Topic/Matter Intersection

Topic:"Technical Reference Manual" in M03621

Matter: CI# 38724 - P-128.10 - NSPI WO - TRE 5 Superheater, Reheater and Boiler Upgrades - $796,383
1 passage 1 document

Technical Reference Manual across all matters →

N-1Redacted Work Order 1 passage
Scope of Work p. p. 33
Scope of Work In general. all work would be performed In accordance with the attached technical specification. ASME B31.1 (AppendixV). and the NBIC code. The basic scope of work Includes the following: - Perform a hot Inspection with the u...

AI summary The scope of work involves conducting hot and cold inspections on piping systems, including Main Steam and Reheat systems, following ASME B31.1 and NBIC code standards during a July 2010 outage.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →