1.2 Background - This is the third Application in which IESO Nova Scotia seeks approval of its proposed revenue - requirements under s.29 of the MAEA, but is the first such application in which approval is - sought for other proposed expen...
AI summary IESO Nova Scotia is seeking approval from the Nova Scotia Energy Board for its proposed revenue and expenditure requirements under section 29 of the More Access to Energy Act (MAEA). This application marks the first time the organization is seeking approval for expenditures beyond revenue requirements. The text outlines the organizational maturation of IESO Nova Scotia, which transitioned from a board-only entity to a fully staffed organization capable of performing system planning, resource procurement, and interconnection processes following the transfer of functions from Nova Scotia Power.
2.2 Legislative Mandate and Business Plan - The MAEA established IESO Nova Scotia as an independent, not-for-profit energy system - operator and assigned it responsibilities for electricity system planning, the procurement of - energy reso...
AI summary The text outlines the legislative mandate of IESO Nova Scotia as established by the More Access to Energy Act (MAEA). It describes the organization's role as an independent, not-for-profit energy system operator responsible for electricity system planning, resource procurement, and transmission interconnection. The document details a phased transition of responsibilities from Nova Scotia Power, noting that Phase 1 (planning and procurement) is complete, while Phase 2 (real-time system operations) is ongoing. The 2027/2028 Business Plan serves as both an annual operating plan and a transition roadmap for these institutional changes.
2.3.6 Build a Strong Organization Where People Want to Work and Grow - The sixth enterprise priority recognizes that IESO Nova Scotia can discharge its mandate only if - it is able to attract and retain talented individuals with the requis...
AI summary IESO Nova Scotia outlines its enterprise priority to build a capable workforce to fulfill its mandate under the More Access to Energy Act. The organization plans to implement leadership development, succession planning, and recruitment strategies, particularly as it assumes specialized operational responsibilities from Nova Scotia Power. The text emphasizes that a qualified workforce is essential for system reliability and safety. Associated costs are categorized under functional and Human Resources categories, with specific provisions for capitalizing employee costs related to the Control Centre project.
Requirements of the More Access to Energy Act - The More Access to Energy Act (MAEA) requires the transition of system operator responsibilities - from Nova Scotia Power Incorporated (NS Power) to IESO Nova Scotia. In accordance with the -...
AI summary The text discusses the requirements of the More Access to Energy Act (MAEA), which mandates the transition of system operator responsibilities from Nova Scotia Power Incorporated to IESO Nova Scotia. To fulfill these statutory obligations, IESO Nova Scotia must establish a control centre equipped with necessary personnel, systems, and business processes. The document references specific analyses, including the IBM Control Centre Options Analysis and the FTI IESO Nova Scotia Value Case Report, to justify the proposed expenditures for the Phase 2 Control Centre.
Scenario 1 - IESO Lite: Scenario 1 represents the lowest-independence model. Under this approach IESO Nova Scotia would perform planning, monitoring and advisory functions while NS Power retained responsibility for real-time BA and TOP ope...
AI summary The text evaluates 'Scenario 1 - IESO Lite,' a low-independence model where IESO Nova Scotia handles planning and advisory functions while Nova Scotia Power retains real-time Balancing Authority and Transmission Operator responsibilities. While noted as a low-cost, simple implementation, the scenario fails to meet More Access to Energy Act (MAEA) requirements and long-term goals for operational independence. The document also defines technical components including day-ahead P×Q pairs, SCADA systems, Energy Management Systems (EMS), and the NSP optimizer (ECCPO) for resource dispatch optimization.
11 Control Center Build 12 Control Centre Build includes the design, construction, fit-out, physical security systems, and 13 commissioning of t he IESO Nova Scotia Control Centre at the Atlantic Data Centre. This includes 14 t he dedicate...
AI summary The Control Centre Build involves the design, construction, and commissioning of the IESO Nova Scotia Control Centre at the Atlantic Data Centre. This facility is a foundational component for the transition to an independent system operator under the More Access to Energy Act (MAEA). It enables IESO Nova Scotia to independently manage real-time operations of Nova Scotia's bulk electricity system and assume Balancing Authority (BA) and Transmission Operator (TOP) responsibilities, independent of Nova Scotia Power.
