage duration and frequency while balancing affordability for customers.
ments 8 detailed in year one of the Plan. The Plan has a goal of reducing the overall duration and frequency 9 of outages while balancing the affordability of these investments for customers. 10 11 1.1 Five-Year Reliability Plan Commitment...
AI summary NS Power's Five-Year Reliability Plan aims to reduce outage duration and frequency through three core programs: vegetation management, storm hardening, and grid modernization. The plan balances reliability improvements with customer affordability, focusing on infrastructure upgrades and advanced grid technologies.
2026 ACE Plan Appendix G Page 7 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The 2026 ACE Plan Appendix G outlines NS Power's Five-Year Reliability Plan, focusing on infrastructure and capital expenditures. The document is non-confidential and part of a regulatory proceeding related to energy reliability and planning.
1 2 As shown in Figure 1 below, NS Power’s Plan includes approximately $1.3 billion of investment 3 in the 2025-2029 period with a commitment to $206 million of investment in 2025 and $234 4 million in 2026. 5 6 Figure 1: Forecast Investme...
AI summary NS Power outlines a $1.3 billion investment plan (2025-2029) targeting grid resilience and reliability improvements, including $206M in 2025 and $234M in 2026. Goals include reducing SAIDI by 20% and achieving 91.98% service restoration within 48 hours post-major events.
tain 21 extent also from extreme weather events like hurricanes. The system is already responding 22 positively to this work with an observed improvement to performance standards metrics. As of Page 7 of 71 Date: December 12, 2025 Page 715...
AI summary NS Power's Five-Year Reliability Plan update highlights improvements in system performance metrics, driven by efforts to address reliability challenges and extreme weather impacts like hurricanes. The 2026 ACE Plan Appendix G outlines ongoing reliability initiatives and their outcomes.
2026 ACE Plan Appendix G Page 8 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The document outlines NS Power's 2026 Annual Capital Expenditure (ACE) Plan Appendix G, focusing on the Five-Year Reliability Plan update. It highlights efforts to ensure grid reliability through infrastructure investments and operational strategies.
1 October 31, there is a 53 percent reduction in customer interruptions and a 29 percent reduction in 2 customer hours of interruption due to device failure in 2025 over 2023 levels. 3 4 The benefits of the program and the impact on the re...
AI summary NS Power outlines reliability improvements through targeted investments, citing a 53% reduction in customer interruptions by 2025. The Board directed NS Power to update its 2025 ACE Plan (M12012) with progress on its Five-Year Reliability Plan, emphasizing risk-based decision-making and grid-modernization upgrades. NS Power agrees with stakeholders on balancing reliability and affordability.
1 2.0 RELIABILITY PERFORMANCE ANALYSIS 2 3 NS Power has developed the Plan to deliver a 20 percent improvement in the performance 4 standards overall average duration of outages (SAIDI) and to achieve the Performance Standards 5 SAIFI targ...
AI summary NS Power's Plan aims to improve system reliability by reducing outages caused by tree contacts and equipment failures, targeting a 20% improvement in SAIDI and achieving a SAIFI target of 2.05 by 2029. Grid modernization, including RTUs and remote connectivity, will mitigate outage impacts and enhance fault isolation.
ion capabilities will 21 further mitigate the impact of these outages when they occur by reducing the customers affected 22 by an event and allowing faults to be isolated and located faster. 23 Page 10 of 71 Date: December 12, 2025 Page 71...
AI summary NS Power's Five-Year Reliability Plan Update includes a breakdown of outage causes (2020–2024), with tree contacts contributing 33% to Avoided Customer Hours of Interruption (ACHI). Key factors include defective equipment (18%), transmission system losses (18%), and foreign interference (11%). The plan aims to enhance reliability through targeted mitigation strategies.
Environment 1% Human Element 0% 0% 5% 10% 15% 20% 25% 30% 35% 2 3 4 2.1 Demonstrated Vegetation Program Impacts 5 6 Figure 3 below shows the Performance Standards annual customer hours of interruption due to 7 tree contacts for 2020-2025 P...
AI summary The vegetation management program is reducing outage frequency and duration, with benefits expected to grow as rights-of-way are widened. Figure 3 illustrates projected annual customer hours of interruption due to tree contacts from 2020-2025, showing positive trends in system reliability improvements.
3,500 700,000 3,000 600,000 2,500 500,000 2,000 400,000 1,500 300,000 1,000 200,000 100,000 500 - - 2020 2021 2022 2023 2024 2025 (Projected) Customer Hours Projected Outage Event Count Projected 4 5 6 2.2 Distribution Targeted Devices 7 8...
AI summary Figure 4 illustrates trends in customer hours of interruption and outage frequency from 2020 to 2025, showing reductions attributed to distribution equipment upgrades and storm hardening initiatives. Projections for 2025 include actual data through October and estimates for November-December based on historical performance.
025 based on the prior five years’ performance. Storm hardening initiatives and 13 equipment upgrades are core elements of the plan, which will continue to build on these positive 14 trends. 15 Page 12 of 71 Date: December 12, 2025 Page 72...
AI summary NS Power's Five-Year Reliability Plan emphasizes storm hardening and equipment upgrades to improve system reliability. Performance standards target reducing Annual Customer Hours of Interruption (CHI) from equipment failures, with metrics shown in Figure 4.
1,000.00 100,000 500.00 - - 2020 2021 2022 2023 2024 2025 (Projected) Customer Hours Projected Outage Event Count Projected 3 4 Page 13 of 71 Date: December 12, 2025 Page 721 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026...
AI summary The document references an update to Nova Scotia Power's Five-Year Reliability Plan as part of the 2026 ACE Plan Appendix G. It includes projected reliability metrics and outage event counts for 2020–2025, though specific data is redacted. The plan update is part of Nova Scotia's multi-year reliability and capital expenditure planning cycle.
2026 ACE Plan Appendix G Page 14 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The document is an update to the NS Power Five-Year Reliability Plan, part of the 2026 Annual Capital Expenditure (ACE) Plan. It outlines reliability initiatives and capital investments for Nova Scotia's electricity system.
1 3.0 2025 Overview – Year One of Five Year Reliability Plan 2 3 In 2025, NS Power’s Reliability team has been focused on executing the projects identified in year 4 one of the Plan, with $206.6 million committed to strengthen the grid and...
AI summary NS Power's 2025 reliability efforts focused on $206.6 million in grid upgrades, including distribution system improvements like replacing insulators, conductors, and transformers, as well as tree clearing to enhance resilience against weather events and support growing energy demand.
2026 ACE Plan Appendix G Page 15 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 • Addition of six RTUs improving substation communication and control, supporting 2 quicker response and restoration of service in the e...
AI summary NS Power's 2026 ACE Plan Appendix G outlines infrastructure upgrades to enhance grid reliability, including RTU additions, substation transformer replacements, new substation construction in Mount Uniacke, transmission structure work, and reconductoring of 33.7 km of transmission lines to improve resilience and winter peak capacity.
D REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix G Page 16 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential Reliability Targeted 2025 Planned 2025 Completed to 2025 Anticipated YE Result Program Progr...
AI summary The document outlines NS Power's Five-Year Reliability Plan update, including targeted strategies, 2025 investment plans, completion dates, and program status. It focuses on reliability programs and capital expenditures for system reliability.
n and ongoing in Service 2026 Restoration (FLISR) 1 Due to careful management of resources, vegetation management team was able to exceed the planned kms while 2 remaining within the $45 million overall budget. 3 This project is on track f...
AI summary NS Power's vegetation management team exceeded planned kilometers while staying within a $45M budget, with the project on track for 2026 completion. Early 2025 SAIDI performance reflects initial outcomes from the Five-Year Reliability Plan, though the plan remains in its early implementation phase.
NS Power Five-Year Reliability Plan - Update Non-Confidential 1 provide a snapshot of reliability performance to date, including positive trends for vegetation and 2 defective equipment, it is important to recognize that the full impact of...
AI summary NS Power's Five-Year Reliability Plan Update highlights current reliability performance, noting improvements in vegetation management and defective equipment. The plan projects achieving a SAIDI target of 4.10 by 2029, with Figure 6 illustrating the projected path to a 20% improvement in SAIDI over the program's duration.
4 3 2 1 0 2024 2025 2026 2027 2028 2029 SAIDI Actual Projected SAIDI Average SAIDI (2019 - 2023) 2029 5YR Plan Target Performance Standards Target 9 10 11 3.2 2025 Priority Feeders Update 12 13 Please refer to APPENDIX A: 2025 Highest Prio...
AI summary The document discusses NS Power's Five-Year Reliability Plan Update, focusing on targeted reliability improvements for priority feeders identified in Appendix A. It emphasizes data-driven approaches to address feeder conditions and performance, aligning with projected SAIDI (System Average Interruption Duration Index) targets and reliability standards.
2026 ACE Plan Appendix G Page 18 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 All feeder plans for 2025 are underway or complete; work will continue on all in progress work 2 until completed. 3 4 APPENDIX B: Work C...
AI summary NS Power's 2026 ACE Plan Appendix G outlines progress on 2025 feeder reliability initiatives, noting that all plans are underway or complete. Appendix B summarizes completed and ongoing work, indicating which feeders remain on the 2026 priority list. Multi-year projects are planned for select feeders to enhance reliability and mitigate outage risks.
2026 ACE Plan Appendix G Page 19 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 4.0 STORM HARDENING – VEGETATION MANAGEMENT 2 3 2025-2029 Forecast Investment: $265.0 million 4 Estimated Performance Standards SAIDI Re...
AI summary NS Power's 2025-2029 Storm Hardening Vegetation Management Plan allocates $265 million for reducing tree-related outages, targeting a 0.70–1.25 hour SAIDI reduction. Daily operations involve 75 crews clearing trees from distribution and transmission ROWs, with strategies including corridor widening and trimming.
2026 ACE Plan Appendix G Page 20 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 Figure 7: Vegetation Management Year One Reliability Plan Results $ Kms Additional Program Planned Completed Kms Status (M) Forecast to...
AI summary The NS Power Five-Year Reliability Plan Update includes Figure 7, which compares planned and completed vegetation management work in Year One, showing progress against targets and program status. The table highlights planned kilometers, completed kilometers, and additional kilometers forecasted for completion by the year-end.
be Completed by YE Distribution 12.5 183 59 Corridor Widening Transmission 3.0 105 15 Corridor Widening Establishment 16.4 229 89 of New Rights-of-Way Trimming and 6.9 205 55 removal of trees 2 3 As of October 31, 2025 NS Power has complet...
