Matter: P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2023
3 passages 2 documents

Wholesale Market Operation across all matters →

N-1Report 2 passages
Section 26
23 changes and additions over the 10-year period to this total capacity are shown in Figure . The firm 24 generating capability for the wholesale market participants is set out in Figure 4. 25 DATE FILED: June 30, 2023 Page 10 of 59 2023 1...

AI summary The document outlines the 2023 10-Year System Outlook, referencing figures that detail NS Power's and Independent Power Producers' (IPPs) firm generating capability. It highlights capacity changes over a decade and references wholesale market participants, focusing on winter net capacity metrics.

Section 31
134.9 Total Capacity 2593.7 1 2 Figure 4: Firm Generating Capability for Wholesale Market Participants 3 Winter Net Wholesale Market Participant Fuel Type Capacity 12 (MW) Backup Top-Up (BUTU) 13 Wind [Ellershouse 14] 4.2 Backup Top-Up (BU...

AI summary The document presents a figure detailing wholesale market participants' firm generating capacity, including wind projects with 18% ELCC. Footnotes reference a Board decision (M09940) aligning with NS Power's planning practices, which assign 18% ELCC to wind and 0% to non-firm imports. The text also notes municipal load participants and the Ellershouse wind farm owned by AREA.

91323NSUARB (NSPI) IR-1 to IR-12 1 passage
Section 3
Document: 305605 (P-194) Date Filed: Sept. 22, 2023 NSUARB (NS Power) Page 1 of 4 1 Request IR-1: 2 Referencing page 6 of 59 and Figure 6 on page 19 of 59, NS Power stated that the results of the 3 2022 IRP evergreen scenario CE1-E1-R2 wer...

AI summary The document outlines six requests for clarifications and updates related to Nova Scotia Power's Integrated Resource Plan (IRP), including project status updates, interruptible load changes, capacity contributions from the Maritime Link, energy mix shifts, capital investment tables, and system upgrade details for TSR 400. Requests focus on data accuracy, project timelines, and alignment with regulatory expectations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →