HomeUnplanned OutageM03626Evidence
Topic/Matter Intersection

Topic:"Unplanned Outage" in M03626

Matter: CI# 38943 - P-128.10 - NSPI WO - LIN1 Boiler Refurbishment - $1,653,592
3 passages 2 documents

Unplanned Outage across all matters →

N-1Redacted Work Order 2 passages
Why do this project? p. p. 1
Why do this project? This project is required to maintain the long term reliability of the boiler and mitigate the risk of unplanned outages due to L TSH, HTSH and division wall tube leaks.

AI summary This project is necessary to ensure the long-term reliability of the boiler and reduce the risk of unplanned outages caused by leaks in L TSH, HTSH, and division wall tubes.

Reason for Variance / Over Expenditure / Final Costing p. p. 1
Reason for Variance / Over Expenditure / Final Costing 14954263 The original project scope in 2010 ACE was based primarily on replacement and repairs of L TSH and HTSH tubing. Boiler inspection results from late 2009 indicated that tube re...

AI summary The original 2010 ACE project scope involved replacing and repairing L TSH and HTSH tubing. However, boiler inspections and tube failures, including a leak in January 2010, necessitated additional work to address increased ash erosion and reduce the risk of future leaks and unplanned outages, leading to a $640,000 variance.

N-2Responses to Information Requests (IR-1 to IR-8) 1/12/2011 1 passage
Section 8 p. p. 4
1 Response IR-3: (cont'd) 2 - 3 The scope of work included in the ATO for CI 38943 is a result of unplanned work that includes - 4 the division wall scope and significant preventive measures such as shielding and padding in - 5 response to...

AI summary The response to IR-3 discusses unplanned work resulting from higher ash fuel consumption and unexpected wear due to aggressive ash loading, including preventive measures like shielding and padding.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →