· Order · unknown
Nova Scotia's first standalone DSM regulator, Efficiency Nova Scotia Corporation, wins approval for a $43.7 million 2012 electricity demand-side management plan, with the Board accepting 2010 program savings of roughly 82–85 GWh while ordering improvements to free-ridership measurement, rate-impact analysis, and evaluation methodology.
AI summary
- The NSUARB approved Efficiency Nova Scotia Corporation's (ENSC) Demand Side Management plan for 2012 at the $43.7 million budget as filed, targeting 233.6 GWh in annual energy savings drawn from ENSC programs, prior-year overachievements, extra-large industrial (ELI) customer projects, and codes-and-standards contributions — though Board consultant Mel Whalen and the Ecology Action Centre argued the plan's direct program savings of ~124 GWh fell short of the 2011 target of 158.5 GWh and urged a budget increase to roughly $53–58 million.
- The 2010 savings verification study (H. Gil Peach & Associates / Scan America) recommended accepting NMR Group's evaluated results for all programs except a 10% downward adjustment for the Efficient Products – Direct Install program due to the non-standard melding of evaluator sample data with tracking-system data, placing total verified portfolio savings at ~82.45 GWh and 15.85 MW; the Board adopted these findings.
- The Board ordered ENSC to address thirteen specific Program Evaluation and methodology action items from the savings verification study, including conducting a Nova Scotia socket study, developing a formal Free Ridership Measurement policy for each program, moving toward greater electrical metering, and separating 'completed' from 'committed but not completed' project savings.
- Cost-allocation and Demand Side Management Cost Recovery Rider disputes were prominent: intervenors including the Consumer Advocate and the Avon Group challenged ENSC's preliminary allocation of ~95% of multi-sector Enabling Strategies costs to residential ratepayers, and the Board directed ENSC to develop a formal Cost Recovery allocation methodology (subsequently delivered by Elenchus Research Associates in September 2011) separating ratepayer-funded electricity DSM costs from taxpayer-funded non-electricity program costs.
- The Board accepted ENSC's proposal to apply the Total Resource Cost test at the program level rather than the individual-measure level, required ENSC to undertake stakeholder consultation on a multi-year performance-based model, approved inclusion of new programs such as the Home Energy Report behavioural pilot and expanded low-income/renter programming, and deferred a formal multi-fuels mandate pending further study of cross-subsidization risks.
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- E-1 Evidence - 2012 DSM Plan 2/28/2011
- E-10 Evidence of George Foote on behalf of CA 4/8/2011
- E-11 Evidence of Glenn Reed of Energy Futures Group on behalf of EAC 4/8/2011
- E-12 Evidence of Mel Whalen, Multeese Consulting, Board Consultant 4/8/2011
- E-13 Evidence of Tim Woolf, Synapse Energy Economics Inc., Board Consultant 4/8/2011
- E-14 Reply Evidence of Efficiency Nova Scotia Corporation 4/13/2011
- E-16 Revised Application - Appendix B Preliminary Program Cost Allocation (April 13-11) 4/14/2011
- E-17 NPB Opening Statement 4/18/2011
- E-18 HRM Opening Statement 4/18/2011
- E-19 Proof of Advertising 4/18/2011
- E-2 2010 DSM Evaluation Reports - Final Report - February 28, 2011 2/28/2011
- E-20 Efficiency Nova Scotia Opening Statement 4/18/2011
- E-21 CV Philippe Dunsky 4/18/2011
- E-22 ENSC Corrections to Evidence 4/18/2011
- E-23 DSM Cost Recovery Rider for 2010 and 2011 4/18/2011
- E-24 SNPI Responses to UARB Undertakings (U-1 and U-2) from NSPI DSM Plan for 2011 Hearing 4/18/2011
- E-25 Opening Statement of Glenn Reed, Energy Futures Group, on behalf of Ecology Action Centre 4/19/2011
- E-26 Excerpt from Summit Blue Consulting Report to Nova Scotia Power Inc. dated September 2006 4/19/2011
- E-27 CV of Hugh Gilbert Peach, Ph.D., H. Gil Peach & Associates/Scan America, Board Counsel Consultant 4/19/2011
- E-28 Excerpt from the Evidence of Nancy Brockway, dated April 19, 2010, from NSUARB-P-884(3) Hearing 4/19/2011
- E-3 2010 Savings Verification Study 3/25/2011
- E-4 ENSC (Avon) IR-1 to IR-10 3/29/2011
- E-5-(i) ENSC (CA) IR-1 to IR-55 3/29/2011
- E-5-(ii) ENSC (CA) Attachment to IR-23 3/29/2011
- E-6 ENSC (EAC) IR-1 to IR-43 (Revised April 6, 2011) 3/29/2011
- E-7 ENSC (Multeese) IR-1 to IR-31 3/29/2011
- E-8 ENSC (NPB) IR-1 to IR-11 3/29/2011
- E-9 ENSC (Synapse) IR-1 to IR-13 3/29/2011
- E-9(C) ENSC (Synapse) Confidential Attachment to IR-1 3/29/2011
- 05676 Hearing Order 11/4/2010
- 07313 Board Order 6/30/2011
- 07314 Board Decision 6/30/2011
- 05676 Hearing Order 11/4/2010
- 05677 Notice of Hearing 11/4/2010
- 06563 Preliminary Issues List 3/7/2011
- 06564 Final Issues List 3/21/2011
- 06797 Undertaking U-2 4/21/2011
- 06798 Undertaking U-3 4/21/2011
- 06934 EAC Final Submission 5/13/2011
- 06935 NPB Final Submission 5/13/2011
- 06951 ENSC Closing Submission 5/13/2011
- 06952 Avon Group Closing Submission 5/13/2011
- 06953 NSDOE/NSE Closing Submission 5/13/2011
- 06954 CA Closing Submission 5/13/2011
- 06957 Quetta Closing Submission 5/13/2011
- 07013 EAC Reply Submission 5/20/2011
- 07014 ENSC Reply Submission 5/20/2011
- 07015 NPB Reply Submission 5/20/2011
- 07313 Board Order 6/30/2011
- 07314 Board Decision 6/30/2011
- 07662 Status Report on 2010 Evaluation Recommendations and 2010 Savings Verification Study Action Items 7/29/2011
- 08028 NSPI proposed ENS DSM Cost Recovery Rider and DSM Cost Recovery Rider Balance Adjustment Charges by rate class effective from January 1 through December 31, 2012 9/30/2011
- 08030 Efficiency Nova Scotia Corporation - Cost Allocation Methodology Report - Prepared by Elenchus Research Associates Inc. - September 2011 9/30/2011
- 08067 Letter to Parties asking for comments on NSPI's proposed DSM Recovery Rider 10/6/2011
- IR-1 to IR-10 issued by Avon Group 06612 3/17/2011
- IR-1 to IR-11 issued by NPB 06611 3/17/2011
- IR-1 to IR-13 issued by Tim Woolf, Synapse Energy Economics, Inc. (Board Counsel Consultant) 06609 3/17/2011
- IR-1 to IR-31 issued by Mel Whalen, Multeese Consulting Inc. (Board Counsel Consultant) 06607 3/17/2011
- IR-1 to IR-43 issued by Ecology Action Centre 06613 3/17/2011
- IR-1 to IR-55 issued by Consumer Advocate 06610 3/17/2011