Phase 2A Workstreams (GRA) Governance & Regulatory - Market Rules & Open Access Transmission Tariff (OATT) Establish the governance, regulatory change management, stakeholder approval, and agreement frameworks needed to support the IESO NS...
AI summary The document outlines the specific workstreams for Phase 2A of a project aimed at establishing the Independent Electricity System Operator Nova Scotia (IESO NS). The workstreams are categorized into Governance & Regulatory (covering market rules, OATT, and NERC compliance), Technology & Communications, Control Centre infrastructure, and Operational Frameworks (focused on processes and people). These activities are designed to ensure regulatory compliance, cybersecurity, and operational readiness for the transition to a new market model.
3.2.7 Project Governance and Risk Management - Given the importance of this Project for IESO Nova Scotia's system dispatch and operation - function under the MAEA, the organization has established a strong governance framework, - including...
AI summary IESO Nova Scotia outlines its governance and risk management framework for the transition of system operator functions from Nova Scotia Power, as mandated by the More Access to Energy Act. The framework includes a Transition Committee under the Board of Directors for oversight, a Project Decision Board for approving key milestones, and a Project Management Office to manage the scope, budget, and schedule of Phase 2. The organization also emphasizes proactive risk identification and mitigation strategies to address the project's complexity.
Scope This policy applies to all employee benefits provided by IESO Nova Scotia, including: - Short-term employee benefits such as paid annual leave and paid sick leave; and - Post-employment benefits in the form of a registered defined co...
AI summary The document defines the scope of the employee benefits policy for IESO Nova Scotia. It specifies that the policy covers short-term benefits, including paid annual leave and paid sick leave, as well as post-employment benefits provided through a registered defined contribution pension plan. It explicitly clarifies that IESO Nova Scotia does not provide defined benefit pension plans or any other long-term or termination benefits outside of these specific provisions.
CONTROL ENVIRONMENT The control environment refers to the set of standards, processes, and structures that provide the basis for carrying out internal control across IESO Nova Scotia. As a new organization, this environment was established...
AI summary The text describes the establishment of the control environment at IESO Nova Scotia, which serves as the foundation for its internal control framework. This environment was shaped by the appointment of an experienced Board of Directors who set a 'tone from the top' through the adoption of a Board Code of Conduct and a Procurement Policy. Key governance structures include the creation of an Audit and Risk Committee to oversee risk management and internal controls as the organization scales its operations.
9.0 AUDIT AND OVERSIGHT The More Access to Energy Act provides the following with respect to audit:
AI summary This section introduces the regulatory framework for audit and oversight as mandated by the More Access to Energy Act. It serves as a heading for the requirements regarding auditing procedures, compliance, and oversight mechanisms within the regulatory proceeding.
Priority 4 - Build External Trust and Shape Energy Policy to Benefit Nova Scotians Key Activity/ Project Description Estimated Completion MAEA Linkage NERC & NPCC Compliance Activities -Completion of compliance activities associated with T...
AI summary IESO Nova Scotia outlines its Priority 4 objectives to build external trust and shape energy policy. Key activities include ensuring compliance with NERC and NPCC reliability standards, submitting quarterly reports to the Nova Scotia Energy Board, and fulfilling annual reporting requirements under the More Access to Energy Act. The organization also commits to co-developing an Indigenous Relations Framework with Mi'kmaw consultants and launching a public education initiative to improve energy literacy and transparency regarding the province's electricity system.
Priority 6 - Build a Strong Organization Where People Want to Work and Grow Key Activity/ Project Description Estimated Completion MAEA Linkage Build Employee and Leadership Capability - -Implement development plans for employees and leade...
AI summary The document outlines Priority 6 for the Independent Electricity System Operator - Nova Scotia (IESO-NS), which focuses on organizational development and human capital. Key initiatives include building employee and leadership capabilities through targeted learning plans to meet expanding mandates, and establishing succession and knowledge-transfer plans to preserve institutional knowledge. These activities are intended to be completed by Q4 2027/2028, though the underlying processes are expected to remain ongoing as the organization matures.
Why it matters: - Fastest, lowest-risk path to operational independence - Delivers early value and meets legislative expectations - Provides the operational footing needed for later phases
AI summary The text highlights the strategic importance of achieving operational independence, characterizing it as the fastest and lowest-risk pathway forward. It emphasizes that this objective delivers early value, satisfies legislative expectations, and establishes the necessary operational foundation required for the subsequent phases of the project.
Scenario 1 - IESO Lite Scenario 1 represents the lowest-independence model. Under this approach IESO-NS would perform planning, monitoring and advisory functions while NSP retained responsibility for real-time BA and TOP operations. No ind...
AI summary The document describes 'Scenario 1 - IESO Lite,' which is characterized as the lowest-independence model for the IESO-NS. In this scenario, IESO-NS would handle planning, monitoring, and advisory functions, while Nova Scotia Power (NSP) would maintain responsibility for real-time Balancing Authority (BA) and Transmission Operator (TOP) operations without establishing an independent control centre or operational systems. While noted for its low cost and simplicity, the model is deemed insufficient for achieving long-term goals regarding operational independence, transparency, and direct accountability.
Scenario 2 - Shared Operations Scenario 2 achieves a faster transition by leveraging NSP's existing operational systems and control room infrastructure. IESO-NS personnel would utilize shared systems and facilities, minimizing implementati...
AI summary The document describes 'Scenario 2 - Shared Operations,' a model where the Independent Electricity System Operator - Nova Scotia (IESO-NS) utilizes Nova Scotia Power Inc.'s (NSP) existing operational systems and control room infrastructure. While this approach accelerates the transition and minimizes implementation costs and timelines, it creates significant operational, cyber, and governance dependencies on NSP. The text notes that while technically feasible, this model restricts the future flexibility and independence of the IESO-NS.
5.1. Basis for Scenario Ranking by Assessment Criteria Building on the scoring results shown in Fig. 5, this section describes the basis for Scenario 4's ranking against each of the five overarching assessment criteria defined earlier in t...
AI summary The document evaluates Scenario 4 against four key assessment criteria to justify its ranking as the preferred pathway. It highlights that Scenario 4 provides the best balance between operational independence and system reliability compared to less independent options. It also demonstrates superior alignment with the More Access to Energy Act by establishing independent control center operations and governance. Furthermore, the assessment concludes that Scenario 4 offers the most cost-effective balance of value and risk, maximizing long-term benefits for Nova Scotians while remaining affordable.
6. IBM Recommendation: Scenario 4 - Enhanced Independence IBM recommends that IESO-NS adopt Scenario 4 – Enhanced Independence as the preferred long-term operating model for Phase 2. IBM's assessment is that Scenario 4 as the preferred lon...
AI summary IBM recommends Scenario 4 – Enhanced Independence as the preferred long-term operating model for Phase 2 of the IESO-NS transition. This scenario is designed to provide IESO-NS with the operational independence required to assume BA and TOP functions. IBM justifies this recommendation based on its superior balance of legislative alignment with the MAEA, operational reliability, transparency, long-term value creation, and a feasible phased delivery approach compared to other strategic scenarios.
Why it matters: - Fastest, lowest-risk path to operational independence - Delivers early value and meets legislative expectations - Provides the operational footing needed for l;itcr phases
AI summary The text highlights the strategic importance of achieving operational independence, characterizing it as the fastest and lowest-risk pathway for the utility. It emphasizes that this transition delivers early value, fulfills legislative expectations, and establishes the necessary operational foundation required for subsequent project phases.
7.1. Phase 2A Phase 2A is the first phase within Steady State 1, and is the recommended first implementation milestone and a credible initial operating step for IESO-NS. Steady State 1 is intended to establish operational independence whil...
AI summary Phase 2A is the initial implementation milestone of Steady State 1, designed to establish operational independence for the IESO-NS. The phase aims to enable safe and compliant BA and TOP operations by utilizing an independent IESO-NS control room while leveraging specific NSP-hosted systems to avoid infrastructure duplication. Key objectives include establishing clear decision-making authority, ensuring regulatory compliance with the More Access to Energy Act, and delivering early operational benefits to Nova Scotians.
7.1.1.3. Newly Built Components Newly built components are new capabilities established directly within IESO-NS to support operational decision-making, governance, compliance, and control room operations. These capabilities form the founda...
AI summary The text describes the newly built components within the IESO-NS, which are essential capabilities established to support governance, compliance, operational decision-making, and control room operations. These components serve as the fundamental infrastructure for the IESO-NS' independent operating model.
12. Conclusion and IBM Recommendation IBM recommends that IESO-NS proceed with Scenario 4 – Enhanced Independence as the preferred long-term operating model for Phase 2, implemented through a phased 2A / 2B / 2C pathway. This recommendatio...
AI summary IBM recommends that IESO-NS adopt 'Scenario 4 – Enhanced Independence' as the preferred long-term operating model for Phase 2, following a phased implementation pathway (2A, 2B, and 2C). This recommendation is based on cost-benefit analyses and legislative alignment with the More Access to Energy Act. Key benefits include achieving independent operational control, protecting system reliability, and delivering an estimated $219 million NPV with annual benefits of $21 million starting in 2029/30.
Executive summary - ES.1 FTI Consulting ("FTI" or we) has been retained by the Nova Scotia Independent Energy System Operator ("IESO-NS" or the "IESO") to examine the Business Case and Value Framework of transitioning from an investor-owne...
AI summary FTI Consulting was retained by the Nova Scotia Independent Energy System Operator (IESO-NS) to evaluate the business case and value framework of transitioning from a vertically integrated utility (VIU) model to an independent system operator (ISO) model. The transition aims to enhance transparency and investment opportunities amidst Nova Scotia's electricity sector transformation. The report estimates that the transition will deliver strategic benefits—impacting cost, reliability, and environmental performance—quantified at approximately $500 million to $2.4 billion over the 2026-2050 period.
The transition from the VIU model to IESO-NS - ES.6 The newly created IESO-NS is an independent, non-profit organization currently entrusted with responsibility for planning and procurement and eventually reliably operating the province's...
AI summary The document outlines the transition of Nova Scotia's bulk electricity system from a Vertically Integrated Utility (VIU) model to the IESO-NS model. IESO-NS is an independent, non-profit organization tasked with planning, procurement, and eventual operation of the province's bulk electricity system. The transition is structured in two phases: Phase 1, currently established, covers planning, IRP processes, and procurement; Phase 2, planned for 2027/28, will involve day-to-day operational roles and transmission grid operation.
Anticipated benefits of an ISO - ES.10 In Chapter 3, we describe the anticipated benefits and costs of an ISO in Nova Scotia, in contrast to a VIU model. An investor-owned VIU model, even with regulatory guardrails, inherently creates the...
AI summary The text outlines the anticipated benefits of establishing an Independent System Operator (ISO) in Nova Scotia compared to a Vertically Integrated Utility (VIU) model. It argues that an ISO reduces potential conflicts of interest by providing independent, not-for-profit oversight of system planning and operation. Furthermore, the ISO structure is presented as a supportive framework for the competitive procurement of new energy resources introduced by Nova Scotia's Energy Reform (2024) Act.
1. The transition from the vertically integrated utility model to IESO-NS - 1.1 IESO-NS is the most recently founded ISO[10](#page-27-0) in North America, having been directed by the Provincial Government in 2024. IESO-NS was formed follow...
AI summary The text describes the establishment of IESO-NS, an independent, non-profit Independent System Operator (ISO) in Nova Scotia, directed by the provincial government in 2024 following a Clean Electricity Solutions Task Force report. IESO-NS is tasked with planning, procurement, and eventually operating the province's bulk electricity system. The transition from Nova Scotia Power (NSP) occurs in two phases: Phase 1 involves planning, transmission planning, interconnection, and resource procurement; Phase 2, planned for 2027-2028, focuses on operational planning and system balancing.
ator of Ontario ("IESO Ontario"). OPG is fully owned by the province of Ontario and an important share of its current generation assets are legacy assets from the former VIU structure;[20](#page-31-3) 17 Transpower is the state-owned owner...
