23 Stakeholder NPB Topic Transmission Suggestions/Comments Provide more information about transmission costs. Response The Standards of Conduct restrict the level of detail that can be provided. Qualitatively, network upgrade capital costs...
AI summary Stakeholders requested more information on transmission costs, but the Standards of Conduct limited the level of detail provided. Transmission costs were qualitatively explained, including feasibility assessments and network upgrade assumptions. A second stakeholder suggested adjusting the Load Forecast Base Case between proposed low and base levels, but NSPI stated it does not plan to run a Lower Load World in the 2009 IRP Update.