Topic/Matter Intersection

Topic:"Transmission Planning" in M12780

Matter: EfficiencyOne - 2027-2031 Demand Side Management (DSM) Plan Application
5 passages 5 documents

Transmission Planning across all matters →

E-12027-2031 DSM Plan Application 1 passage
18 Table 1: Full range of avoided cost values used for this analysis p. pp. 289-290
18 Table 1: Full range of avoided cost values used for this analysis CATEGORY YEARS DETAILS Capacity 2011–2014 79 $/kW-yr ($/kW-yr) 2009 IRP refresh (levelized over 2010-2032) 2015–2022 197 $/kW-yr 2014 IRP, Base DSM scenario (levelized ov...

AI summary The text presents Table 1, which outlines the full range of avoided cost values used for analysis across various categories such as capacity, transmission, distribution, energy, and carbon from 2011 to 2055. The values are based on different Integrated Resource Plans (IRPs) and include levelized and actual annual avoided cost streams, with inflation adjustments applied for certain years.

E-12E1 (NSEB) RIRs 1-66 - Redacted 1 passage
Total Energy Production (MWh) 6,884,910 p. p. 93
Total Energy Production (MWh) 6,884,910 Hydroelectric 1,285,912 Natural gas 3,029 Nuclear 4,846,327 Other biomass 25,698 Petroleum 5,103 Solar 17,293 Wind 236,034 Wood 465,513 Vermont is summer peaking with a load of 1,255 MW. Of the 6,900...

AI summary The document provides a breakdown of total energy production in Vermont, highlighting the contribution of various energy sources. It notes that Vermont has a summer peak load of 1,255 MW, with over 85% of generation coming from large-scale generators and CHP units, and most generators participating in ISO-NE's forward capacity market.

E-26CV - Sanem Sergici - The Brattle Group - NSPI 1 passage
ELECTRIFICATION p. p. 8
bstation, our team has also developed 8760 charging profiles for all EVs charging at the substation, allowing ERCOT to understand the implications for this new load for transmission planning purposes.

AI summary The team has developed 8760 charging profiles for all EVs charging at the substation, enabling ERCOT to assess the impact of this new load on transmission planning.

E-27CV - Sai P. Shetty - The Brattle Group - NSPI 1 passage
SELECTED CONSULTING EXPERIENCE p. pp. 3-4
ers for prospective loads in the region. This engagement involved analyzing the utility's initial proposal, conducting analysis to ensure complete cost recovery and recommendations on potential contract service agreements to minimize risks...

AI summary The text outlines Sai P. Shetty's consulting experience, including engagements related to cost recovery analysis, regulatory ratemaking reviews, and transmission cost allocation studies for National Grid. These engagements involved analyzing utility proposals and recommending strategies for regulatory processes.

102579Letter NSPI re: requests that its third-party experts, Sanem Sergici and/or Sai Shetty of The Brattle Group, participate virtually 1 passage
SELECTED CONSULTING EXPERIENCE p. p. 29
SELECTED CONSULTING EXPERIENCE - Impact Evaluation of Time-of-Use (TOU) Pilot. Assisted three utilities in Maryland in quantifying the residential load impacts over the first summer of a three-year TOU pricing pilot. Conducted econometrics...

AI summary The text outlines selected consulting experiences involving impact evaluations of time-of-use and peak time rebate programs, alternative rate design for net energy metering, and analysis of revenue cap mechanisms and transmission networks for ratemaking purposes.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →