Topic/Matter Intersection

Topic:"Tariff Design" in M12780

Matter: EfficiencyOne - 2027-2031 Demand Side Management (DSM) Plan Application
5 passages 4 documents

Tariff Design across all matters →

E-12E1 (NSEB) RIRs 1-66 - Redacted 2 passages
p. p. 133
Ca teg Su bs ati nd da tio mm ary o erv on s a re co mm en ns 1. Mi nim al Re vie of Re ba te Le l in Te lat Ad jus ted ba te lev el fie ld wit hin th e D ist rib uto r T lat e i ot iew ed rt o f th e P w ve mp e: re em p s n rev as pa rog...

AI summary The text discusses a minimal review of rebate levels in the Distributor Tariff, focusing on the need for proper procedures and ensuring that the distributor's submitted tariff includes the correct fields to be checked during the review process.

p. pp. 138-139
Th is ini l d tat ion to ide e t he W ith t d ion of th iew W ith in the M T ke tat ter t ere m ma oc um en ev nc ou oc um en e r ev er as rac r, m an ag em en lcu lat ion vie of the M Tr ke let ed d r iew da th iew sh ld ide dd ing tab fo...

AI summary The document discusses the submission of a matter for consideration, emphasizing the need for timely inclusion of information and the importance of accurate data representation. It references a master tariff and the submission of information for review.

E-38Synapse (IG) RIR 1 to 10 1 passage
Section 19 p. p. 13
1 2 E1 provided the modified-PAC for SE in response to Synapse IR-02 as Attachment 3 2, Appendix A, Round 2 Modelling Assumptions and Attachment 2, Appendix G, 4 Round 2 Measure Level Technical Tables 1SE-Base3. (b) These files do not indi...

AI summary E1 submitted modified-PAC files for SE in response to Synapse IR-02, but the files lack details on whether hourly load-shape data or annual averages were used to calculate peak-hour capacity costs, making it difficult to assess their impact on the modified-PAC calculation.

101511Notice of Intervention - MEUs 1 passage
NOTICE OF INTERVENTION
NOTICE OF INTERVENTION TO: The Nova Scotia Energy Board ("Board") AND TO: EfficiencyOne ("E1") 1. The BERWICK ELECTRIC COMMISSION, the RIVERPORT ELECTRIC LIGHT COMMISSION, the TOWN OF MAHONE BAY, and the TOWN OF ANTIGONISH (collectively, t...

AI summary The Berwick Electric Commission, Riverport Electric Light Commission, Town of Mahone Bay, and Town of Antigonish (MEUs) seek intervenor status in a Nova Scotia Energy Board proceeding, citing their interest in rates and the Spill Tariff. They purchase power from Nova Scotia Power under municipal and BUTU rates and are directly affected by the Spill Tariff through their ownership and relationship with its sole customer.

102579Letter NSPI re: requests that its third-party experts, Sanem Sergici and/or Sai Shetty of The Brattle Group, participate virtually 1 passage
SELECTED CONSULTING EXPERIENCE p. p. 30
- such as target pilot customer, target recruitment samples, and pilot evaluation plans. Brattle also assisted EPE with recruitment strategies for customer enrollment in the pilots. - Rate Impact Analysis for Nevada Energy. As part of Neva...

AI summary The text outlines various consulting projects involving rate impact analysis, cost allocation reviews, and load impact evaluations for multiple utilities. These projects include work for Nevada Energy, the University of Alaska, People's Electric Cooperative, and a Missouri electric utility, focusing on aspects such as demand-side management, rate design, and transmission cost allocation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →