Topic/Matter Intersection

Topic:"Technical Reference Manual" in M12619

Matter: Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million
2 passages 1 document

Technical Reference Manual across all matters →

N-1Application - Redacted 2 passages
Section 737
Technical Deliverables (Specifications and/or Drawings) Conductor, Insulator, Grounding, Joint Design (including protection for buried or subsea) Preliminary (P) S P Foundation/Structure (Tower) Design Preliminary (P) S P Route Mapping/Sur...

AI summary The text outlines the status of various technical deliverables for a project, including conductor and insulator design, foundation and structure design, route mapping, and other specifications. The deliverables are categorized as preliminary, started, complete, or not applicable.

Section 1221
ence to “C57.91-1995 IEEE Guide for Loading Mineral-Oil-Immersed Transformers”, it is NS Power prac ce to permit the loading of transformers to exceed the nominal or nameplate value. 3. For distribu on load serving transformers to exceed t...

AI summary Nova Scotia Power Inc. outlines transformer loading practices, permitting up to 133% overload for distribution transformers under specific conditions, aligned with IEEE standards. System power transformers have seasonal loading limits (100% in summer, 110% in winter). The document references capital expenditure justification criteria and technical guidelines for transformer management.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →