Board consultant Synapse Energy Economics issued four information requests to Nova Scotia Power regarding its 2010 Transmission Line Insulator Replacement work order (CI# 38110), with responses due January 12, 2011.
AI summary
- Synapse Energy Economics, acting as Synapse Energy Economics Board Staff Consultant, issued IR-1 through IR-4 to Nova Scotia Power Incorporated on December 22, 2010, targeting the $2,236,168 Capital Expenditures work order for transmission line insulator replacement.
- IR-1 and IR-2 request circuit-level data on the number of insulators and wood poles replaced, total overhead conductor replaced in 2010, and justification for including three circuits that recorded zero failures during the 2003–2009 baseline period.
- IR-3 seeks a circuit-by-circuit comparison of estimated versus actual labour and material costs from the 2010 ACE Plan, along with explanations for any variances.
- IR-4 requests the average age of insulators being replaced under the program, bearing on asset condition and Asset Management rationale.
- Responses are directed to NSPI Manager of Capital Lee Thomson-Lutz, with three hard copies and a searchable PDF due by January 12, 2011.
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →