VIA ELECTRONIC FILING Ms. Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Energy Board 3rd Floor 1601 Lower Water Street P.O. Box 1692, Unit "M" Halifax, Nova Scotia B3J 3S3 RE: North American Electric Reliability Corporation...
AI summary The North American Electric Reliability Corporation (NERC) submitted a notice of filing to the Nova Scotia Energy Board regarding revisions to its Rules of Procedure concerning Computational Load. The revisions introduce two new functional entities to the NERC registry: Computational Load Owner and Computational Load Operator. NERC is requesting a waiver of applicable filing requirements and invites the Board to communicate any concerns or anticipated impacts resulting from these registry criteria changes.
NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF REVISIONS TO THE NERC RULES OF PROCEDURE REGARDING COMPUTATIONAL LOAD Lauren A. Perotti Assistant General Counsel Sarah P. Crawford Senior Counsel Marisa Hecht Seni...
AI summary The North American Electric Reliability Corporation (NERC) has filed a notice regarding revisions to its Rules of Procedure specifically concerning 'computational load.' The filing is submitted by counsel representing NERC and outlines updates to the procedures governing how computational loads are handled within the corporation's regulatory framework.
I. SUMMARY NERC herein submits proposed Rules of Procedure revisions that add two new functional entities to the NERC registry criteria – Computational Load Owner and Computational Load Operator. Through this proposal, NERC takes steps to...
AI summary NERC is proposing revisions to its Rules of Procedure to introduce two new functional entities to its registry: Computational Load Owner and Computational Load Operator. This initiative aims to mitigate reliability risks posed by the rapid growth of large computational loads, such as data centers and large industrial facilities, on the Bulk Power System (BPS). The proposal is based on findings from NERC's Long-Term Reliability Assessments (LTRAs), which identified these large loads as significant emerging risks to grid stability.
A. Overview of NERC Registration Process and Registry Criteria NERC follows the process in the Rules of Procedure Appendix 5A to identify and register owners, operators, and users of the BPS that could materially impact the reliability of...
AI summary The text outlines the North American Electric Reliability Corporation (NERC) process for identifying and registering entities that impact the reliability of the Bulk Power System (BPS). It describes the use of Rules of Procedure Appendix 5A and 5B (Registry Criteria) to categorize owners, operators, and users. Registration is based on functional entity types and specific threshold criteria; once registered, these entities are listed on the NERC Compliance Registry and become subject to mandatory reliability standards and enforcement.
B. Development of the Proposed Revisions to the NERC Rules of Procedure NERC developed the proposed criteria through an open and inclusive stakeholder process. Under the NERC Large Loads Action Plan directed by the NERC Board in February 2...
AI summary The text describes NERC's development of proposed revisions to its Rules of Procedure, specifically targeting the impact of large computational loads on the Bulk Power System. NERC utilized a three-pronged approach involving Alerts, Registry Criteria revisions, and new Reliability Standards. The process included extensive stakeholder engagement, public webinars, and two rounds of public comment periods in 2026, culminating in the NERC Board of Trustees' approval of the revisions on October 8, 2026.
IV. THE NEED TO ADDRESS COMPUTATIONAL LOAD NERC, through its engineering staff and technical industry groups, assessed the impacts to the BPS of unprecedented load growth that has occurred over the past few years. Through that work, NERC d...
AI summary The text discusses the growing risks posed to the Bulk Power System (BPS) due to unprecedented load growth from computational loads. NERC, in coordination with the U.S. Department of Energy and FERC, identified unique electrical characteristics of these loads that necessitate new mandatory Reliability Standards for owners and operators of Computational Load Sites. NERC is proposing the development of new functional entities within its Compliance Registry and has initiated the 'Large Loads Action Plan' to address these interconnection and reliability risks.
A. NERC Large Loads Action Plan Over the past few years, NERC in its Long-Term Reliability Assessments identified unprecedented load growth, noting that demand growth is higher than at any point in the last two decades. 21 This projected i...
AI summary The text discusses the North American Electric Reliability Corporation (NERC) Large Loads Action Plan, which addresses unprecedented electricity demand growth in North America. This growth is primarily driven by the digital economy, specifically data centers for artificial intelligence. The rapid expansion of these large loads presents unique challenges for demand forecasting and system behavior planning. NERC is collaborating with stakeholders to ensure transmission system reliability and mitigate potential impacts on the Bulk Power System (BPS).
1. NERC Large Loads Working Group As part of the NERC Large Loads Action Plan, NERC engaged the Reliability and Security Technical Committee Large Loads Working Group ("LLWG") 24 to assess the risks to the reliability of the BPS posed by l...
AI summary The text describes the activities of the NERC Large Loads Working Group (LLWG), which was established to assess risks to the Bulk Power System (BPS) posed by large loads. NERC identified specific risks associated with emerging power electronic loads, such as those for data centers, artificial intelligence, and cryptocurrencies. These loads are characterized by high energy consumption, variable demand, significant cooling requirements, and the use of software controls to manage load behavior, which differ from traditional electrical characteristics.
2. NERC Alerts and Incident Reviews Another component of the NERC Large Loads Action Plan, NERC published a Level 2 Alert on September 9, 2025 that provided additional insight into the impacts of the integration of large loads and industry...
AI summary The text discusses NERC's Level 2 Alert and subsequent public report regarding the integration of large loads into the Bulk Power System (BPS). NERC identified significant risks to reliability and highlighted gaps in current industry preparedness, specifically noting that registered entities often lack the necessary modeling information or direct coordination with large load entities. The findings emphasize the need for new functional entities and updated Reliability Standards to mitigate these risks.
3. Need for New Functional Entities The severity of the aggregate risk posed by the types of occurrences outlined in the incident reviews grows with the amount of computational load expected on the system. In the Level 2 Alert report, NERC...
AI summary The text discusses the increasing reliability risks posed by the proliferation of large computational loads on the Bulk Power System (BPS). NERC identifies that computational loads may account for 90% of large loads by 2027, presenting unique electrical behaviors and geographic concentrations that threaten grid stability. To mitigate these risks, NERC is proposing new registry criteria and Reliability Standards to help grid planners understand load profiles. Interim measures include Level 3 Essential Action Alerts and Reliability Guidelines to manage load reductions and oscillations.
B. ANOPR and FERC Directive While NERC implemented its Large Loads Action Plan, the Secretary of the U.S. DOE and FERC also recognized the need for action to address the reliable integration of large loads with the transmission system. On...
AI summary The text details the regulatory actions taken by the U.S. Department of Energy (DOE) and the Federal Energy Regulatory Commission (FERC) regarding the integration of large loads into the interstate transmission system. Specifically, it discusses a 2025 Advance Notice of Proposed Rulemaking (ANOPR) and a subsequent FERC directive requiring NERC to develop new reliability standards and registry criteria for computational loads. NERC has committed to a timeline to submit these revised standards by late 2026 to mitigate grid reliability risks.
V. AUTHORITY TO REGISTER COMPUTATIONAL LOAD As the ERO, NERC possesses the authority to register entities creating this impactful computational load as "users of the BPS." While owners and operators of the BPS are well-defined through NERC...
AI summary The text discusses the authority of the North American Electric Reliability Corporation (NERC) to register entities creating significant computational loads as "users of the Bulk Power System (BPS)." It argues that based on U.S. Federal Power Act legislative history and FERC precedent, the term "user" should be broadly defined to include all large end-users of electricity connected to the BPS. This broad definition is intended to ensure that mandatory reliability rules apply to all grid users without exemption to maintain system reliability.
VI. PROPOSED REVISIONS TO THE NERC RULES OF PROCEDURE NERC respectfully submits that the proposed revisions to Appendices 2, 5A, and 5B satisfy the directive in the Computational Loads Order to develop registry criteria to address the risk...
AI summary NERC is proposing revisions to its Rules of Procedure, specifically Appendices 2, 5A, and 5B, to establish registry criteria for computational load entities. These changes are intended to comply with the Computational Loads Order by addressing risks posed by these loads. The proposal includes new definitions, an updated registration process involving Regional Entities, and specific technical criteria for capacity and voltage thresholds for Computational Load Sites to ensure compliance with Reliability Standards.
1. Computational Load Site NERC proposes the following new definition in Appendix 2 of the NERC Rules of Procedure: "Computational Load Site" means one or more buildings, structures, or installations at a single location that - 1) Primaril...
AI summary The text outlines a proposed new definition by NERC for a 'Computational Load Site.' This definition is intended to provide clarity on site boundaries for identifying ownership and calculating total connected load. A site qualifies if it is at a single location, primarily contains information technology infrastructure (such as for AI training, software services, or cryptocurrency mining), and is connected to the Bulk Power System (BPS). The proposal responds to requests for clearer distinctions between various types of computational activities.
2. Computational Load Operator and Computational Load Owner In feedback on the April posting, commenters recommended the proposed criteria use the same "Owner" and "Operator" model for computational loads to remain consistent with the regi...
AI summary The text discusses NERC's proposal to establish distinct definitions for 'Computational Load Operator' and 'Computational Load Owner' within Appendix 2. This distinction aims to mirror existing models for transmission and generation, allowing for scenarios where ownership and operations are separate. The 'owns and maintains' criteria for owners is intended to identify active participants rather than passive financial interests, ensuring that only entities with significant operational responsibility are registered for compliance.
B. Appendix 5A Appendix 5A ( Attachments 2-B and 3-B ) contains the process used by NERC and the Regional Entities to register certain functional entity types to which mandatory and enforceable Reliability Standards apply. NERC proposes to...
AI summary The document describes proposed revisions to Appendix 5A of the NERC Rules of Procedure. The primary change is the addition of 'Computational Load Owner (CLO)' and 'Computational Load Operator (CLOP)' as entity types required to register on the NERC Compliance Registry to ensure mandatory and enforceable Reliability Standards apply to them. The revision also includes minor administrative corrections regarding the removal of figures from the Rules of Procedure.
C. Appendix 5B Appendix 5B ( Attachments 2-C and 3-C ) contains the specific criteria NERC and the Regional Entities use to identify which organizations may be candidates for registration for functional entity types. In accordance with the...
AI summary The text outlines proposed revisions to Appendix 5B regarding the criteria for identifying organizations eligible for registration as Computational Load Owners and Computational Load Operators. In alignment with the United States Federal Power Act, NERC aims to identify Bulk Power System (BPS) users with material impacts. The proposed thresholds for registration are set at a total connected load of at least 50 MW and a voltage level of 100 kV or higher, adjusted from previous recommendations based on NERC Level 2 Alert data and stakeholder feedback.