AI summary The text discusses the organizational structures of electricity markets globally, focusing on the roles of Independent System Operators (ISOs) and Vertically Integrated Utilities (VIUs). It highlights the distinction between state-owned and privately owned entities, noting that many Canadian VIUs are government-owned. The document also examines the functional separation of asset classes in various jurisdictions, such as New England, where transmission planning often remains with the utility despite market liberalization.
IESO role transition 3.4 The rationale for establishing the IESO was to create an independent body with enhanced focus on the system's energy requirements.[52](#page-48-1) The IESO transition is planned in two phases (as explained in more...
AI summary The document outlines the planned two-phase transition of roles to the Independent Electricity System Operator Nova Scotia (IESO-NS). Phase 1 focuses on long-term planning and procurement functions, while Phase 2 involves real-time operations. The transition aims to create an independent body to manage system energy requirements, reducing potential bias. While operational roles will transition from Nova Scotia Power (NSP), NSP will retain ownership of the transmission system. The report intends to evaluate the benefits and cost implications of these role transfers.
Transmission planner and long-term security of supply - A1.1 The creation of an ISO in Nova Scotia has been under consideration for well over a decade.[96](#page-87-0) In recent years, public opinion of NSP as a VIU with conflicting incent...
AI summary The text discusses the ongoing debate regarding the creation of an Independent System Operator (ISO) in Nova Scotia. It argues that Nova Scotia Power (NSP), acting as a Variable Independent Utility (VIU), faces an inherent conflict of interest between its duty to provide reliable, affordable electricity and its obligation to generate profit for shareholders. This conflict may lead to biased system planning, where the utility might delay transmission upgrades to protect its core generation business or avoid costs due to rate pressures.
Market design - A1.17 Market design includes rules and mechanisms that govern trading and access. Market access is improved by aligned incentives to find capacity for new connections and timeliness of connection responses. Vertically integ...
AI summary The text discusses market design principles, emphasizing that rules and mechanisms must govern trading and grid access fairly. It highlights how vertically integrated businesses can create barriers to entry for competitors through pricing rules and physical grid access. Specifically, it notes that market designs favoring locational signals may be resisted by network owners as they reduce the need for new assets. Additionally, the text identifies potential conflicts of interest when incumbents like Nova Scotia Power (NSP) perform feasibility and interconnection studies, potentially deterring new generation and storage projects.
Industry governance: Improved reliability standards and grid codes A1.21 The ISO may, as an independent and knowledgeable neutral entity, help to implement reliability standards and set grid codes better reflecting the economic trade-off b...
AI summary The text discusses the role of an Independent System Operator (ISO) in establishing reliability standards and grid codes. It highlights the ISO's ability to act as a neutral entity to balance the economic trade-off between investment costs and load served. The document notes that Variable Independent Utilities (VIUs) may face conflicting pressures between maintaining strict reliability standards and ensuring ratepayer affordability, and emphasizes that an independent ISO helps avoid conflicts of interest inherent in entities that own generation or transmission assets.
INTRODUCTION The Small Business Advocate (the "SBA") represents small business customers of regulated electricity utilities in Nova Scotia, including Nova Scotia Power Inc. ("NSPI"), Nova Scotia Power Maritime Link Inc. ("NSPML") and Effic...
AI summary The Small Business Advocate (SBA) provides an overview of its regulatory activities for the 2025 calendar year in Nova Scotia. The SBA represents small business customers across three rate classes, advocating for reliability and affordability. Key activities in 2025 included engaging with the newly created Nova Scotia Independent Energy System Operator (IESO-NS), participating in the Wasoqonatl Transmission Incorporated (WTI) NS-NB Reliability Intertie Project, and reviewing various rate applications and plan extensions for Nova Scotia Power Inc. (NSPI), Nova Scotia Power Maritime Link Inc. (NSPML), and Efficiency One (E1).
9.1 Purpose. The Landlord may by Notice impose regulations not inconsistent with the other provisions of this Lease for the orderly operation of the Building. The present regulations are attached to this Lease.
AI summary This section establishes the Landlord's authority to impose building regulations as an attachment to the Lease. These regulations are intended to ensure the orderly operation of the building and are permitted provided they do not conflict with the existing lease provisions.