Matter: Nova Scotia Power - Emergency Services Restoration Plan - 2026 Drill Report
1 passage 1 document

Transmission Planning across all matters →

N-12026 Drill Report 1 passage
6.6.5 Control Centre Operations Lead p. pp. 35-37
6.6.5 Control Centre Operations Lead The Control Centre has the responsibility for the integrity and the safe and effective operation of the Transmission and Distribution Systems. The Control Centre follows its System Operating Procedures...

AI summary The Control Centre Operations Lead is responsible for ensuring the safe and effective operation of the Transmission and Distribution Systems, providing the EOC with information on power system performance, and coordinating with the RPP team. The EOC, in turn, ensures timely information sharing with the Control Centre regarding restoration efforts and event impacts.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →