Topic/Matter Intersection

Topic:"Demand Side Management" in M12783

Matter: Nova Scotia Power Inc. - Regulation 3.6 - 2025 Net Metering Report
3 passages 2 documents

Demand Side Management across all matters →

N-12025 Report 1 passage
Response to 2024 NM Report (M12165) NSEB IR-3 p. pp. 13-14
Response to 2024 NM Report (M12165) NSEB IR-3 Category Metric 2023 2024 Change Impact on Payout Efficiency Loss7 NA NA 0.5% ↓ LNM Solar Array Adoption8 5,289 5,310 0.4% ↑ Nameplate 8 Capacity (kWac) 8.88 8.94 0.7% ↑ Interpretation

AI summary The response to the 2024 NM Report (M12165) NSEB IR-3 includes a table showing minimal changes in efficiency loss and a slight increase in LNM Solar Array adoption and nameplate capacity. The document also includes an interpretation section, though no details are provided.

N-2NSPI (NSEB) RIR 1 to 4 2 passages
1 Request IR-1: p. p. 3
1 Request IR-1: 2 3 Table 1 of the report presents a comparison of 2024 and 2025 data. 4 5 (a) What factors does NS Power consider contributed to the 30.9% decrease in net 6 metering customers. 7 8 (i) Did NS Power suspend program registra...

AI summary NS Power explains the 30.9% decrease in net metering customers by citing factors such as cost, incentives, and financing. The 26% decrease in nameplate capacity is attributed to reduced solar installations, though average capacity increased. A cybersecurity incident in April 2025 caused a delay in payouts, which were later resolved with manual meter readings. Spikes in August and November 2025 were due to the availability of true meter readings after the incident.

13 Table 1: Total Estimated Cost Reallocation from Domestic Net Metered Customers to 14 Customer Base by Exported Generation p. p. 3
13 Table 1: Total Estimated Cost Reallocation from Domestic Net Metered Customers to 14 Customer Base by Exported Generation Year 2020 2021 2022 2023 2024 2025 Domestic Net Metered Participants2 2,375 3,996 5,919 8,141 10,921 12,789 Export...

AI summary The text presents Table 1, which outlines the total estimated cost reallocation from domestic net metered customers to the customer base by exported generation from 2020 to 2025. It includes details on non-fuel costs, FAM AA/BA Rider costs, DSM Cost Recovery Rider (DCRR) costs, and Storm Cost Recovery Rider (SCRR) costs. The table is accompanied by a request for clarification on net metering summaries and avoided costs for solar generation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →