Home›Topics›Demand Side Management
Topic

Demand Side Management

157 matters discuss this 24631 passages 1628 documents First appeared 1982
Discussion volume over time
2018
2025
2026
1999 2026
On this topic
Filter & sort

157 matters — click to drill in

Where this is discussed

M131332026
Nova Scotia Power Inc. - Application for Financing Order authorizing the Securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider Open
32 passages · 3 docs
M131362026
NSPI DRO Appeal - Billing Issues - Cinia Djnakovic Open
1 passages · 1 doc
M131252026
Nova Scotia Power Inc. - CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0040106 – HYD Tusket Unit 1 Generator Refurbishment - $2,331,683 Open
1 passages · 1 doc
M131192026
Nova Scotia Power Inc. - 2027 Demand Side Management Cost Recovery Rider (DCRR) Open
30 passages · 12 docs
M131132026
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2025/2026 Annual Report Open
4 passages · 1 doc
M130832026
Nova Scotia Power Inc. - CI C0068718 – IT - DERMS Solution Project - $2,965,414 Open
38 passages · 2 docs
M130882026
Nova Scotia Power Inc. - 2026-2027 Time-Varying Pricing (TVP) Program Closed
2 passages · 2 docs
M130532026
EfficiencyOne - 2026 Q2 Demand Side Management (DSM) Report Open
53 passages · 3 docs
M130422026
Procurement Administrator - Power Advisory - Application for Approval of the Green Choice Power Purchase Agreement Open
1 passages · 1 doc
M130242026
Town of Antigonish Electric Utility - 2026 Amendment Application for Large General Customer Rates Closed
18 passages · 4 docs
M130142026
Nova Scotia Power Inc. - CI C0068719 - IT - Distributed Intelligence Apps - $3,165,790 Closed
12 passages · 3 docs
M130072026
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Fee Recovery Mechanism Application Open
17 passages · 7 docs
M130082026
Nova Scotia Power Inc. - RtR Market Elements Application - Approval of necessary tariffs, Terms and Conditions Open
17 passages · 2 docs
M129822026
NSPI DRO Appeal - Billing Issues - Ralph and Dennita Fitzpatrick Open
2 passages · 2 docs
M129692026
Berwick Electric Commission - 2026 Flow Through Application Closed
12 passages · 5 docs
M129472026
NSPI DRO Appeal - Meter and Power Consumption - Bernard Wentzell Open
2 passages · 1 doc
M129542026
Review of Nova Scotia Power Inc. Treatment of Variance Accounts Open
1 passages · 1 doc
M129432026
Town of Lunenburg Electric Utility (TOLEU) - 2026 Flow Through Rate Application Closed
15 passages · 11 docs
M129382026
NSPI DRO Appeal - Billing Issues - Anne-Louise Dauphinee Closed
1 passages · 1 doc
M129322026
Nova Scotia Power Inc. (NSPI) - Time-Varying Pricing Pilot Program - 2024/25 (Year Four) and 2025/26 (Year Five) Evaluation Reports Open
531 passages · 13 docs
M129202026
Nova Scotia Power Inc. - CI C0021839 IT - Customer Energy Management (CEM) 2025 Evaluation, Measurement and Verification (EM&V) Report Closed
33 passages · 5 docs
M129192026
Nova Scotia Power Dispatch Study Action Plan – Quarterly Update – Q2 2026 Closed
1 passages · 1 doc
M129162026
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 10-Year System Outlook Report for 2026 Open
16 passages · 7 docs
M129152026
NSPI DRO Appeal - Billing Issues - Doug Fulljames and Karen Ward Open
1 passages · 1 doc
M128822026
North American Electric Reliability Corporation (NERC) - First Quarter 2026 - Application for Approval of Reliability Standards Open
305 passages · 1 doc
M128872026
Nova Scotia Power Inc. - 2025 Short Run Marginal Cost (SRMC) Test to Rates Report Closed
29 passages · 3 docs
M128852026
Town of Lunenburg Electric Utility - Rate Cap Removal Closed
3 passages · 2 docs
M128832026
Nova Scotia Power Inc. - Affiliate Code of Conduct Report for 2025 Open
1 passages · 1 doc
M128752026
EfficiencyOne - 2026 Q1 Demand Side Management (DSM) Report Closed
47 passages · 4 docs
M128612026
Nova Scotia Power Inc. (NSPI) - 2026 Load Forecast Report Closed
228 passages · 22 docs
M128632026
Nova Scotia Power Inc. - 2026 Demand Side Management Cost Recovery Rider (DCRR) – Adjustments to OATT MEUs’ 2026 DCRR Direct Monthly Payments Closed
2 passages · 2 docs
M128572026
NSPI DRO Appeal - Billing Issues - Brad Neville Closed
2 passages · 1 doc
M128542026
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2026 Integrated Resource Planning (IRP) Open
16 passages · 3 docs
M128402026
Nova Scotia Power inc. - CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 (U&U) Closed
1 passages · 1 doc
M128452026
NSPI Complaint - Billing Issues - Malcolm Mills Closed
1 passages · 1 doc
M128352026
Nova Scotia Power Inc. - Annual and Regulated Financial Statements - 2025 Open
24 passages · 5 docs
M128322026
NSP Maritime Link Inc. (NSPML) - 2025 Affiliate Code of Conduct Report Closed
1 passages · 1 doc
M128222026
EfficiencyOne - 2025 Audited Financial Statements - December 31, 2025 Closed
16 passages · 1 doc
M128212026
EfficiencyOne - 2025 Inter-Affiliate Code of Conduct Annual Compliance Report Closed
1 passages · 1 doc
M128042026
NSPI DRO Appeal - Billing Issues - Jillian Coxhead Closed
1 passages · 1 doc
M127952026
Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000 Closed
3 passages · 2 docs
M127772026
NSPI DRO Appeal - Billing Issues - Miguel Adam Open
1 passages · 1 doc
M127862026
Nova Scotia Power Inc. - 2025 Storm Restoration Cost Report Closed
1 passages · 1 doc
M127802026
EfficiencyOne - 2027-2031 Demand Side Management (DSM) Plan Application Open
2845 passages · 143 docs
M127822026
Nova Scotia Power Inc. - Commercial Net Metering Program - 2025 Annual Report � Closed
3 passages · 3 docs
M127832026
Nova Scotia Power Inc. - Regulation 3.6 - 2025 Net Metering Report Closed
3 passages · 2 docs
M127682026
Nova Scotia Power Inc. - Extra Large Industrial Active Demand Control Tariff (ELIADC) - 2025 Annual Report Closed
32 passages · 13 docs
M127492026
NSPI DRO Appeal - Billing Issues - Christine Cameron Closed
28 passages · 9 docs
M127432026
Nova Scotia Power Inc. - CI C0068714 – IT – Identity & Access Management - $6,756,522 Open
1 passages · 1 doc
M127442026
Nova Scotia Power Inc. - CI C0080102 – 92H-331 Double Circuit Peggy’s Cove Rd - $4,303,210 Closed
1 passages · 1 doc
M127332026
NSPI DRO Appeal - Billing Issues - Dave Lincoln Closed
3 passages · 3 docs
M127322026
NSPI DRO Appeal - Meter Issues - Hunter Cooling Closed
2 passages · 2 docs
M127172026
North American Electric Reliability Corporation (NERC) - Fourth Quarter 2025 - Application for Approval of Reliability Standards Open
1 passages · 1 doc
M126962026
NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism Open
6 passages · 5 docs
M126942026
Nova Scotia Power Inc. - Cold Weather Event, January 23-26, 2026 Closed
5 passages · 4 docs
M126872026
Nova Scotia Power Inc. - 2025 COMFIT Annual Report Closed
1 passages · 1 doc
M126652026
Nova Scotia Power Inc. - Fuel Adjustment Mechanism (FAM) Audit, conducted by Bates White for 2024 and 2025 Open
28 passages · 4 docs
M126632025
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2026/2027 Revenue Requirement and Fees Application Open
10 passages · 4 docs
M126612025
Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP) Open
584 passages · 75 docs
M126602025
Nova Scotia Power Inc. - Natural Gas Report - November 1, 2024 to October 31, 2025 Closed
4 passages · 2 docs
M126472025
Nova Scotia Power Inc. - 2025 Consumer Advocate / Affordable Energy Coalition Low-Income Working Group Report Closed
1 passages · 1 doc
M126422025
Town of Mahone Bay (TOMBEU) - Amendments to Schedule of Rates and Charges - Deferred Revenue Recovery Closed
1 passages · 1 doc
M126192025
Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million Closed
43 passages · 16 docs
M126232025
Northeast Power Coordinating Council (NPCC) - Fourth Quarter 2025 for Approval of Revised Regional Reliability Criteria Closed
12 passages · 1 doc
M126002025
Nova Scotia Power - Cybersecurity Accountability Open
23 passages · 14 docs
M125912025
Nova Scotia Power Inc. - CI C0032664 – Energy Control Centre – Optimization Tools - $7,486,068 Closed
9 passages · 1 doc
M125882025
Nova Scotia Power Inc. - CI C0053699 – Renewable to Retail Implementation - $5,644,468 Closed
4 passages · 4 docs
M125792025
EfficiencyOne - 2025 Q3 Demand Side Management (DSM) Report Closed
65 passages · 3 docs
M125772025
North American Electric Reliability Corporation (NERC) - Third Quarter 2025 - Application for Approval of Reliability Standards Closed
1 passages · 1 doc
M125632025
NSPI DRO Appeal - Billing Issues - Beverley Burlock Closed
1 passages · 1 doc
M125582025
Review of NS Power's Five-Year Reliability Plan 2025-2029 Open
2 passages · 1 doc
M125542025
NSPI DRO Appeal - Billing Issues - Ralph Doncaster Open
2 passages · 2 docs
M125512025
Nova Scotia Power Inc. - 2026 Annually Adjusted Rates (AARs) Closed
76 passages · 17 docs
M125502025
To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012) Closed
16 passages · 8 docs
M125442025
NSPI DRO Appeal - Billing Issues - Leslie Axford Closed
1 passages · 1 doc
M125362025
NSPI General Complaint - Overhead Wires - Tye Laframboise Closed
1 passages · 1 doc
M125212025
Nova Scotia Power Inc. - Application for 2026 DSM Cost Recovery Rider (DCRR) Closed
52 passages · 17 docs
M124992025
Nova Scotia Power Inc. - Application for approval of 2025/26 Time Varying Pricing (TVP) Tariffs Closed
55 passages · 13 docs
M124572025
NSPI Complaint - Systemic Regulatory Compliance Issues - Blarney Stone Restaurant Closed
9 passages · 4 docs
M124512025
Nova Scotia Power Inc. - 2026 General Rate Application (GRA) Closed
491 passages · 54 docs
M124382025
EfficiencyOne - 2025 Q2 Demand Side Management (DSM) Report Closed
74 passages · 7 docs
M124362025
North American Electric Reliability Corporation (NERC) - Second Quarter 2025 - Application for Approval of Reliability Standards Closed
1 passages · 1 doc
M124122025
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Proposed expenditure and revenue requirements for test year ending March 31, 2026 Closed
12 passages · 6 docs
M124142025
NSPI DRO Appeal - Solar Billing - Karen Chetwynd Closed
3 passages · 2 docs
M124132025
NSPI DRO Appeal - Billing Issues - Adam Bowser Closed
1 passages · 1 doc
M123942025
NSP Maritime Link Inc. - 2026 Assessment Application - NSPML Closed
13 passages · 6 docs
M123712025
Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405 Closed
6 passages · 1 doc
M123492025
Nova Scotia Power Inc. (NSPI) - 2025 Load Forecast Report Closed
181 passages · 18 docs
M123502025
Nova Scotia Power Inc. - 2024 Short Run Marginal Cost (SRMC) Test to Rates Report Closed
23 passages · 3 docs
M123432025
NSPI Complaint - Power Connection - Roseview Developments Inc. Closed
3 passages · 1 doc
M123392025
Renewall Energy Inc. - Request for Tariffs for the Renewable to Retail Market Closed
2 passages · 2 docs
M123382025
NSPI DRO Appeal - Smart Meter Issues - Sherry Dennis Closed
6 passages · 5 docs
M122902025
EfficiencyOne - 2025 Q1 Demand Side Management (DSM) Report Closed
53 passages · 3 docs
M122822025
EfficiencyOne - New Benefit Cost Analysis Test for Evaluating Demand Side Management (DSM) Plans Closed
667 passages · 98 docs
M122732025
Board Inquiry into Nova Scotia Power's Cybersecurity Incident Open
37 passages · 14 docs
M122492025
EfficiencyOne - 2026 DSM Extension Application Closed
755 passages · 61 docs
M122472025
Nova Scotia Power Inc. - Evergreen IRP Action Plan & Roadmap Update Closed
11 passages · 9 docs
M122412025
EfficiencyOne - 2024 Audited Financial Statements - December 31, 2024 Closed
23 passages · 4 docs
M122402025
EfficiencyOne - 2024 Affiliate Code of Conduct Annual Compliance Report Closed
3 passages · 3 docs
M121862025
EfficiencyOne - 2024 DSM Annual Progress Report and 2024 DSM Evaluation Reports Closed
716 passages · 4 docs
M121772025
Nova Scotia Power Inc. - Distributed Energy Resource (DER) Integration Roadmap Open
43 passages · 3 docs
M121492025
Nova Scotia Power Inc. - Investigation arising from Joint Use Agreement between NS Power and Bell Aliant Closed
2 passages · 2 docs
M120302024
EfficiencyOne (EOne) for approval of a Supply Agreement – Behavioral Program Update Closed
9 passages · 7 docs
M119902024
Nova Scotia Power Inc. - WACC and AFUDC Rates Application for 2025 Closed
1 passages · 1 doc
M119832024
EfficiencyOne 2024 Q3 Demand Side Management (DSM) Report Closed
69 passages · 7 docs
M119382024
EfficiencyOne Complaint - Competition Practices - Hynes Closed
2 passages · 2 docs
M119272024
Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO) Closed
8 passages · 5 docs
M117642024
Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024 Closed
24 passages · 8 docs
M116892024
Nova Scotia Power Inc. (NSPI) - 2024 Load Forecast Report Closed
285 passages · 18 docs
M116772024
EfficiencyOne - 2023 Audited Financial Statements - December 31, 2023 Closed
35 passages · 3 docs
M116472024
EfficiencyOne - Behavioral Program Update Closed
32 passages · 14 docs
M116302024
EfficiencyOne - 2023 DSM Annual Progress Report and 2023 DSM Evaluation Reports Closed
501 passages · 6 docs
M113072023
P-884 - Nova Scotia Power Inc. - 2023 Evergreen Integrated Resource Plan (IRP) - Action Plan and Roadmap Closed
57 passages · 13 docs
M112212023
P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2023 Closed
17 passages · 4 docs
M111082023
P-194 - Nova Scotia Power Inc. (NSPI) - 2023 Load Forecast Report Closed
588 passages · 19 docs
M110942023
E-ENS-F-23 - EfficiencyOne - 2022 Audited Financial Statements - December 31, 2022 Closed
18 passages · 5 docs
M108302022
E-ENS-R-22 - EfficiencyOne - 2022 Rate and Bill Impact Analysis and Model Closed
110 passages · 7 docs
M106532022
P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2022 Closed
14 passages · 3 docs
M105692022
P-194 - Nova Scotia Power Inc. (NSPI) - 2022 Load Forecast Report Closed
319 passages · 21 docs
M105632022
E-ENS-F-22 - EfficiencyOne - 2021 Audited Financial Statements - December 31, 2021 Closed
17 passages · 3 docs
M104732022
E-ENS-R-22 EfficiencyOne 2023-2025 Demand Side Management (DSM) Plan Application Closed
2332 passages · 93 docs
M105042022
P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) Action Plan Update Closed
35 passages · 5 docs
M101002021
E-ENS-F-21 - EfficiencyOne - 2020 Audited Financial Statements - December 31, 2020 Closed
7 passages · 1 doc
M096892020
E-ENS-F-20 - EfficiencyOne - 2019 Audited Financial Statements - December 31, 2019 Closed
16 passages · 3 docs
M091632019
E-ENS-F-19 - EfficiencyOne - 2018 Audited Financial Statements - December 31, 2018 Closed
6 passages · 1 doc
M090962019
Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1) and Nova Scotia Power Inc.(NS Power), the establishment of a final agreement between the parties, and approval of a 2020-2022 Demand Side Management (DSM) Resource Plan Closed
2033 passages · 84 docs
M089292018
P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization Closed
768 passages · 21 docs
M088882018
E-ENS-G-18 - EfficiencyOne - Evaluation of DSM Programs - Application to allow inclusion of Non-Energy Benefits Closed
248 passages · 43 docs
M086042018
E-ENS-R-18 - EfficiencyOne - 2019 Demand Side Management (DSM) Plan Application, 2017 Annual Progress Report and 2017 Evaluation Reports Closed
2626 passages · 44 docs
M080592017
Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization Closed
122 passages · 21 docs
M075442016
E-ENS-R-16 - EfficiencyOne - Incentive Setting Methodology Review and Recommendations Closed
339 passages · 16 docs
M075432016
E-ENS-R-16 - EfficiencyOne Application for Approval of 2016-2018 DSM Resource Plan Matter deferred for DSM Advisory Group Collaboration Closed
139 passages · 7 docs
M071512015
E-R-15 - Nova Scotia Power Inc. (NSPI) - 2016-2018 DSM Plan - NSPI Cost Allocation Proposal Closed
139 passages · 26 docs
M067332015
E-ENS-R-15 - EfficiencyOne Application for approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between Efficiency One and Nova Scotia Power Inc.- NSPI - 2016-2019 DSM Plan Closed
1257 passages · 71 docs
M048192012
E-ENSC-R-12 - Efficiency Nova Scotia Corporation - Application for Approval of its Demand Side Management (DSM) Plan for 2013 - 2015 Closed
1261 passages · 59 docs
M036832010
P-141 - Nova Scotia Power Inc. - Request Approval of the 2011 Annually Adjusted Rates (AAR's) Closed
2 passages · 2 docs
M036692010
E-ENSC-R-10 - Efficiency Nova Scotia Corporation - Electricity Demand Side Management Plan for 2012 Closed
1488 passages · 60 docs
M036722010
E-BER-R-10 - Berwick Electric Light Commission - Interim Application to offer rates to commercial customers that will incent peak demand reduction Closed
20 passages · 5 docs
M036662010
P-188 - NSPI Regulation 3.6 - Net Metering - Request approval of the revised Regulation 3.6 Closed
17 passages · 7 docs
M036322010
BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT) Closed
32 passages · 15 docs
M035892010
CI# 40103 - P-510 - NSPI WO - Load Control Demonstration Project (U&U) - $4,293,793 Closed
54 passages · 6 docs
M035792010
P-884(3) - NSPI - Demand Side Management ("DSM") Cost Recovery Rider - January 1, 2011 through December 31, 2011 Closed
12 passages · 3 docs
M035082010
CI# 38857 - P-128.10 - NSPI WO - L7004 Deteriorated Replacements - $2,467,028 Closed
1 passages · 1 doc
M034522010
ENSC-TRAN - Efficiency Nova Scotia - Nova Scotia Power Inc. - Demand Side Management Transition Plan Closed
828 passages · 10 docs
M034532010
E-LUN-R-10 - Lunenburg Electric Utility - Request a change to the flow through formula used to calculate the NSPI Municipal Rate Class increases. Closed
2 passages · 2 docs
M034412010
P-884 - NSPI - 2009 IRP Update - Action Plan Status Report (1st Progress Report) Closed
12 passages · 4 docs
M034152010
NSPI CI# 38819 - $7,452,511 - 51V Tremont Circuit Breaker & Bus Closed
1 passages · 1 doc
M034172010
NSPI CI# 11004 - $1,990,631 - Canaan Rd. Circuit Breaker Additions Closed
1 passages · 1 doc
M034132010
CI# 39323; CI# 39626; CI# 39627; & CI# 39628 - P-128.10 - NSPI WO - (Digby Wind Project) Application for approval of capital work orders in the amount of $82.8 million for the acquisition, construction and interconnection of the Digby Wind Farm Project Closed
12 passages · 5 docs
M033472010
P-194 - NSPI - 10 Year System Outlook 2010-2019 - June 30, 2010 Closed
10 passages · 1 doc
M033242010
E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria Closed
25 passages · 5 docs
M031542010
P-111.6 - Nova Scotia Power Inc. - Approval of NSPI's Amended Accounting Policy and Procedures Manual. (US GAAP) Closed
17 passages · 8 docs
M030972010
CI# 28098 - P-128.07 - NSPI WO - Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864 Closed
1 passages · 1 doc
M030962010
P-199 - Nova Scotia Power Inc./Efficiency Nova Scotia Corporation - Request for Funding from NSPI Closed
13 passages · 6 docs
M030842010
CI# 30954 - P-128.10 - NSPI WO - LIN3 - ESP Gas Flow Modifications - $1,473,990 Closed
1 passages · 1 doc
M042651999
P-871 - Nova Scotia Power Inc. - Application for a Load Retention Rate (2000) Closed
65 passages · 9 docs
M03527
E-RIV-C-08 - Riverport Electric Light Commission - Rate Group dispute with one of its customers Closed
2 passages · 2 docs