2.BACKGROUND On April 30, 2025, NSPI filed its 2025 Evergreen IRP Action Plan and Roadmap Update. In this update, NSPI provided an update on electricity planning environment changes, an update on the Action Plan and Roadmap items to date,...
AI summary NSPI filed its 2025 Evergreen IRP Action Plan Update, referencing the Path to 2030 document and relying on prior modeling. The update includes resource pathway planning, electrification strategies, wind procurement, battery storage, and demand response. Resource trajectories are updated based on load forecasts from 2022–2025, with no new capacity modeling conducted.
030 (600 MW, 650 MW, and one accelerated electrification scenario with 900 MW). - d. Develop procurement plan for incremental renewable energy resources, targeting approximately 1000 MW by 2030. 14 The Electrification Report was published...
AI summary NS Power's 2023 Evergreen IRP outlines targets for renewable energy procurement (1000 MW by 2030), coal-to-gas conversions, battery storage (100 MW by 2030), and demand response programs (75 MW by 2025). It also addresses synchronous condenser development and DSM avoided cost updates. The Reliability Tie transmission project (Matter M12217) is highlighted as a key initiative.
5.RECOMMENDATIONS Synapse remains concerned that NSPI has stated in various documents that it expects to have 600 MW of CT capacity by 2030 but has not shown this as an outcome of the IRP or the IRP updates. Enough has changed since NSPI c...
AI summary Synapse expresses concern that NSPI's claim of 600 MW CT capacity by 2030 lacks IRP alignment. Recommendations emphasize updating the Evergreen IRP with new data, evaluating resource options, and carefully assessing CT capacity economics. Scenarios must consider Mersey rehabilitation costs and regional coordination with New Brunswick Power.