HomeTariff DesignM12412Evidence
Topic/Matter Intersection

Topic:"Tariff Design" in M12412

Matter: Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Proposed expenditure and revenue requirements for test year ending March 31, 2026
8 passages 6 documents

Tariff Design across all matters →

N-10Evidence of Doane Grant Thornton 1 passage
Preamble p. pp. 41-42
- 15 The AESO's day-to-day work relies on the leadership and expertise of the AESO Board. Appointed by the 16 Government of Alberta, the board members bring a diverse set of skills and experiences from a wide range of 17 industries. The bo...

AI summary The AESO's operations are guided by its Board of Directors, which consists of seven members from diverse backgrounds. The board is organized into four standing committees, including Audit, Governance and Nominations, Human Resources, and Power System, each with specific responsibilities related to financial oversight, governance, HR strategy, and market design.

N-11Evidence - Synapse 1 passage
Q Has NSIESO begun its IRP modeling? p. p. 6
formal regional cooperation agreement(s) or dispatch mechanisms." 9 Synapse Energy Economics, Evidence of Board Counsel Consultant Robert Fagan , July 18, 2025. NSIESO use the IRP modeling environment to effect a form of analysis that addr...

AI summary NSIESO is utilizing IRP modeling to evaluate enhanced regional coordination approaches, referencing the 'Atlantic Energy Gateway' studies. Synapse Energy Economics emphasized updating analyses to reflect industry changes over 14 years and suggested reducing 'pancaked' transmission rates for export energy.

N-11-(i)Exhibit 1 - Fagan Resume 2 passages
SUMMARY p. p. 0
SUMMARY Mechanical engineer and energy economics analyst with over 30 years of experience in the energy industry. Activities focused primarily on electric power industry issues, especially resource planning, renewable and battery storage r...

AI summary A mechanical engineer and energy economics analyst with over 30 years of experience in the electric power industry, specializing in resource planning, renewable and battery storage integration, economic analysis of power plants, transmission, wholesale markets, and demand-side alternatives. Expertise spans technical and economic dimensions of power systems in the US and Canada, including integrated resource planning, renewable integration, transmission pricing, RTO/ISO structures, and regulatory policies.

TESTIMONY p. p. 0
TESTIMONY 218th Judicial District Court, Atascosa County, Texas. Pre-filed report on lack of reliability need in ERCOT for the San Miguel Electric Cooperative coal-fired power plant. January 2020. Newfoundland and Labrador Board of Commiss...

AI summary The document outlines multiple regulatory proceedings involving reliability assessments, rate mitigation, and tariff reviews. It includes a Texas court case on ERCOT reliability, Newfoundland's Muskrat Falls rate mitigation analysis, Nova Scotia's industrial tariff review, and a Michigan case on DTE's renewable energy underutilization. Each section details testimony, filings, and stakeholder involvement.

101053Board Decision 1 passage
Approval required to charge or change rate or tariff p. p. 5
Approval required to charge or change rate or tariff 78 Unless approval to do so has been obtained from the Energy Board, neither the IESO nor any transmitter may charge or change any charge, rate or toll or any tariff respecting transmiss...

AI summary The regulation mandates that the IESO and transmitters must obtain Energy Board approval before altering charges, rates, or tariffs for transmission or ancillary services. This ensures regulatory oversight of pricing changes in the energy sector.

99150Notice of Intervention - MEUs 1 passage
NOTICE OF INTERVENTION
NOTICE OF INTERVENTION TO: The Nova Scotia Energy Board ("Board") AND TO: The Nova Scotia Independent System Operator 1. The BERWICK ELECTRIC COMMISSION, the RIVERPORT ELECTRIC COMMISSION, the TOWN OF MAHONE BAY, and the TOWN OF ANTIGONISH...

AI summary The BERWICK ELECTRIC COMMISSION, RIVERPORT ELECTRIC COMMISSION, TOWN OF MAHONE BAY, and TOWN OF ANTIGONISH (MEUs) purchase power from Nova Scotia Power Inc. under the Municipal and BUTU rates. They also face impacts from the Spill Tariff due to their ownership of the sole customer under it. The MEUs seek intervenor status in the proceeding to protect their interests.

101053Board Decision 2 passages
Approval required to charge or change rate or tariff p. p. 5
Approval required to charge or change rate or tariff 78 Unless approval to do so has been obtained from the Energy Board, neither the IESO nor any transmitter may charge or change any charge, rate or toll or any tariff respecting transmiss...

AI summary Section 78 mandates that the IESO and transmitters require Energy Board approval before altering charges, rates, tolls, or tariffs for transmission or ancillary services. This regulation ensures regulatory oversight of rate changes in the energy sector.

Application for approval of transmission tariff p. p. 5
Application for approval of transmission tariff - 79 (1) The IESO shall make application to the Energy Board for approval of a transmission tariff for the provision of transmission services or ancillary services, or both, and the applicati...

AI summary The IESO must apply for a transmission tariff, including the transmitter's revenue requirement. The Energy Board must approve the tariff based on revenue projections and cost recovery mechanisms for ancillary services. The Board can set timelines for tariff implementation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →