1 Request IR-11:
NON-CONFIDENTIAL 1 Request IR-11: 27 As the total conversion of 92H to 25 kV is not being considered, this design work is not 28 being pursued at this time. 1 Request IR-13: 2 3 In Attachment 1, Section 5.1.1, NS Power noted the following:...
AI summary The text discusses NS Power's response to a request regarding the utilization of hydro generation and its impact on system planning. It notes that due to drought conditions, hydro availability during winter peak seasons is unreliable, leading to the need for permanent system upgrades.