Why do this project now?
p. p. 1
Why do this project now? Delaying the project beyond 2010 increases the risk of a shroud failure, which could result in an unplanned unit outage of significant duration. The OEM has confirmed that the weld repair carried out in 2009 should...
AI summary The project should proceed now to avoid the risk of a shroud failure, which could lead to a prolonged unplanned outage. The OEM has stated that the 2009 weld repair is only a temporary solution until replacement blades arrive in 2010.