HomeUnplanned OutageM12418Evidence
Topic/Matter Intersection

Topic:"Unplanned Outage" in M12418

Matter: Nova Scotia Power Inc. - CI 49036 – HYD - Avon 2 Controls Upgrade - $1,073,463
1 passage 1 document

Unplanned Outage across all matters →

N-2NSPI (NSEB) RIR 1 to 7 1 passage
1 Request IR-1:
NON-CONFIDENTIAL 1 Request IR-1: 23 (d) NS Power will be installing a Layer 3 switch to segment networks by protocol using 24 separate VLANS. The Layer 3 switch will connect the PLC, the voltage regulator, the 25 protection elements within...

AI summary NS Power plans to install a Layer 3 switch to segment networks by protocol using VLANs, connecting PLCs, voltage regulators, protection elements, and RTUs. This infrastructure will support data collection for enhanced monitoring and improve response to unplanned outages. NS Power also outlines a structured methodology for control system upgrades, involving site surveys, documentation reviews, and stakeholder consultations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →