Matter: Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1) and Nova Scotia Power Inc.(NS Power), the establishment of a final agreement between the parties, and approval of a 2020-2022 Demand Side Management (DSM) Resource Plan
17 passages 5 documents

Transmission Planning across all matters →

E-17E1 (SBA) RIR-1 to RIR-49 1 passage
Date Filed: May 13, 2019 E1 (SBA) IR-13 Page 3 of 3 p. p. 276
Date Filed: May 13, 2019 E1 (SBA) IR-13 Page 3 of 3 Sector Avoided Cost Savings Types 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Residential Energy Savings (kWh) $0.24 $0.24 $0.25 $0.25 $0.26 Residential Coinc. Demand Savi...

AI summary The document presents a table detailing avoided cost savings across different sectors and years, including energy savings, demand savings, and costs related to capacity, transmission, and distribution for residential and BNI sectors from 2020 to 2031.

E-18E1 (Synapse) RIR-1 to RIR-47 1 passage
Initial Estimate of T&D Avoided Costs p. pp. 69-70
Initial Estimate of T&D Avoided Costs ACE Plans[1](#page-70-0) and associated Board decisions for the past eight years were utilized to determine which Transmission and Distribution (T&D) capital investments were related to load growth, as...

AI summary The document outlines the methodology used to estimate T&D avoided costs, focusing on load growth-related investments from 2008 to 2015. It references ACE Plans and Board decisions, and provides initial estimates of T&D costs per MW for transmission and distribution.

E-20NSPI (CA) RIR1 to RIR-54 - Redacted 1 passage
NON-CONFIDENTIAL p. p. 39
NON-CONFIDENTIAL 1 Request IR-9 2 3 Please explain what effect the Nova Scotia-New Brunswick transmission additions 4 implemented as part of the Maritime Link project has had or will have on NS Power's 5 ability to sell renewable energy to...

AI summary NS Power asserts that the transmission additions from the Maritime Link project have not affected or will not affect its ability to sell renewable energy to New England.

E-23NSPI (IG) RIR-1 to RIR-10 - Redacted 13 passages
2020-2022 DSM IG IR-05 Attachment 1 Page 5 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 12
2020-2022 DSM IG IR-05 Attachment 1 Page 5 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 1.0 INTRODUCTION 2 3 In accordance with the 3.4.2.11 Market Rule requirements this report provides NS 4 Power's 10-Year System Outlook on behal...

AI summary This document outlines the 2018 10-Year System Outlook for NS Power, covering load forecasts, generation expansion, environmental compliance, renewable energy projections, resource adequacy assessments, and transmission planning considerations.

6 Figure 12: Combined Transmission & Distribution Advanced Stage Interconnection 7 Queue of June 29, 2018 p. p. 35
6 Figure 12: Combined Transmission & Distribution Advanced Stage Interconnection 7 Queue of June 29, 2018 Combined T/D Advanced Stage Interconnection Request Queue Publish Date: Wednesday, May 16, 2018 Queue Order IR# Request Date DD MMM Y...

AI summary The document presents a queue of advanced stage interconnection requests for combined transmission and distribution systems as of June 29, 2018. It includes details such as project numbers, request dates, counties, power capacities, interconnection points, types of projects, service dates, and statuses.

Preamble p. pp. 36-90
4 Port Hawkesbury Biomass, 63.8 MW gross / 45 MW net output, generating unit is 5 presently an ERIS classified resource which will be converted to NRIS following the 6 system upgrades associated with Transmission Service Request 400, which...

AI summary The document discusses the Port Hawkesbury Biomass generating unit, which is currently an ERIS classified resource and will be converted to NRIS following system upgrades related to Transmission Service Request 400, expected to be completed in 2018.

9 5.1 OATT Transmission Service Queue p. p. 36
9 5.1 OATT Transmission Service Queue 10 11 There is presently one request in the OATT Transmission Queue, as shown in [Figure 14.](#page-36-3) 12

AI summary The OATT Transmission Service Queue currently has one request, as illustrated in Figure 14.

13 Figure 14: Requests in the OATT Transmission Queue p. p. 36
13 Figure 14: Requests in the OATT Transmission Queue Number Project Date & Time of Service Request Project Type Project Location Requested In-Service Date Project size (MW) Status 4 TSR 400 July 22, 2011 Point to Point NS-NB May 31, 2018...

AI summary Figure 14 lists a transmission project request (TSR 400) in the OATT Transmission Queue, detailing its service request date, project type, location, requested in-service date, size, and current status. The project involves the NS-NB interconnection and is awaiting completion of construction and reconfiguration.

2020-2022 DSM IG IR-05 Attachment 1 Page 51 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 57
2020-2022 DSM IG IR-05 Attachment 1 Page 51 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 The 138 kV transmission system is approximately 1871 km in length and is comprised of 2 303 km of steel structures and 1568 km of wood pole li...

AI summary The document outlines the transmission infrastructure of Nova Scotia, including the lengths and compositions of the 138 kV and 69 kV systems, and describes interconnections with New Brunswick and Newfoundland. It also mentions the use of deterministic criteria for transmission system design by NS Power.

3 p. pp. 65-66
3 4 Figure 26: Conditions Determining Limits Export Import Amount of generation in Nova Scotia that can be rejected or run-back via SPS action Nova Scotia system load level (Import must be less than 22% of total system load) Reactive Power...

AI summary The text outlines conditions that determine limits for export and import in Nova Scotia's power system, including factors like generation capacity, reactive power support, and transmission line ratings. These conditions involve interactions with New Brunswick and other regions, as well as climatological and operational factors.

2018 10 Year System Outlook Report Appendix A Page 1 of 4 2020-2022 DSM IG IR-05 Attachment 1 Page 71 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 76
2018 10 Year System Outlook Report Appendix A Page 1 of 4 2020-2022 DSM IG IR-05 Attachment 1 Page 71 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2014 IRP Action Item IRP Reference 2018 10YSO Report Reference Status Execute the Mari...

AI summary The document outlines two key action items from the 2014 Integrated Resource Planning (IRP) process. The first involves completing the Maritime Link transmission investments by 2018. The second requires monitoring and reporting on cost-effective market opportunities, regional balancing, and interconnection developments in annual 10 Year System Outlook Reports.

Transmission Planning Nova Scotia Power Inc. p. p. 82
Transmission Planning Nova Scotia Power Inc. REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2020-2022 DSM IG IR-05 Attachment 1 Page 76 of 158 2018 10 Year System Outlook Report Appendix B Page 2 of 84 2018 10 Year System Outlook Report Appen...

AI summary The text includes references to a 2018 10 Year System Outlook Report and a 2020-2022 DSM IG IR-05 Attachment, with some pages redacted due to confidentiality. These documents are likely related to transmission planning and demand-side management initiatives by Nova Scotia Power Inc.

Transmission Connected Wind Generation: p. pp. 89-90
Transmission Connected Wind Generation: There are currently 11 wind generation facilities located in Nova Scotia that are considered to be connected to NSPI's transmission system. These facilities are identified below in Figure 2 and Table...

AI summary The document discusses 11 wind generation facilities connected to NSPI's transmission system in Nova Scotia, referencing figures and tables for identification. It also mentions the 2018 10 Year System Outlook Report and a redacted DSM IG IR-05 attachment.

Figure 2: Transmission Connected Wind Generation Facilities p. p. 90
Figure 2: Transmission Connected Wind Generation Facilities Transmission Connected Wind Farms in Nova Scotia # I.D. Wind Farm MW IR # Service 1 106W Pubnico Point 30 5 N/A 2 19C Sable 13.8 8 NRIS 3 92N Amherst 31.5 45 N/A 4 109S Lingan 14...

AI summary Figure 2 and Table 1 list transmission-connected wind farms in Nova Scotia, providing details such as wind farm names, capacities, and service types. The table includes both operational and under-development projects, with a note on an additional 14.1 MW under development at one site.

2020-2022 DSM IG IR-05 Attachment 1 Page 95 of 158 2018 10 Year System Outlook Report Appendix B Page 21 of 84 p. p. 101
2020-2022 DSM IG IR-05 Attachment 1 Page 95 of 158 2018 10 Year System Outlook Report Appendix B Page 21 of 84 , Ele mei nts 2021 Dynamics Conting gencies Station Bkr line Bus Xfmr Var Gen Element Dynamics SPS х 713 88S BBU 88S-713 - Х 720...

AI summary The document presents a technical table outlining elements of the 2018 10 Year System Outlook Report, focusing on power system components such as stations, breakers, lines, buses, transformers, and fault scenarios. It includes details on elements like 88S, 101S, and 1015, along with associated dynamics contingencies and special protection systems (SPS).

Appendix A p. pp. 107-119
Appendix A Transmission Connected Wind Farms: 1-Line Diagrams 2018 10 Year System Outlook Report Appendix B Page 28 of 84 2020-2022 DSM IG IR-05 Attachment 1 Page 102 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2018 10 Year System O...

AI summary This document contains appendices related to transmission connected wind farms, 10-Year System Outlook Reports, and a 2017 NRIS Wind Study. It includes figures and diagrams, as well as references to demand-side management (DSM) initiatives and other technical reports. Portions of the text have been redacted as confidential information.

77429Synapse (E1) IR-1 to IR-47 1 passage
Document: 268936 Date Filed: April 29, 2019 Synapse (E1) Page 1 of 11
Document: 268936 Date Filed: April 29, 2019 Synapse (E1) Page 1 of 11 1 2 Request IR-1: programs. costs of Please describe how EfficiencyOne proposes to recover the its proposed 27 28 29 Request IR-32: for the following identify the Page 1...

AI summary The document contains requests for information regarding EfficiencyOne's proposed programs, including how they plan to recover costs, the units used for avoided costs in capacity, transmission, and distribution, and data sources for actual avoided T&D values. It also references a no-DSM scenario rates section.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →