System Wide Avoided T&D Costs
p. p. 94
System Wide Avoided T&D Costs Transmission Distribution Total Year ($/kW-yr) ($/kW-yr) ($/kW-yr) 2023 $28.32 $30.44 $58.77 2024 $28.89 $31.05 $59.94 2025 $29.47 $31.67 $61.14 2026 $30.06 $32.30 $62.36 2027 $30.66 $32.95 $63.61 2028 $31.27...
AI summary The table presents projected system-wide avoided transmission and distribution costs from 2023 to 2051, showing a steady increase in costs over time. The data includes both transmission and distribution costs per kilowatt-year, with a 2% annual inflation rate used for extrapolation from 2051 to 2055.