Topic:"System Reliability" in M12969

Matter: Berwick Electric Commission - 2026 Flow Through Application
1 passage 1 document

System Reliability across all matters →

103154Board Order with updated Schedule A 1 passage
GENERAL DEMAND PEAK CO-INCIDENCE RATE (OPTIONAL)
GENERAL DEMAND PEAK CO-INCIDENCE RATE (OPTIONAL) The rate is available to customers meeting the availability criteria of the General Demand rate class who install heat storage systems and/or controls to enable load shedding upon receipt of...

AI summary The General Demand Peak Co-Incidence Rate is an optional rate for customers who install heat storage systems and/or controls to enable load shedding. Customers must remain on this rate for one year, and are required to reduce load during winter peak periods. They receive a demand control credit based on their demand reduction. BEC establishes a peak demand defense point and inspects systems for compliance.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →