HomeUnplanned OutageM03324Evidence
Topic/Matter Intersection

Topic:"Unplanned Outage" in M03324

Matter: E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria
6 passages 2 documents

Unplanned Outage across all matters →

N-10Reliability Standards of the North American Electric Reliability Corporation 7/5/2010 4 passages
Section 715 p. p. 60
sectionalizing breaker to clear a permanent Phase to Ground Fault. - 1.2. SOLs shall be established such that for multiple Facility Contingencies in E1.1.1 through E1.1.5 operation within the SOL shall provide system performance consistent...

AI summary The text outlines requirements for System Operating Limits (SOLs) to ensure system performance during multiple facility contingencies, including maintaining thermal, frequency, and voltage limits, preventing cascading failures, and ensuring stability. It also mentions adjustments based on system performance and design.

Preamble p. p. 171
3Ø Fault, with Delayed Clearing e (stuck breaker or protection system failure): - 1. Generator 3. Transformer - 2. Transmission Circuit 4. Bus Section 3Ø Fault, with Normal Clearinge : - 5. Breaker (failure or internal Fault) - 6. Loss of...

AI summary The text outlines various three-phase fault scenarios in power systems, including both delayed and normal clearing cases, and their potential impacts on the grid. It discusses risks such as loss of generation, customer demand, and system stability, as well as mitigation strategies like load shedding and curtailments. The document emphasizes the importance of evaluating these events through joint studies and adhering to NERC reliability standards.

Matrix of Violation Risk Factors for Approval p. p. 131
Matrix of Violation Risk Factors for Approval Standard Number Requirement Text of Requirement Violation Number Risk Factors IRO-014-1 R1.1.2. Energy and capacity shortages. MEDIUM IRO-014-1 R1.1.3. Planned or unplanned outage information....

AI summary This matrix outlines risk factors for violating reliability standards, focusing on energy shortages, outage information, voltage control, and coordination among reliability coordinators. The risk levels range from medium to lower, indicating the potential for non-compliance with specific requirements.

Matrix of Violation Severity Levels for Approval p. p. 131
Matrix of Violation Severity Levels for Approval Standard Number Requirement Number Text of Requirement Lower VSL Moderate VSL High VSL Severe VSL FAC-003-1 R3.3. The outage information provided by the Transmission Owner to the RRO, or the...

AI summary The document outlines a matrix that categorizes the severity levels of violations related to the provision of outage information by Transmission Owners to the RRO or its designee, based on the number of required elements missing from the report.

07810Quarterly Application for Approval of Reliability Standards of the North American Electric Reliability Corporation - September 2, 2011 9/6/2011 2 passages
2.Violation Severity Levels p. p. 55
R 2. T he Tr iss ion O to an sm p er a r d Fa i l i Ra ing to te ty t us e on e n c s ha d i f fe fro ho t t w t t er e re n m se i f ie d by Tr iss ion sp ec a an sm o r Ge Ow in he ir to t ne ra r ne r Tr iss ion de l. an sm m o T he Tr...

AI summary The text discusses the transmission outage frequency and severity levels, noting that the transmission system experienced outages due to failures in the transmission line and equipment. The discussion highlights the impact of these outages on reliability and service.

Matrix of Violation Risk Factors for Information p. p. 28
Matrix of Violation Risk Factors for Information S d d Nu b ta n a r m e r Re ire t q m e n u Nu b m e r Te f Re ire t o t q m e n x u V io la io R is k t n Fa to c r MOD-001-1a R3.6.1. The criteria used to determine when an outage that is...

AI summary The document discusses MOD-001-1a, which relates to criteria for determining when an outage that occurs part of a day impacts daily calculations, and it is currently pending.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →