Matter: Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
4 passages 3 documents

Time Varying Pricing across all matters →

N-92026-2027 GRA Appendix 12 A-C - Cost of Service Study Process - Redacted 1 passage
COSS PHP DR-1 Attachment 1 Page 1 of 1 p. p. 119
COSS PHP DR-1 Attachment 1 Page 1 of 1 \ Data provided is taken from the 2022 Evergreen IRP, scenario CE1-E1-R2.

AI summary The document references data from the 2022 Evergreen Integrated Resource Plan (IRP), scenario CE1-E1-R2, which is used in the Cost of Service Study (COSS) for Peak Hour Pricing (PHP) DR-1 Attachment 1.

101354Board Decision 1 passage
3.9.1.1 Findings p. pp. 271-272
3.9.1.1 Findings [647] The Board accepts that NS Power is engaged in appropriate activities relating to the development of new rate designs. However, the Board believes that more can be done and encourages NS Power to do so. For example, w...

AI summary The Board acknowledges NS Power's efforts in developing new rate designs but emphasizes the need for improvement, citing limited rate options, outdated systems, and the impact of a recent cyber attack. The TVP program's suspension due to data access issues is highlighted, alongside Bonbright's criteria for effective rate structures promoting innovation and efficiency.

101354Board Decision 2 passages
3.9.1 Innovation p. p. 271
3.9.1 Innovation [645] In NSEB IR-132, NS Power was asked to describe any work it has done to develop new or innovative rate designs to leverage more granular data from Advanced Metering Infrastructure (AMI) meters, promote efficient use o...

AI summary NS Power outlined initiatives to innovate rate designs using AMI data, including TVP programs, customer energy management systems, and collaborations with EfficiencyOne and Port Hawkesbury Paper. These efforts aim to promote efficient resource use and adapt to market changes from decarbonization and decentralization.

3.9.1.1 Findings p. pp. 271-272
3.9.1.1 Findings [647] The Board accepts that NS Power is engaged in appropriate activities relating to the development of new rate designs. However, the Board believes that more can be done and encourages NS Power to do so. For example, w...

AI summary The Board acknowledges NS Power's efforts in developing new rate designs but urges improvement, noting limited customer rate options and operational challenges from outdated systems and a cyber attack. The TVP program's suspension highlights these issues, while Bonbright's criteria emphasize dynamic rate structures aligned with energy transition goals.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →