N-18Response to Undertakings - Redacted 1 passage
Contingencies p. p. 72
Contingencies The transfer analysis simulated contingencies, namely the unplanned outage of system elements, to ensure that the system would remain reliable during the energy transfer. The following NERC Reliability Standard TPL-001-5.1[38...

AI summary The transfer analysis simulated unplanned outages of system elements to ensure system reliability during energy transfer. NERC Reliability Standard TPL-001-5.1 was used, focusing on P1 contingencies such as loss of generators, transmission lines, and transformers operating at 100 kV or above.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →