1 Request IR-1:
p. p. 5
NON-CONFIDENTIAL 1 Request IR-1: 1 classified either as U&U or as planned projects to be executed during subsequent 2 outages. 3 4 (ii) It is anticipated that future projects will have a similar work to that described in part 5 (c)(i). The...
AI summary The text discusses the classification of projects as either unplanned or planned, and outlines the scope and timing of refractory work on boiler systems, guided by NS Power's Asset Management Methodology. It emphasizes the importance of this work for safe and efficient boiler operation and minimizing unplanned outages.