AI summary NS Power has completed 617 km of distribution and 105 km of transmission vegetation management by October 2025, including rights-of-way establishment, hazard tree removal, and aerial pruning. These efforts aim to improve system reliability and reduce vegetation-related outages, informed by satellite-based assessments of distribution rights-of-way.
of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix G Page 21 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 This enhanced detail of vegetation condition is used to improve the Company’...
AI summary NS Power's Five-Year Reliability Plan update utilizes enhanced vegetation condition data to guide risk-based interventions. Figure 8 illustrates regional progress in distribution vegetation management, showing spans cleared and ROW treated as of October 2025.
nt work programs. 5 6 Figure 8: 2025 (YTD End of October) Distribution Vegetation Management Completed by 7 Region Region Distribution Vegetation Management Spans Kms Metro 1,114 61 NE 3,913 217 CB 1,874 104 West 4,230 235 Total 11,131 617...
AI summary NS Power adjusted its 2025 vegetation management program due to provincial restrictions from the Department of Natural Resources (DNR) imposed during drought and wildfire conditions in 2025. Restrictions included halting heavy equipment operations during extreme fire weather and conducting fire watches, leading to revised work prioritization and scheduling to maintain reliability while complying with safety protocols.
rating under the DNR restrictions resulted in a safe, managed approach to working in forested 22 areas during the period of heightened wildfire risk but did result in a reduction in the number of Page 21 of 71 Date: December 12, 2025 Page...
AI summary NS Power's Five-Year Reliability Plan Update notes that DNR restrictions reduced vegetation management in 2025, with work reprioritized for 2026. This adjustment aligns with wildfire risk mitigation strategies but impacts the volume of managed vegetation, as illustrated in Figures 9 and 12.
4 4.1 Wildfire Mitigation 5 6 NS Power actively engages with wildfire risk stakeholders across Nova Scotia to inform and 7 prioritize reliability and vegetation management initiatives. As part of NS Power’s Wildfire 8 Mitigation Plan, whic...
AI summary NS Power collaborates with stakeholders on wildfire mitigation, including community-specific risk assessments and accelerated vegetation management. In 2025, 11 km of rights-of-way management was prioritized in Glen Haven and Grand Lake, while emergency resources were deployed during the Long Lake wildfire to remove fire-compromised trees.
argeted 27 vegetation management activities. This originally unplanned work focused on removing fire- 28 compromised trees at risk of falling into conductors and widening over 6.5 kilometers of Page 22 of 71 Date: December 12, 2025 Page 73...
AI summary NS Power's 2026 ACE Plan Appendix G details $66 million in 2025-2029 investments for distribution corridor widening and vegetation management to enhance wildfire mitigation and system reliability. 183 km of corridor widening completed, with 59 km planned by year-end, impacting 35 communities.
Planned Completed (Due to Wildfire on Track Kms YTD Mitigation) Kms (Y/N) Distribution Corridor 297 183 242 Widening with Managed Rights-of-Way 19 20 Figure 10 below illustrates the locations where distribution rights-of-way have been wide...
AI summary The document outlines NS Power's infrastructure projects to widen distribution and transmission corridors with managed rights-of-way, aiming to improve reliability by increasing separation between conductors and forest edges. It details $15 million in 2025-2029 forecast investments for transmission corridor widening, with $3 million anticipated for 2025 year-end spending.
NS Power Five-Year Reliability Plan - Update Non-Confidential 1 Figure 13: Map of 2025 Completed and Planned Establishment of New Rights-of-Way 2 3 4 4.5 Trimming and Removal of Trees Around Existing Power Lines 5 6 2025-2029 Forecast Inve...
AI summary NS Power's 2025 vegetation management efforts include aerial pruning, customer-requested trimming, and corridor maintenance, with $98M forecasted investment. 205 km of trimming completed, exceeding the 55 km year-end target to mitigate reliability risks.
Planned Year to Date Plan Track Kms Kms (Y/N) Trimming and Removal of 177 205 260 Trees Around Existing Powerlines 6 7 Figure 15 illustrates the geographic distribution of completed vegetation work in this category, 8 with a significant co...
AI summary NS Power's Five-Year Reliability Plan Update highlights efforts to reduce tree-related outages through targeted vegetation management, including trimming and removal of trees near powerlines. Urban areas with constrained right-of-way (ROW) expansion show significant work, while expanded ROWs in Shelburne, Trenton, and Little Harbour improve reliability and safety by increasing visibility for maintenance.
9 contacts with lines but also enhances the visibility to overhead equipment during feeder inspections 10 and outage restoration efforts, supporting both reliability and safety objectives. 11 Page 29 of 71 Date: December 12, 2025 Page 737...
AI summary NS Power's Five-Year Reliability Plan Update highlights infrastructure improvements, including enhanced visibility for equipment during inspections and outage restoration, aimed at improving reliability and safety. Figures illustrate project progress at specific locations.
ge 739 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix G Page 32 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 Figure 18: 2025 Targeted Equipment Upgrades Progress Overview Program...
AI summary NS Power outlines its 2025 targeted equipment upgrades, including $81 million in distribution and transmission system investments. Key initiatives focus on replacing aging infrastructure, expanding protective devices, and ensuring environmental compliance to enhance system reliability and customer experience.
17 These efforts are part of NS Power’s ongoing commitment to improving system reliability, 18 enhancing customer experience, and supporting a more resilient energy future for the province. 19 Page 32 of 71 Date: December 12, 2025 Page 740...
AI summary NS Power's Five-Year Reliability Plan focuses on upgrading aging equipment like poles, transformers, and regulators to reduce outages, improve safety, and comply with federal regulations. The PCB program exemplifies this approach, aligning with asset management strategies and reliability goals.
, as well as improve 9 worker and public safety. The PCB program exemplifies this approach and continues to progress 10 on schedule, remaining compliant with federal regulations and timelines. 11 12 5.1.2 Power Line Protective Devices 13 1...
AI summary The document discusses NS Power's 2025 recloser installation plan, highlighting progress on seven new devices to improve grid reliability by reducing outage frequency and duration. Three reclosers are completed, with four remaining for installation, targeting key regions like Canso, Merigomish, and Glace Bay.
eted Cape Breton 22C-404 Isle Madam On Track Cape Breton 81S-303 Glace Bay, Port Morien On Track Metro 127H-411 Waverley and Fall River Completed West 55V-314 Berwick, Aylesford and Burlington On Track West 55V-314 Berwick, Aylesford and B...
AI summary NS Power has completed 15 of 16 planned Trip Saver installations for 2025, with the final unit scheduled for December 2025. These devices improve distribution system reliability by rapidly isolating faults and reducing outage duration. Figure 20 details regional progress, including 3 completed installations in the East region.
standards to align with the current CSA 21 C22.3 overhead line standards. In the Board’s decision on the 2025 Annual Capital Expenditure 22 (ACE) Plan (M12012), the Board directed the following: Page 35 of 71 Date: December 12, 2025 Page 7...
AI summary The Nova Scotia Energy Board directed NS Power to monitor upgraded pole installations and evaluate their impact on system reliability, aligning with the 2025 ACE Plan (M12012). Appendix C details pole monitoring projects across regions, focusing on resilience improvements and outage reduction.
dentifies the region, feeder, 9 location, and the number of poles scheduled for upgrade to the new class standard. These assets 10 will be monitored on an ongoing basis following storm events. 11 12 5.1.3 Distribution System Build to Roads...
AI summary NS Power's Distribution System Build to Roadside program aims to enhance reliability by relocating distribution lines to roadside locations, reducing tree-related contacts. In 2025, the program exceeded its 8 km target, completing 8.8 km and advancing 2 km of additional work, improving infrastructure accessibility and outage management.
7 Re-Prioritized Exceeded – Ongoing West 1.0 4.8 Projects In Progress 2 3 5.1.4 Distribution System Conductor Upgrades 4 5 The Distribution Conductor Upgrades program is a proactive initiative aimed at replacing aging 6 infrastructure to r...
AI summary NS Power's Distribution Conductor Upgrades program aims to replace aging infrastructure, improving reliability and resilience. In 2025, 73.7 km of distribution lines were reconductored, exceeding the 39 km target. An additional 4.5 km is planned for completion by year-end, with regional breakdowns provided in Figure 22.
ge 746 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix G Page 39 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 2 Figure 23: 2025 Completed Padmount Transformer Replacements and Upg...
AI summary NS Power outlines its 2025-2029 transmission system upgrade plan, allocating $196 million over five years and $32.6 million for 2025 alone. Projects focus on replacing structures, reinforcing conductors, and realigning lines to enhance reliability and resiliency, informed by risk profiles and past performance.
2026 ACE Plan Appendix G Page 42 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 2 NS Power has purchased and received a spare substation transformer. Replenishing this spare unit 3 supports the overall NS Power Trans...
AI summary NS Power is updating its Five-Year Reliability Plan by acquiring spare transformers, advancing substation projects (Bayers Lake, Stellarton), and completing the Mount Uniacke substation. These actions aim to improve system reliability and capacity while managing inventory costs.
2026 ACE Plan Appendix G Page 43 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 6.0 ADVANCED GRID MODERNIZATION PROGRAMS 2 3 2025-2029 Forecast Investment: $78 million 4 Forecasted Performance Standards SAIDI Reducti...
AI summary NS Power's Advanced Grid Modernization Program (2025-2029) aims to enhance grid reliability and efficiency through three initiatives: Connected Assets (real-time device control), FLISR (automated outage response), and DER integration. The $78 million investment targets a 0.06-0.11 SAIDI reduction.
RTUs planned for deployment in 2025. The remaining units are in progress and remain a priority 18 to have two completed before year-end, and the final three installations to be completed early in Page 44 of 71 Date: December 12, 2025 Page...
AI summary NS Power outlines its 2025 RTU deployment plan, with Phase 6 under regulatory review. The company emphasizes its commitment to the Board's oversight in ensuring project value for customers. Progress updates include completed and on-track installations across multiple substations, with final installations targeted for early 2026.
Complete West Kingston 63V Complete West Ohio Road 25W Complete West Central Argyle 19W On Track West Wolfville Ridge 83V Complete West Indian Path 80W On Track 7 8 6.1.2 Downline Connectivity 9 10 2025-2029 Forecast Investment: $44 millio...
AI summary The document outlines infrastructure projects with statuses (e.g., 'Complete', 'On Track'), a $44M 2025-2029 investment forecast, and a $5.2M 2025 investment. It references a cost reasonableness review (M12588) for NS Power's RTU Replacements Program and the 2026 ACE Plan Appendix G. The NS Power Five-Year Reliability Plan Update is also mentioned.
129H In Design. Metro Kearney Lake (multiple devices) Planned for 2026 Execution Metro Hammonds Plains 137H In Design. Page 46 of 71 Date: December 12, 2025 Page 754 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan...
AI summary The document outlines the NS Power Five-Year Reliability Plan update, detailing projects in various regions (e.g., Metro, Armdale, Kempt Rd) with statuses like 'In Design' and 'Planned for 2026 Execution.' It highlights infrastructure planning for reliability improvements.
aditional centralized dispatch as evidenced by growing numbers of net-metered connections. This 24 shift introduces new complexities for power utilities, particularly with respect to maintaining Page 47 of 71 Date: December 12, 2025 Page 7...
AI summary The document discusses NS Power's Five-Year Reliability Plan update, highlighting challenges from increasing net-metered connections and their impact on centralized dispatch and grid reliability. It emphasizes complexities for power utilities in maintaining system reliability amid distributed energy resource growth.
with the province’s 2030 17 Clean Power Plan, and is intended to ensure DERs are deployed in a manner that enhances system 18 reliability, supports decarbonization, and delivers customer value. Page 48 of 71 Date: December 12, 2025 Page 75...
AI summary The text references the province’s 2030 Clean Power Plan, emphasizing the deployment of DERs to enhance system reliability, support decarbonization, and deliver customer value. It also mentions an update to NS Power’s Five-Year Reliability Plan and Appendix G of the 2026 ACE Plan.
2026 ACE Plan Appendix G Page 49 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 7.0 2026 – YEAR TWO – FIVE-YEAR RELIABILITY PLAN 2 3 2026 is year two of the Five-year Reliability Plan. NS Power has committed to an ov...
AI summary NS Power's 2026 reliability plan allocates $234 million for grid improvements, including storm hardening ($178.9M), vegetation management ($45M), and advanced grid modernization ($10.7M). This follows $206M in 2025 and over $185M annually in prior years, focusing on corridor widening, ROW establishment, and tree trimming.
Transmission System Upgrades 28 lines Substation Upgrades and 8 Transformers Replacements Remote Terminal Units (RTUs) 8 RTUs Downline Connectivity 35 Devices Advanced Grid Modernization Fault Location Isolation and 24 Devices Service Rest...
AI summary The 2026 ACE Plan Appendix G outlines NS Power's priority transmission system upgrades, including substation upgrades, RTUs, and FLISR devices. The 2026 priority feeder list includes 40 feeders, 31 newly identified and 9 carried over from 2025, based on outage data and load growth analysis. The list may be revised following full 2025 outage data analysis.
age 759 of 782 REDACTED REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026 ACE Plan Appendix G Page 52 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 7.1 STORM HARDENING – VEGETATION MANGEMENT 2 3 2026 Forecast Investm...
AI summary NS Power's 2026 ACE Plan allocates $45 million for vegetation management to enhance power system reliability across 860 km of infrastructure. Regional breakdowns (Metro, Northeast, East, West) are detailed in Figure 33, with plans to refine the strategy based on 2025 performance data.
theast 847 48 West 2,389 133 Total 5,261 293 3 4 7.1.2 Transmission Corridor Widening with Managed Rights-of-Way (ROW) > 69KV 5 6 2026 Forecast Investment: $3.3 million 7 8 NS Power’s transmission vegetation management plan is strategicall...
AI summary NS Power's 2026 transmission vegetation management plan uses growth modeling, IVM, LiDAR, and inspection data to optimize forestry crew focus, with a $3.3M investment forecast. The plan is part of a five-year reliability initiative, emphasizing predictive planning and hazard mitigation in transmission corridors.
2026 ACE Plan Appendix G Page 54 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 In 2026, NS Power is forecasting an investment of $3.3 million to widen approximately 121 2 kilometers of transmission rights-of-way by...
AI summary NS Power plans to invest $3.3 million in 2026 to widen 121 km of transmission rights-of-way by five meters, enhancing storm hardening and reliability by increasing vegetation clearance from infrastructure. Figures 35 and 36 detail project spans and locations.
2026 ACE Plan Appendix G Page 55 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 7.1.3 Establish New Rights-of-Way (ROW) 2 3 2026 Forecast Investment: $18.5 million 4 5 The 2026 Vegetation Management Reliability progr...
AI summary NS Power's 2026 ACE Plan allocates $18.5M to establish 377km of new rights-of-way using satellite-driven vegetation management and $6.9M for trimming/removing trees along 192km of distribution lines, targeting reliability improvements across Central/Metro, East, Northeast, and West regions.
34.0 West Metro 9.6 Northeast 17.2 2 3 In 2026, NS Power plans to complete approximately 30.9 kilometers of line and phase extensions 4 to enhance system reliability and operational flexibility. These projects are designed to improve 5 loa...
AI summary NS Power plans to complete 30.9 km of line and phase extensions in 2026 to enhance system reliability, reduce voltage drops, and improve service continuity in rural and developing areas. Projects are regionally distributed, with 5.5 km in the Northeast, 10 km in Metro, and 15.4 km in the West, as outlined in Figure 41.
2026 ACE Plan Appendix G Page 59 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential
AI summary The document references the 2026 Annual Capital Expenditure (ACE) Plan's Appendix G, which includes an update to NS Power's Five-Year Reliability Plan. The content is non-confidential and appears in a regulatory proceeding context.
1 7.2.1.4 Distribution System Underground Upgrades 2 3 In 2026, a planned investment of $10.2 million will support the Distribution Underground 4 program, aimed at strengthening and modernizing NS Power’s underground electrical system. Thi...
AI summary NS Power plans a $10.2M 2026 investment in underground distribution upgrades, including cable replacement in Kentville, SCADA-enabled switch installation in Halifax, and a high-capacity ductbank with QEII Health Sciences Centre. These projects aim to enhance system reliability, reduce outages, and support infrastructure growth in high-density areas.
2026 ACE Plan Appendix G Page 61 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 Figure 42: Illustration of Targeted NS Power Transmission Projects Planned for 2026 2 3 4 7.2.3 Substation Upgrades and Replacements 5 6...
AI summary NS Power plans to invest $52.0 million in 2026 for substation upgrades and replacements to enhance system reliability and support regional growth, aligning with their asset management framework and community needs.
2026 ACE Plan Appendix G Page 65 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 • Device Deployment: The first phase involves ensuring the necessary field devices are in 2 place. While most of the required devices al...
AI summary NS Power's Five-Year Reliability Plan Update outlines three phases of FLISR implementation: device deployment, connectivity enablement, and FLISR configuration. These projects are targeted for completion by the end of 2026 and are currently under consideration by the NSEB under matter M12417.
2026 ACE Plan Appendix G Page 67 of 71 NS Power Five-Year Reliability Plan - Update Non-Confidential 1 8.0 CONCLUSION 2 3 NS Power’s Five-Year Reliability Plan represents a significant, sustained commitment to 4 improving system reliabilit...
AI summary NS Power’s Five-Year Reliability Plan outlines a commitment to improving system reliability and resilience through targeted investments, including vegetation management and grid modernization. The plan aims to achieve a 20 percent improvement in SAIDI by 2029 while maintaining affordability and transparency with stakeholders.
N-6NSPI (NSEB) RIR 1 to 202 - Redacted
33 passages
2026 ACE Plan NSEB IR-1 Attachment 1 Page 1 of 3 1987.25 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17...
AI summary The document outlines a project titled 'Subsea Cable Asset Management' under the 2026 ACE Plan, with a forecasted spend of $494,282 for equipment upgrades in the distribution category, aimed at reliability enhancement.
2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) NSPI Responses to NSEB Information Requests 1 Request IR-19: 2 3 Section 7.0 Transmission pages 46 to 50 4 5 On page 48 of the application, NS Power states: "The focus for transmissi...
AI summary The 2026 Annual Capital Expenditure (ACE) Plan focuses on transmission and distribution investments aimed at improving system reliability and performance standards. The plan includes projects related to energy storage and synchronous condensers, and it is expected to contribute to a net positive impact on performance metrics. Questions are raised about the specific performance standards and the expected improvements from the proposed projects.
NON-CONFIDENTIAL 1 Response IR-33: 2 3 (a) The increase in forecast spend for 2026 is primarily driven by incremental investment in 4 system reliability initiatives. Spending within this routine is primarily allocated to targeted 5 equipme...
AI summary The increase in forecast spend for 2026 is primarily driven by investments in system reliability initiatives, including equipment replacement such as pole upgrades, aligned with the Five-Year Reliability Plan and risk-based decision-making.
NON-CONFIDENTIAL 2026 ACE Plan Condition Inputs 16 has focused in two areas, CEATI's Grid Resiliency Working Group and Electricity Canada 17 reliability programs. In both cases, NS Power endeavors to leverage these industry groups to 18 id...
AI summary NS Power has focused on reliability programs through CEATI's Grid Resiliency Working Group and Electricity Canada, aiming to identify and validate quantitative reliability measures. The company is confident in its current risk-based decision-making methods and has evaluated metrics like MAIFI to assess reliability concerns and customer impact.
7 Year SAIDI All-In SAIDI MED Excluded Resilience Gap 2 3 Directives & Misc pages 87 to 141 4 5 Section 11.1.4 Impact of Reliability Projects pages 92 to 132 6 7 Page 100 of the application discusses the metrics and the measure of Reliabil...
AI summary The document discusses the use of Reliability Cost Efficiency (RCE) as a metric to evaluate risk mitigation strategies for improving reliability in the electricity grid. An example is provided where NS Power considers options like strategic undergrounding or vegetation management for a rural feeder section with increased circuit risk. The RCE metric is not the sole criterion for project selection but is used to refine the choice of interventions.
SHOW ON SEPARATE SCREEN: Power outages can be caused by severe weather, traffic accidents, tree or animal contacts, and equipment failures, among other things. When completing this survey, please note that a "power outage" refers to a comp...
AI summary This survey collects information about power outages, including their frequency, impact on households, and backup power solutions. It addresses whether residents have experienced outages, work from home, have health conditions requiring electricity, and have backup power systems.
19 2021: CEA Description Events CI CH % Events % CHI % CI Adverse Weather 1,045 197,720 683,315 9.4 14.7 23.3 Adverse Weather - Trees 418 79,088 273,326 3.7 5.9 9.3 Defective Equipment 3,083 240,052 465,752 27.6 17.9 15.9 Tree Contacts 2,1...
AI summary The table summarizes outage events in 2021, categorizing them by cause, including adverse weather, defective equipment, tree contacts, and other causes, along with associated customer hours of interruption and capital item costs.
2 2023: CEA Description Events CI CH % Events % CHI % CI Adverse Weather 3,765 533,613 3,862,555 19.7 20.0 31.2 Adverse Weather - Trees 1,506 213,445 1,545,022 7.9 8.0 12.5 Defective Equipment 2,999 332,400 753,161 15.7 12.5 6.1 Tree Conta...
AI summary The table provides a breakdown of customer interruption events in 2023, categorized by cause, including adverse weather, defective equipment, tree contacts, and other causes, with associated statistics such as the number of events, customer interruptions, and percentages.
6 2025: CEA Description Events CI CH % Events % CHI % CI Adverse Weather 1,758 143,950 752,972 13.4 8.9 13.4 Adverse Weather - Trees 703 57,580 301,189 5.4 3.6 5.4 Defective Equipment 2,137 168,495 516,909 16.3 10.5 9.2 Tree Contacts 2,492...
AI summary The table summarizes customer interruption events in 2025, categorized by cause. Adverse weather, defective equipment, and tree contacts are the main causes, with tree contacts being the most frequent and impactful in terms of customer hours of interruption.
17 (a) An updated Figure 71 is below, with data to the end of 2025: Customer Hours of Interruption Device Type 2025 % of Hours Pin Insulator 94,754 19.87 Crossarm 73,037 15.32 Primary Aerial Conductor 60,055 12.59 Inline Disconnector 49,18...
AI summary The text provides data on customer hours of interruption by device type in 2025, highlighting the contribution of various components to power outages. It also notes the number of outage events caused by failures in specific devices, such as crossarms and pin insulators, during the same period.
- 3 Please refer to table below for Event Day contributions to CHI attributable to device failures. Device Failed Non-Event Day Significant Major Extreme Event Day Contribution per Device % Pin Insulator 93,035 - - 1,718.70 1.8 Crossarm 73...
AI summary The table outlines Event Day contributions to Customer Hours of Interruption (CHI) attributable to device failures, with percentages indicating the contribution of each device type on Event Days. Devices like Recloser and Disconnector show significant contributions, while others like Crossarm show no contribution.
NON-CONFIDENTIAL 1 Request IR-56: 2 3 Directives & Misc pages 87 to 141 4 5 Section 11.1.4 Impact of Reliability Projects pages 92 to 132 6 7 Figure 75: Detail on Outage Causes for identified Event Days on pages 115 to 116. 8 9 (a) Please...
AI summary The response to IR-56 provides an updated table of outage data for 2025, showing five event days and details on interruptions by cause, including tree contacts and loss of supply. The data includes hours of interruption and percentages for each category.
3 4 5 (b) System (BES) and would include events occurring on NS Power's transmission lines or within substations that result in an interruption to the distribution system. Such events can include, but are not strictly limited to, tree cont...
AI summary The text discusses Loss of Supply events related to the Bulk Electric System (BES) and identifies that one event in 2025 was caused by a tree contact with a transmission line. It refers to a table for more details on the events.
11 Event Day Impacted Transmission Line Location Cause 2025.02.17 L-5058 Cumberland County Adverse Weather (Icing) 2025.07.26 L-6537 Inverness County Failed Equipment (Substation Transformer) L-6503 Colchester County E-:1-1E: 2025.12.19 L-...
AI summary The document lists several transmission line outages in Nova Scotia, detailing the event day, impacted line, location, and cause of each incident, including adverse weather and equipment failure.
1 (c) The forecasted Utilization and Capacity Factors as per the 2025 10-Year System Outlook 2 provided in the table below. 3 2026 2027 2028 2029 Utilization Factor H M L UL Capacity Factor 61% 41% 12% 15% 4
AI summary The 2025 10-Year System Outlook 2 forecasts utilization and capacity factors for the years 2026 to 2029. The utilization factor is expected to range from high (H) to ultra-low (UL), while the capacity factor is projected to decline from 61% in 2026 to 12% in 2028, then slightly increase to 15% in 2029.
8.1 Organizational Capabilities
AI summary This section discusses the organizational capabilities of the Nova Scotia Energy Board and Nova Scotia Power Inc. in the context of capital expenditures, reliability, and grid management. It highlights the importance of infrastructure planning and the role of various programs and initiatives in maintaining system reliability.
8.5 Quality and Monitoring
AI summary Section 8.5 discusses quality and monitoring in the context of energy regulation, focusing on performance metrics and reliability standards. It outlines key indicators such as SAIFI, SAIDI, and CKAIFI, which are used to assess the reliability of the electricity transmission system.
8.7 Performance Standards
AI summary This section outlines the performance standards related to electricity transmission and distribution, including metrics such as SAIFI, SAIDI, and CKAIFI. These standards are used to evaluate the reliability and efficiency of the electricity grid.
Experience Rating Statement for 2024
AI summary The document outlines the Experience Rating Statement for 2024, which provides an overview of performance metrics and reliability indicators for the electricity transmission system in Nova Scotia.
Experience Rating Statement for 2023
AI summary The Experience Rating Statement for 2023 provides an overview of performance metrics and reliability indicators for the electricity sector in Nova Scotia, focusing on service interruptions and system performance.
7.0 Site Location, Control, and Access
AI summary This section outlines the considerations related to site location, control, and access in the context of energy infrastructure planning and management. It includes details about regulatory processes, stakeholder involvement, and technical standards for ensuring reliability and safety.
9.0 Site Procedures
AI summary The section outlines site procedures related to energy infrastructure and operations, including capital expenditures, reliability metrics, and compliance with regulatory standards.
Bonding Bonding is when there is an electrical connection between two or more conductive containers, ensuring that the containers have the same electrical charge and thus preventing a spark jumping from one container to the next.
AI summary Bonding refers to the electrical connection of conductive containers to equalize their charge, preventing sparks between them. This practice is critical for safety in environments where conductive materials are used.
Surge Residuals + HHWLT Total Water Levels (tide incl. surge) - 200-year design event, design life of 50-years, construction in 2030 - No allowance for freeboard or wave runup / overtopping effects is included in this analysis
AI summary This section discusses the analysis of surge residuals and high harmonic water level totals, including tide and surge, for a 200-year design event with a 50-year design life starting in 2030. The analysis does not account for freeboard or wave runup/overtopping effects.
The Design Criteria are: - 1. Sub-transmission system loading shall be within the thermally limited ratings. - 2. The sub-transmission system voltages shall not be less than 97.5% or greater than 105% of nominal. - 3. As far as possible, p...
AI summary The Design Criteria outline standards for sub-transmission system performance, including voltage limits, fault handling, and recovery after outages. The criteria do not guarantee continuity of supply for all contingencies, with specific considerations for line and transformer outages.
5 (b) Please refer to Attachment 1 for the All‑Events Annual Outage Data from 2018–2025. The 6 annual results include all outage events from 2018–2025 for every feeder in all phases of 7 the vegetation management program, regardless of whe...
AI summary The document discusses outage data from 2018–2025, the impact of a cyber incident on data availability regarding vegetation management, and the lack of detailed breakdowns in the annual storm budget. It also notes that the New Distribution ROW program is not related to storm response.
2026 ACE Plan NSEB IR-128 Attachment 1 Page 1 of 2 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Year CEA Description 2018 2019 2020 2021 % Total Customer Hours of Interrupts (CHI) Adverse Environment 0.6% 0.4% 0.2% 0.3% Adverse Weather 36.3...
AI summary The document presents data on customer interruptions and events related to the 2026 ACE Plan. It includes percentages of interruptions by various causes such as adverse weather, tree contacts, and defective equipment across the years 2018 to 2021.
2 (a) 3 (i) Please refer to Attachment 1 for tree-related outage statistics for the Phase 11 4 targeted circuits and their impact to overall annual totals for 2020-2025. 5 6 (ii) Please refer to Attachment 2 for All Events 2025 SAIFI and S...
AI summary The text refers to attachments containing tree-related outage statistics and reliability metrics for targeted circuits from 2020-2025, noting that some branch circuits may have higher CKAIFI values than the overall feeder average.
ALL EVENTS AND CAUSES INCLUDED Source 2025 CKAIFI 2025 CKAIDI 2025 SAIFI 2025 SAIDI 100C-422 3.88 6.26 System 2.92 10.19 102W-311 7.12 10 137H-411 2.48 1.22 137H-412 2.9 3.64 137H-414 0.94 0.23 15N-401 5.94 25.08 22C-403 1.34 2.12 22C-404...
AI summary The document presents a table of reliability metrics (CKAIFI, CKAIDI, SAIFI, SAIDI) for various locations in 2025, with system-wide values provided. It also references the 2026 ACE Plan and indicates that the document is an attachment to NSEB IR-129, with confidential information redacted.
1 which slowed down productivity. A continued focus on contractor efficiency is also 2 expected to help reduce the unit cost. Actual Phase 10 KM 70W-311 Conquerall Mills 12 0 Removed due to priority shift. 70W-313 Highway 332 20 0 Removed...
AI summary The text discusses the impact of productivity slowdowns and the potential for improving unit costs through contractor efficiency. It also includes a table listing various projects, their locations, planned and actual kilometers, and reasons for changes such as priority shifts, reliability needs, and wildfire risk.
2 (i) CI C0082133 IT Renew Microsoft Enterprise Agreement is the only project 3 specifically for license renewal. 4 5 (c) The rating of 25 for the ECEI Synchronous Condensers reflects both the criticality and 6 condition assessments under...
AI summary The document discusses the criticality rating of 25 assigned to ECEI Synchronous Condensers, emphasizing their role in maintaining system reliability and stability with increased wind generation as part of the Path to 2030. These units provide essential grid services as coal generation is phased out.
6 In addition to lagging performance indicators, NS Power's vegetation management 7 program has improved feeder condition through targeted interventions, a key leading 8 indicator of reduced future tree contacts. Targeted right‑of‑way wide...
AI summary NS Power's vegetation management program has improved feeder conditions through targeted interventions, reducing future tree-related outages and supporting reliability improvements. This proactive approach addresses vegetation encroachment and mitigates system risks, especially during severe weather.
Performance Standards 2024 2025 SAIFI 1.97 1.57 SAIDI 5.26 4.79 14
AI summary The document presents performance standards for the years 2024 and 2025, showing improvements in SAIFI and SAIDI metrics, indicating enhanced reliability in the electricity system.