HomeSystem ReliabilityM12898Evidence
Topic/Matter Intersection

Topic:"System Reliability" in M12898

Matter: Nova Scotia Power Inc. - Distribution Routines CI Various- D055 – Planned Replacement of Deteriorated Equipment (ATO) - $11,359,8222025 ACE Plan – Routine Capital - Authorization to Overspend (ATO):Distribution Routines – Non-Confidential • D055 – Planned Replacement of Deteriorated Equipment: ATO amount $11,359,822
5 passages 4 documents

System Reliability across all matters →

N-2NSPI (CA) RIR 1 to 12 - Redacted 2 passages
19 SAFETY AND ENVIRONMENT p. p. 16
19 SAFETY AND ENVIRONMENT 19.1 At the request of NSPI, the Service Provider agrees to provide all information related to the safety performance of the Service Provider and its Subcontractors, as applicable. In addition, the Service Provide...

AI summary NSPI has requested the Service Provider to provide information related to safety performance and maintain a subscription at their own expense.

PERFORMANCE p. p. 60
PERFORMANCE Measure Performance Metric Incident Level Minor B Environmental Moderate Adhere to terms of Nova Scotia Power Safe C Environmental Management System 4.01 Significant D >2 Significant (12 months Rolling) F High Potential First A...

AI summary The document outlines performance metrics and incident levels for Environmental, Safety, and Service Delivery measures, including actions to be taken based on performance scores. It includes tables detailing incident levels and performance actions, as well as a scoring system for service delivery.

N-3NSPI (NSEB) RIR 1 to 10 1 passage
NSPI Responses to NSEB Information Requests p. p. 19
NSPI Responses to NSEB Information Requests 1 Request IR-1: 4 and reliability risk. Overall, this budget increase enables NS Power to proactively manage 5 asset condition, improve reliability in priority areas, prevent reactive failures, a...

AI summary NS Power is requesting a budget increase to proactively manage asset condition, improve reliability in priority areas, prevent reactive failures, and execute work cost-effectively through coordination with other initiatives.

102355Letter NSPI re: Capital Items Filed Outside the Quarter Package 1 passage
System Security p. p. 0
System Security Item 3: Partial confidentiality was applied to the System Impact Study Report (Attachment 1) for this capital work order. The enclosed information and distribution diagrams are confidential due to system security concerns....

AI summary Partial confidentiality was applied to the System Impact Study Report due to system security concerns. The enclosed information and distribution diagrams are confidential to protect the power system and reduce risks from external threats.

102546NSEB (NSPI) IR-1 to IR-10 1 passage
Request IR-9:
Request IR-9: Please describe how the utility has addressed system hardening solutions and resilience in the project selection.

AI summary The request asks the utility to describe how it has addressed system hardening solutions and resilience in the project selection process.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →