N-12025 Wholesale and Renewable to Retail Market Report
8 passages
4.0 OPERATING STATISTICS 2 1 3 In 2025, there were a total of ten Accredited Market Participants as listed in Section 5 . 4 5 6 7 8 9 Figure 1 provides a list of Queued System Impact Studies 9 where NS Power provides an assessment by the T...
AI summary In 2025, ten Accredited Market Participants existed as per Section 5. Figure 1 lists Queued System Impact Studies assessing NS Power's transmission system adequacy for Firm Point-to-Point or Network Integration Transmission Service, including potential additional costs.
Figure 1: OATT Transmission Service Queues System Impact Studies Revised December 04,
AI summary A figure titled 'OATT Transmission Service Queues System Impact Studies Revised December 04' is referenced, indicating analysis of transmission service queues and their system impact under OATT.
12 2025 Item Project Date & Time of Service Request Project Type Project Location Requested In-Service Date Project Size (MW) Status 1 TSR 400 July 22, 2011 Point-to- point NS-NB May 2019 330 System Upgrades and Project Completed 2 TSR 411...
AI summary The document lists two transmission system reinforcement (TSR) projects, TSR 400 and TSR 411, detailing their dates, locations, sizes, and statuses. TSR 400 was completed in May 2019, while TSR 411 is expected to be completed in January 2028.
12.0 OUTAGE MANAGEMENT SYSTEM - Section 3.5 of the Market Rules (Outage Management) describes the NSPSO's coordination of - transmission system and generating facility outages to maintain the reliability of the bulk - electricity supply sy...
AI summary The NSPSO coordinates outage management per Section 3.5 of Market Rules to ensure bulk electricity system reliability. MP-09 outlines annual outage planning procedures, with details accessible via OASIS links for the Annual Transmission plan and calendar information.
2.4 Post an OASIS message following a Transmission Outage: Outages that are planned and scheduled in advance will be posted on the OASIS by the Outage Coordinator. The long-term schedule will only include 230kV and 345kV transmission outag...
AI summary The document outlines procedures for posting OASIS messages following transmission outages. Planned outages (230kV/345kV) affecting import/export or east-west flows must be posted. Unplanned outages with similar impacts also require OASIS messages, while minor outages are handled internally. Emergency conditions allow using the System Emergency message, and outage details (except causes) can be discussed with specific groups.
2.0 ENERGY DELIVERY (TRANSMISSION) OPERATIONS FUNCTION (BLUE BOX) Employees whose current job function provides them with information about the Energy Delivery (Transmission) System that could provide a competitive advantage to a power mar...
AI summary The document identifies employees with access to sensitive information about the Energy Delivery (Transmission) System, which could provide a competitive advantage to power marketers, highlighting potential conflicts of interest or information misuse concerns.
4.0 ENERGY DELIVERY (TRANSMISSION) & WHOLESALE MARKETING (WHITE BOX) Employees whose job function require a working knowledge of both Energy Delivery (Transmission) and Wholesale.
AI summary The document section focuses on employees requiring expertise in both Energy Delivery (Transmission) and Wholesale Marketing, highlighting the need for cross-functional knowledge in these areas.
Definitions Generation - Electricity generation is the process of generating electric power from sources of primary energy. For electric utilities in the electric power industry, it is the first stage in the delivery of electricity to end...
AI summary The document defines key terms in the electricity sector, including Generation, Transmission, Distribution, and Retail, detailing their processes, costs, and structures. It references a figure illustrating Domestic Cost of Service by Functional Areas, though the figure itself is not included in the text.