P-1-(i)Appendix A - Green Choice PPA 3 passages
1.8 Energy Reform (2024) Act p. pp. 25-26
1.8 Energy Reform (2024) Act - (a) Reference is made to the Energy Reform (2024) Act which came into effect on April 1, 2025 and pursuant to which certain Laws and Regulations were amended and pursuant to which the More Access to Energy Ac...

AI summary The Energy Reform (2024) Act, effective April 1, 2025, outlines a transition of system operator functions from NSPI to the IESO, including the procurement of Ancillary Services and the enactment of Market Rules and Procedures. This transition may require amendments to the Agreement, with arbitration as a resolution mechanism if agreement cannot be reached.

(b) The Seller shall: p. p. 34
(b) The Seller shall: - (i) For each day of the Interim Period and the Term, provide to NSPI by 8:30 am Atlantic Prevailing Time of the previous day, an hourly forecast of (i) the number of generators at the Facility that will be available...

AI summary The Seller is required to provide NSPI with hourly forecasts of generator availability and deratings, update forecasts promptly in case of changes, and provide real-time data access. Failure to comply results in a 75% reduction in the applicable rate for Net Output.

10.1 Seller Events of Default p. pp. 50-51
cation is made or caused to be made). - (g) The Generator Interconnection Agreement is terminated in accordance with its terms other than for a default of NSPI thereunder. - (h) The Seller ceases Energy production at the Facility for a con...

AI summary This section outlines the conditions under which a Seller may be in default, including termination of the Generator Interconnection Agreement, cessation of energy production for 30 days without reasonable efforts to restore operations, and the untruthfulness of key representations provided by the Seller.

P-1-(ii)Appendix B - Green Choice PPA Blackline to PPA in M11455 2 passages
(b) The Seller shall: p. p. 42
(b) The Seller shall: - (i) For each day of the Interim Period and the Term, provide to NSPI by 8:30 am Atlantic Prevailing Time of the previous day, an hourly forecast of (i) the number of generators at the Facility that will be available...

AI summary The Seller is required to provide NSPI with detailed forecasts and updates regarding generator availability, deratings, and other operational data, particularly for wind energy facilities. Failure to comply results in a 75% reduction in the applicable rate for Net Output on affected days. This information is intended to support NSPI's dispatch and operation of the System in accordance with Good Utility Practice.

4.3 Automatic Generation Control p. pp. 47-49
4.3 Automatic Generation Control - (a) The Seller shall cause the Facility to be equipped with Automatic Generation Control (AGC) equipment and software that is suitable and sufficient, in accordance with Good Utility Practice, to provide...

AI summary The section outlines the requirements for Automatic Generation Control (AGC) equipment and software at the Facility, ensuring real-time power output adjustments and compliance with system operator needs. NSPI has the right to perform diagnostics, and compensation rules are established for Expected Output reductions due to AGC use or failures.

P-1-(iii)Appendix C - DRAFT #1 Green Choice PPA 2026 - CLEAN 1 passage
(b) The Seller shall: p. p. 37
(b) The Seller shall: - (i) For each day of the Interim Period and the Term, provide to NSPI by 8:30 am Atlantic Prevailing Time of the previous day, an hourly forecast of (i) the number of generators at the Facility that will be available...

AI summary The Seller is required to provide NSPI with detailed hourly forecasts, updates on generator availability and deratings, and real-time data access. Failure to comply results in a 75% reduction in the applicable rate for Net Output. This information is intended for dispatch and operating the System in accordance with Good Utility Practice.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →