HomeUnplanned OutageM12742Evidence
Topic/Matter Intersection

Topic:"Unplanned Outage" in M12742

Matter: Nova Scotia Power Inc. - 2025 Annual FAM Report  (Fuel Adjustment Mechanism)
2 passages 2 documents

Unplanned Outage across all matters →

N-2NSPI (NESB) RIR 1 to 17 - Redacted 1 passage
2025 Annual FAM Report (NSEB M12742) NSPI Responses to NSEB Information Requests p. p. 3
2025 Annual FAM Report (NSEB M12742) NSPI Responses to NSEB Information Requests 1 Request IR-9: 2 3 Reference: Tab A6(3)NC 4 5 In rows 21 and 23, Point Tupper and Point Aconi demonstrated substantially improved 6 DAFORs relative to the pr...

AI summary NSPI explains that improved DAFOR performance at Point Tupper and Point Aconi in 2025 was due to corrective actions taken after forced outage events in 2024. Additionally, NSPI confirms that only one of the 91 listed forced outages had a Root Cause Analysis (RCA) conducted.

101683NSEB (NSPI) IR-1 to IR-17 - Redacted 1 passage
Request IR-10:
Request IR-10: - Reference: Tab A6(4b) - a) Please confirm that of the 91 listed forced outages, a Root Cause Analysis has been or will be conducted for just one of them. If not confirmed, please explain.

AI summary The document requests confirmation that a Root Cause Analysis has been or will be conducted for only one of the 91 listed forced outages, and if not, an explanation is required.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →