Topic/Matter Intersection

Topic:"Transmission Planning" in M10830

Matter: E-ENS-R-22 - EfficiencyOne - 2022 Rate and Bill Impact Analysis and Model
2 passages 1 document

Transmission Planning across all matters →

E-12022 Rate and Bill Impact Analysis 2 passages
- produce a stream of annual values. These values are presented i[n Table 3,](#page-14-0) below. p. pp. 13-14
- produce a stream of annual values. These values are presented i[n Table 3,](#page-14-0) below. Table 3: Avoided T&D Cost Values Used for This Analysis Avoided T&D Costs – System Wide Year Transmission ($/kW-year) Distribution ($/kW-year)...

AI summary The text presents annual avoided T&D cost values for transmission and distribution from 2021 to 2040 in Table 3. These values are used for analysis, with carbon pricing benchmarks referenced in Table 4.

11 Table 1: Full range of avoided cost values used for this analysis p. p. 68
11 Table 1: Full range of avoided cost values used for this analysis CATEGORY YEARS DETAILS Capacity ($/kW-yr) 2011 - 2014 79 $/kW-yr 2009 IRP refresh (levelized over 2010-2032) 2015 – 2022 197 $/kW-yr 2014 IRP, Base DSM scenario (levelize...

AI summary The document presents Table 1, which outlines the range of avoided cost values used for analysis, including capacity, transmission, distribution, energy, and carbon costs from 2011 to 2040. These values are derived from various Integrated Resource Plans (IRPs) and adjusted for inflation and sensitivity analysis.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →