Topic/Matter Intersection

Topic:"Transmission Planning" in M12623

Matter: Northeast Power Coordinating Council (NPCC) - Fourth Quarter 2025 for Approval of Revised Regional Reliability Criteria
4 passages 2 documents

Transmission Planning across all matters →

N-1Application - Directory 5 filing 3 passages
3.0 Radial Source Contingencies with Counter flow Transactions p. p. 21
3.0 Radial Source Contingencies with Counter flow Transactions Coincident with energy Transactions delivered out of the Balancing Authority on radial source tie line s, countervailing Transactions may be scheduled simultaneously into the B...

AI summary This section discusses radial source contingencies involving counter flow transactions on tie lines, highlighting the potential for large individual counter flow transactions and the methodology for allocating SAR assistance. It also addresses the challenges of reserve requirements when energy is delivered to multiple balancing authorities and the use of negative assistance shares in such scenarios.

Formatted: French (Canada) p. p. 76
Formatted: French (Canada) Area Initial Share/ Assistance Sought First Pass Second Pass Total Generation Picked Up When SAR Energy Is Total Gen. Picked Up After SAR Is Canceled And All ACEs = 0 Supplied Fully IESO 67 200 267 0 ISO-NE 67 20...

AI summary The table outlines the initial share and assistance sought by various entities during a contingency scenario, focusing on the total generation picked up when SAR energy is supplied fully and after SAR is canceled. NYISO and PJM are initially assigned half of their respective purchases from HQ-TE, resulting in a total assistance sought of 800 MW for the entire contingency amount.

NYISO - HQ-TE transaction = -500 MW (flow is NY to HQ-TE) HQ-TE – ISONE transaction = 2000 MW PJM – HQ-TE transaction = -500 MW (flow is PJM to HQ-TE) p. p. 76
NYISO - HQ-TE transaction = -500 MW (flow is NY to HQ-TE) HQ-TE – ISONE transaction = 2000 MW PJM – HQ-TE transaction = -500 MW (flow is PJM to HQ-TE) Area Initial Share/ Assistance Sought First Pass Second Pass Third Pass Total Generation...

AI summary The document outlines power transactions between various regional grid operators and Hydro-Quebec (HQ-TE), including flows from NYISO, PJM, and ISONE to HQ-TE, and details a table showing the distribution of energy generation and assistance sought during a contingency scenario involving the activation of ten-minute reserve (SAR) energy.

N-2Application - Directory 7 filing 1 passage
Preamble p. p. 37
ing requirements with respect to Table 3 of the NPCC Regional Reliability Reference Directory #1 "Design and Operation of the Bulk Power System." TFCO shall forward a summary of its findings to TFCP. - 2.4.4 TFCP shall review the technical...

AI summary The document outlines the process for reviewing and approving a proposed new or modified RAS. It specifies the roles of TFCO and TFCP in reviewing the RAS proposal and ensuring it meets transmission planning requirements as defined in the NPCC Regional Reliability Reference Directory.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →