Topic/Matter Intersection

Topic:"Transfer Function Cost Factor" in M10473

Matter: E-ENS-R-22 EfficiencyOne 2023-2025 Demand Side Management (DSM) Plan Application
3 passages 2 documents

Transfer Function Cost Factor across all matters →

E-1Application 1 passage
3. UPDATE ON MODEL EVOLUTION p. pp. 149-151
3. UPDATE ON MODEL EVOLUTION - E1 filed its 2021 RBIA Report with the NSUARB on 1 November 2021. In response to requests by Synapse - and Resource Insights (RI), to increase transparency in the NS Power rate analysis, NS Power incorporated...

AI summary E1 submitted its 2021 RBIA Report to the NSUARB, incorporating transfer tables and cost allocation summaries in response to requests for greater transparency. The report also integrated updated avoided costs from the 2020 IRP Reference Plan.

E-22021 DSM Evaluation Reports 2 passages
Preamble p. pp. 171-172
The other corrections made by the Evaluator did not have a significant impact on results and consisted of correcting the energy and demand line loss factors for 22 entries and correcting the NTGR of one entry.

AI summary The Evaluator made minor corrections to the energy and demand line loss factors for 22 entries and adjusted the NTGR for one entry, which had no significant impact on the overall results.

4.2.6 Evaluated Gross Savings p. pp. 40-41
4.2.6 Evaluated Gross Savings Total gross energy and peak demand savings at the generator were respectively 0.190 GWh and 0.034 MW for the Audit path, 10.643 GWh and 2.321 MW for the DIY path, and 0.272 GWh and 0.043 MW for the Commercial...

AI summary The document provides evaluated gross savings for different energy efficiency programs, including the Audit path, DIY path, and Commercial Direct Instal (CDI) pilot, with specific figures for energy and peak demand savings at the generator. Line loss factors were applied to calculate savings, referencing a 2014 Cost of Service Study Progress Update submitted to the NSUARB.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →