Matter: Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000
1 passage 1 document

Upfront Costs across all matters →

B-1-(ii)Appendix 2 - HSV-2024-043-CA02 Additional Costed Option Scenarios - Factorydale 1 passage
Table 1: NORCAN unit – results on the three different scenarios of water flow p. p. 10
Table 1: NORCAN unit – results on the three different scenarios of water flow Capacity kW Electricity KWh Initial costs $ Electricity export revenue $ Fuel cost $ O&M costs (savings) $ Simple payback Yr Factorydale - Beaverbank Ext -NEW -...

AI summary The table presents results for three different water flow scenarios at the NORCAN unit, showing variations in capacity, initial costs, fuel costs, and simple payback periods. The scenarios are based on similar flow duration curves, and the results show minimal differences between the Beaverbank and Cornwallis stations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →