Topic/Matter Intersection

Topic:"Transmission Planning" in M12842

Matter: Nova Scotia Power Inc. - CI C0083591 – IR746 Petpeswick Community Solar - $0 (U&U)2026 Q1 Capital Reports
2 passages 1 document

Transmission Planning across all matters →

N-1CI C0083591 – IR746 Petpeswick Community Solar - $0 - Redacted 2 passages
Document No: XXX-XX-XXXX-XXXX p. p. 2
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Transmission Line Infrastructure Required fields: Stakeholder Consultation/Engagement/Management Plan Defined (D) NR P D D D Work Breakdown Structure (...

AI summary This document outlines a checklist and maturity matrix for the project cost estimate of a transmission line infrastructure project. It includes various required fields such as stakeholder consultation plans, work breakdown structures, and design specifications, with statuses ranging from 'Defined (D)' to 'Complete (C)' and 'Not Applicable (NA)'.

5.4 Impact on Transmission System p. pp. 23-24
5.4 Impact on Transmission System At maximum generation, IR#746 – Petpeswick Solar generator site injects 2.2 MW onto substation through a 12.47 kV distribution circuit. This does not exceed the minimum substation load for and is not expec...

AI summary The Petpeswick Solar project's 2.2 MW generation at maximum capacity is injected into a substation via a 12.47 kV distribution circuit. This does not exceed the substation's minimum load and is not expected to impact existing transmission infrastructure.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →