Topic/Matter Intersection

Topic:"Technology Penetration" in M12696

Matter: NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
3 passages 3 documents

Technology Penetration across all matters →

N-2NSPML (BW) RIRs 1-22 - Redacted 1 passage
Short Biography of Dr. Asim Haldar, P.Eng. p. p. 174
Short Biography of Dr. Asim Haldar, P.Eng. Asim Haldar received his Master's in Structural Engineering and Ph. D in Ocean Engineering from Memorial University of Newfoundland in 1977 and 1985 respectively, with a specialization in behavior...

AI summary Dr. Asim Haldar, a retired Nalcor Energy engineer, has 41 years of experience in utility engineering, specializing in HV line design, ice load monitoring, and offshore structures. He developed the RIGD ice sensor, led major transmission projects, and contributed to international committees like CIGRE and CEATI. His work includes R&D, publications, and conferences on EHV line design and asset management.

N-4NSPML (IG) RIRs 1-26 - Redacted 1 passage
2.2.9 Paper-Mass Insulation for HVDC p. p. 22
use of PPLP for mass-impregnated dc cables seems to require further development. Furthermore, the authors suggest the change of relevant test standards before PPLP can unfold its possible advantages. Cables with mass-impregnated insulation...

AI summary The use of mass-impregnated DC cables with paper-mass insulation requires further development and updated test standards to realize their benefits. These cables avoid oil leaks upon damage, making them suitable for sensitive environments like submarine installations.

N-7Evidence - BW 1 passage
Section 246 p. p. 18
- NS Block, measured in MWh (excluding Make-up Energy), is received during each of 12 - consecutive months."[41](#page-18-1) In introducing this requirement, the Board also stated: - NSPML/NS Power may apply to the Board for relief if it c...

AI summary The requirement mandates NSPML to receive twelve consecutive months of NS Block volumes (excluding Make-up Energy) at least 90% of the total monthly volumes called for under the Energy and Capacity Agreement. This prevents over-reliance on Make-up volumes and ensures consistency and predictability in volume delivery.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →